Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

nobme

Members
  • Content Count

    1
  • Joined

  • Last visited

Community Reputation

0 Neutral

About nobme

  • Rank
    Newbie

Previous Fields

  • Gender
    Male
  1. Hi all just got a resale 4rm flat at jurong area below is the quote please advise. To supply labour to hack living/dining area, 3 bedroom, 2 bathroom floor/wall tile and kitchen floor and wall tiles - $3,000.00 (Inclusive of debris) To supply labour and material for laying floor tiles for living/dining area and 3 bedroom(Base on $3 tiles) - $4,800.00 To supply labour and material to lay burmese parquet 3'' skirting for living/dining area and 3 bedroom - $705.00.00 To supply labour and material to lay floor/wall tiles and membrane water proofing for kitchen - $5,325.00 To supply labour and material to lay floor/wall tiles/ curb and membrane water proofing for common toilet - $1580 To supply labour and material to lay floor/wall tiles/ curb and membrane water proofing for Master bedroom toilet - $1620.00 To supply labour and material to construct kitchen cabinet base - $250.00 To supply labour and material to plaster whole unit exclude ceiling - $2,200.00 - 19,480 To supply labour and material to construct suspended TV console lenght 6ft with selected lamination finish in living area - $600.00 To supply labour and material to construct kitchen cabinet with selected lamination finish and ABS trimming, total lenght 20ft - $2,000.00 To supply labour and material to install solid surface for kitchen cabinet top lenght 8ft - $640.00 To supply labour and material to construct sliding wardrobe(bottom slide) with selected lamination finish and ABS trimming for master bedroom lenght 5ft - $1100.00 To supply labour and material to construct standing TV console with 3 drawer lenght 5ft with selected lamination finish in master bedroom - $550.00 To supply labour and material to construct casement wardrobe with selected lamination finish and ABS trimming for bedroom 2 lenght 5ft - $1000.00 To supply labour and material to construct casement wardrobe with selected lamination finish and ABS trimming for bedroom 3 lenght 5ft - $1000.00 To supply labour and material to install Shower screen sliding door for master bedroom toilet - $650.00 To supply labour and material to install Shower screen swing door for common toilet - $550.00 To supply labour and material to install master bedroom toilet door slide and swing system - $299.00 To supply labour and material to install common toilet door slide and swing system - $299.00 To supply labour and material to install Lower ceiling in living/dining area - $900.00 - 9,588 To supply labour and materail to install. - Lighting point - 10x$35 - $400.00 - Single power point - 5x$55 - $275.00 - Double power point - 10x$60 - $600.00 - A/C point - $120.00 - heater point - $120.00 - cooker and hood - $120.00 - Earth wire - $100.00 - TV point - 2x$100.00 - $200.00 - Tel point - 3x$55 - $165.00 - install lighting - 10x$10 - $100.00 - Install ceiling fan - 3x$45 - $135.00 - DB box - $380.00 - PUB testing - $300.00 To supply labour and material to paint whole unit, sealer and 4+1 paint - $1650.00 Total amount for above - $ 33,733.00 Thanks.
×