Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

tkt511

Members
  • Content Count

    1
  • Joined

  • Last visited

Community Reputation

0 Neutral

About tkt511

  • Rank
    Newbie

Previous Fields

  • Gender
    Male
  1. Hi all bros / sis, I've just received a quotation from my designer and it seems so expensive to do up only my master bedroom and the roof terrace. MASTER BEDROOM: 1. To patch and make good wall after hacking ($250) 2. To supply and raise up flooring for extension of master bedroom using polyform w/cement screeding ($450) 3. To supply and install 2 side wall for pocket sliding door using gypsum board w/paint finish 8ft ($980) 4. To supply and install solid-ply laminated sliding door for entrance to master bedroom c/w top track system ($750) 5. To supply and install lintel support for bi-fold door and entrance area ($1350) 6. To supply and install aluminium powder coated bi-fold door 80sft ($3200) 7. To construct and build wall using solid brick between balcony and master bedroom 5ft ($750) 8. To supply and install fix glass for the extension w/aluminium frame ($680) 9. To design and install false ceiling c/w cove lighting effect 242sft ($1600) 10. To supply and box up column using gypsum board w/paint finish ($350) 11. To design and install suspended half height TV feature wall using laminated finish ($650) 12. To design and install low height TV console using laminated finish 4ft ($720) 13. To design and install wooden ledge at bay window area using laminated finish 19ft ($1140) ROOF TERRACE: 1. To supply and install composite roofing above new bedroom area ($3200) 2. To supply and install 1500mm x 400mm awning using solid polycarbonate kapo wood support ($1800) 3. To supply and install Chengai decking at balcony area ($5250) 4. To design and install a exterior feature using exterior pattern tiles 160sft $4/sft ($2150) STORE ROOM: 1. To supply and install homogenous floor tiles inside store room 53ft $2.90/ft ($500) 2. To supply and install tick-tak door for store room using MDF board and internal polyester w/paint finish ($380) 3. To provide plastering using ultra hard compound powder with chemicals to all walls and paint finish ($1350) 4. Labor to provide haulage service, uplift materials, plus clear & discard debris ($650) Pls. advise me whether should I go ahead and sign up for this renovation?????????? TKT511
×