This is the list of works i sent out for a quotation.
All quoted prices listed by the above IDs are not inclusive of electrical works.
A. DESIGN SERVICE
1 Interior design and space planning layout
2 Consultation selection of home furnishing
3 Detailed Perspective/ Construction Drawings
4 Hassle-free Project Management, Site Supervision, Coordination & Rectification
5 Provide floor protection sheet for whole house floor
6 Apply for HDB permit/approval
7 Arrange and coordinate Gas Works with PUB
8 Arrange and coordinate Air Conditioner installation and work with 3rd party provider
9 Arrange and coordinate for Electrical Wiring and work with 3rd party provider
10 After Sales Service
11 After sales warranty 3 years
B. DEMOLITION WORKS
1 Hacking of existing floor and wall tiles for MBR Toilet
2 Hacking of existing floor and wall tiles for Common Toilet
3 Hacking of toilet bowl, basin and basin concrete supports for MBR Toilet
4 Hacking of toilet bowl, basin and basin concrete supports for Common Toilet
5 Dismantle existing MBR Toilet door
6 Dismantle existing Common Toilet door
7 Dismantle existing MBR door
8 Dismantle existing 2 Common Bedrooms doors
9 Dismantle existing Kitchen to service balcony door
10 Dismantle existing Study glass windows
11 Dismantle existing Common Bedrooms glass windows
12 Dismantle existing MBR glass windows
13 Dismantle existing MBR Toilet glass windows
14 Dismantle existing kitchen glass window
C. MANDATORY AFTER-DEMOLISH WORKS
1 Sand and Haulage Fee (transportation + delivery etc)
2 Debris fee (Clearance of rubbish and left over materials etc)
3 Acid cleaning / Chemical wash + General Washing till it is move/stay in condition
4 Laying of floor protection
D. MASONRY WORKS
1 Supply and lay 600mm x 600mm polish homogenous floor tiles c/w skirting for living area (up to $3.50 psf)
2 Supply and lay 600mm x 600mm polish homogenous floor tiles c/w skirting for dining area (up to $3.50 psf)
3 Supply and lay 600mm x 600mm polish homogenous floor tiles c/w skirting for common passage to rooms (up to $3.50 psf)
4 Supply and lay 600mm x 600mm polish homogenous floor tiles c/w skirting for 3 bedrooms (up to $3.50 psf)
5 Supply and lay 300mm x 300mm non-slip homogenous floor tiles c/w skirting for kitchen
6 Supply and lay 300mm x 300mm non-slip homogenous floor tiles c/w skirting for MBR Toilet
7 Supply and lay 300mm x 300mm non-slip homogenous floor tiles c/w skirting for Common Toilet
8 Supply and lay 300mm x 450mm ceramic/homogenous wall tiles for kitchen
9 Supply and lay 300mm x 450mm ceramic/homogenous wall tiles for MBR Toilet
10 Supply and lay 300mm x 450mm ceramic/homogenous wall tiles for Common Toilet
11 Apply waterproofing membrane at kitchen according to HDB standard
12 Apply waterproofing membrane at MBR Toilet according to HDB standard
13 Apply waterproofing membrane at Common Toilet according to HDB standard
14 Construct 50mm washing machine base with tiles finish
15 Construct 50mm fridge base with tiles finish
16 Construct 50mm kitchen cabinet base with tiles finish
17 Supply and construct shower kerb for MBR toilet with tiles finish
18 Supply and construct shower kerb for common toilet with tiles finish
19 Levelling of existing drop at balcony area to match living area floor height
20 Supply and lay cement screed / non slip homogenous floor tiles for service balcony
E. PLUMBING WORKS
1 Supply and replace whole house piping to stainless steel (hot/cold pipe for 2 toilets)
2 Supply and replace new stainless steel piping for washing machine
3 Supply and replace new conceal drain pipe for washing machine
4 Supply and replace new stainless steel piping for sink
5 Supply and replace new conceal drain pipe for sink
6 Supply and provide labour to install new kitchen sink and tap
7 Supply and provide labour to install basin and tap for MBR Toilet
8 Supply and provide labour to install toilet bowl for MBR Toilet
9 Supply and provide labour to install instant heater for MBR Toilet
10 Supply and provide labour to install basin and tap for Common Toilet
11 Supply and provide labour to install toilet bowl for Common Toilet
12 Supply and provide labour to install instant heater for Common Toilet
F. Doors/Glass/Windows
1 Supply and install 10mm tempered glass shower screen at MBR toilet c/w hand rail & towel rail
2 Supply and install 10mm tempered glass shower screen at common toilet c/w hand rail & towel rail
3 Supply and install acrylic bi-fold door at MBR toilet
4 Supply and install acrylic bi-fold door at common toilet
5 Supply and install acrylic bi-fold door at store entrance
6 Supply and install wooden door for Master bedroom
7 Supply and install wooden door for Common bedroom 1
8 Supply and install wooden door for Common bedroom 2
9 Supply and install sliding door for kitchen entrance
10 Supply and install windows x 6 to Living Room, 2 Common Bedrooms, Master Bedroom, Study Room & Service Balcony
11 Supply and install windows x 2 to MBR toilet & Kitchen
G. Carpentry Works
1 Kitchen: Top & bottom solid plywood cabinet in laminate & ABS trimmings finished c/w anti slam soft closing hinges, dish tray, handles, drawer & oven space catered
2 Kitchen: Solid surface top for cabinet
3 Kitchen: Supply & install stove, cooker hob & hood
4 Master Bedroom: Design, fabricate/supply & install laminated built-in wardrobe c/w sliding door
5 Common Bedroom 1: Design, fabricate/supply & install laminated built-in wardrobe c/w sliding door
6 Supply and install Vanity counter top for MBR Toilet
7 Supply and install Vanity counter top for Common Toilet
H. PAINTING WORKS
1 Supply and provide labour to paint whole house internal walls and ceilings (3 layers Nippon wash & wear / Pentalite range up to 8 colours)
2 Supply and provide labour to paint all door frames, main gate, pipes
3 Supply and provide labour to revarnish existing main door
I. ELECTRICAL PLANNING AND WIRING
1 Supply, install new and / shift wire points
2 Supply, install new and / shift 13Amp power points
3 Supply, install new and / shift Telephone points
4 Supply, install new and / shift SCV TV points
5 Supply, install new network cable points
6 Supply and rewire whole house wiring
7 Cater space/make way for upcoming optical fibre lines (installing March to May 2010)
J. OTHERS
1 Simple cornice
2 Supply and install bamboo rod holder for clothes hanging at service balcony
After consideration and reduction of works to meet our budget, kitchen and toilet tiles will not be touched. Windows will not be changed as well. Hope this brings down the quote to <$25k