Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

serene85

Members
  • Content Count

    40
  • Joined

  • Last visited

Posts posted by serene85


  1. hello guyssss!

    hasn't had any updates since my house is all completed.

    oh yar, we just changed the pipes in the toilet, to the plastic ones. ;)

    been in the house for a month already, everything's fine.. we are comfy & happy.

    my sis decided to do a built-in wardrobe at her house too after seeing mine, haha^^

    good luck to all those in the midst of renovating! this forum sure helps alot & i got many ideas from the friendly peeps here! :D


  2. 15030_393340034919_607529919_3825961_266

    super comfy sofa! our favourite spot!

    15030_393340044919_607529919_3825963_238

    dining table (chairs were later replaced with full black ones as these were stained/scratched from their previous delivery)

    15030_393340059919_607529919_3825966_723

    new shoe cabinet (wanted a built-in but forgo idea since it will take up too much space)

    15030_393340104919_607529919_3825972_475

    my kitchen (nothing was done, except a through cleaning. haa^^)


  3. My room.. ;)

    15030_393340019919_607529919_3825958_386

    super-single storage bed, ceiling fan & roller blind

    15030_393339999919_607529919_3825954_398

    3-door wardrobe & built-in mirror

    15030_393340004919_607529919_3825955_319

    my l-shape console.. ignore the mess (hasn't had time to tie up the cables when takin pic, lol)

    15030_393340014919_607529919_3825957_886

    cute & sweet wall clock from hourstyle

    15030_393340124919_607529919_3825975_539

    cute cushions for my 2 schnauzers :P


  4. :horse: i'm backkkkkkkkkkkkk! so sorry for the lack of updates!! been really really busy for the past week!

    we've finally settled down & had our house-warming last saturday, 08 May 2010 !! :D

    some pics after all the carpentry was up, all furnitures in, tv/soundbar wall mounted & touch-up painting was done eg.

    15030_393340079919_607529919_3825969_822

    15030_393340084919_607529919_3825970_128

    Living Room

    15030_393340039919_607529919_3825962_116

    15030_393340054919_607529919_3825965_127

    Feature wall w/ suspended tv console

    to be continued..


  5. congrats serene. you are one of the fastest reno to be completed i have seen... :good:

    hannor. no choice since we doing contra & promised buyer to handover keys w/i 2 weeks.

    thus we had been kept mad busy since we got the keys on 16th! ;)

    luckily all the aircon/electrician/contractor all non-strangers.. else i doubt we can finish on time for house-warming next week


  6. 280420101120.jpg

    Working very hard for 3 days straight for uplifting of materials!

    280420101114.jpg

    My handsome/funny cousin cum contractor cum designer. He was there everyday to make sure things goes right, help us sign upon delivery of furnitures & eg. :thumbs up:

    290420101130.jpg

    Simply lovessssssss my console. Shall fix up the TV & eg. onto it tomorrow~

    :sport-smiley-018:


  7. yippeeeeeeee! my carpentry works will be completed today!! :sport-smiley-018:

    final measurement : 20 April

    completion of carpentry works @ home : 30 April

    10 days!! amazinggggggggg! :jawdrop: really salute my contractor & his worker for working so hard & doing OT to rush out this project for us! :thumbs up:

    280420101110.jpg

    Feature wall w/ suspended tv console up! :dancingqueen:

    280420101111.jpg

    Built in headboard w/ dresser table for bedroom 2

    280420101118.jpg

    Suspended TV Console for MBR

    290420101127.jpg

    L-shape suspended console for bedroom 1 (my room!)


  8. new ceiling fan w/ lightkit, ceiling lights & dining table set

    270420101105.jpg

    For Bedroom 1 (aka my room!)

    240420101092.jpg

    For MBR & Bedroom 2

    240420101095.jpg

    For Kitchen x 2

    260420101101.jpg

    Roller blinds x 3 bedrooms (thicker, blackout whole bedroom even in daylight)

    Living room has the standard, thinner material that has abit of see-through, will post pic later.


  9. C_look_look; the 'contractor aka designer is my cousin. :P

    I gave him ideas of what i wanted, he drew up the 2d drawings & upon confirmation of design/colors, he got his workers to do up all the carpentry works.

    no major renos, we only did carpentry works;-

    feature wall + suspended tv console (living room)

    built-in wardrobes (all 3 bedrooms)

    suspended tv console (MBR)

    suspended L-shape study table (bedroom 1)

    built-in headboard w/ dresser (bedroom 2)

    other misc stuffs;-

    whole unit repainting

    add new/shift electrical points, additional tv points & tel sockets

    changed new sanitary wares

    changed new door locks & new door stoppers (gate, main door & 3 bedrooms doors)

    :dancingqueen:

    COV is 28K.


  10. sure thing aida81! will post some pics tomoro morning - forgot to bring hp to work today.

    carpentry is 1/2 way done when i got home yesterday! really must thank the contractors for rushing & OT for our sake. :)

    simply loves my new feature wall w/ suspended tv console! :dribble:


  11. :horse:

    We've officially moved & shifted into the new house last Sunday - 25 April :D

    Past few days have been kept very busy unpacking. New sanitary wares are up, roller blinds up, windows/grills locks changed!

    Uplifting of carpentry today & tomorrow, all the built-in wardrobes, tv consoles & feature wall will be up..

    Yippeeeee, can't wait!!


  12. Oooo.. im arranging for window contractor to come down on Monday noon too, for change & install new 'locks' for the window grills..

    the current ones have abit of problem locking, some of them had rusted & the key can't turn..

    since living in a low-floor unit now.. think it's better to change the locks.. :P


  13. All uppppppppppppp!;-

    20 April 2010

    Mitsubishi Sys3 Inverter

    Electrical points (additional, shifting, rewiring), 3 x TV points, 2 x Tel points

    Ceiling Light (Living Room)

    Hanging Pendant Lights (Dining Area)

    21 April 2010

    2nd Coat Painting


  14. hmmmm.. our 4-room resale flat.. previous owner reno the whole house 2 yrs ago, toilet bowls still looks ok & working well..

    we debated for a while but decided to change a new set once & for all.. mainly - yes, hygiene purpose & for a peace of mind when using it..~ ;)

    anyway, we just got the package from KS Lighting (2 toilet bowls w/ auto sit cover, 2 wash basins, 2 taps & 2 toilet lights) = $880.00

    *delivery & installation next monday together w/ my ceiling fan

    *the lady assured that it WILL NOT affect the wall/floor tiles at all, i seriously hope so because we are not doing anything to the tiles.. :unsure:

×