Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

aegis

Members
  • Content Count

    87
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by aegis

  1. Hi Whisper, heard from 1 of the dealer that RB-3SS is using cast iron not stainless steel is it true? Also how is the fire, big enough on the max? I'm getting the RB-3SS or RB-3SS(GB) which is the temper glass version as i like the placement.For the RH-382 i also don't know whether noisy or not. Any recommendation of quite hood?
  2. Today i will go over the house again to do a careful check since i also want to see the new windows installation status. Will feedback to Donald. So far really unhappy over the toilet work.
  3. Initially i also headache on where i put my Plastic modelling desk and my entertainment system. Since i'm living alone i decide to shrink my kitchen area so i can have the best of both world. When the cabinet is up, you will see that it's really very small. Will bring my dad together this Sunday to go Poh Seng to look at the sanitary wares, maybe i go recce at Universal Union this sat to see the prices 1st. After this should be busy looking for lighting.
  4. HI Rover, as promise this is the top view floor plan provide by my ID.
  5. Hi Rover, yes that area will be my plastic modelling area. Initially want to set it up at the common room but my friend poison me to setup a home entertainment room after i experience his. I have feed back to the ID that i'm not very happy about the work on toilet. He say he will find solution to the issue i bring up. Will do a scan on the floor plan given by my ID(Hardcopy).
  6. Some photo update. Remember the issue with the toilet tiles. I do not know whether did they remove the issue tiles and relay, but i saw the white cement is apply and you can't see much difference. I did not take close up picture for this. Another issue with the toilet tiles. You can see it's not even and i guess even after apply the white cement you still see the difference in height. Also find this puny little drainage cover in the bathroom area. Feedback to the ID that this is different from what he say he will lay. Another view of the kitchen taken from the kitchen toilet door. My half height wall is up and left the glass to finish it off which will be done at later stage. Basically tiles for living room, MBR, common room and store room is done. Tomorrow will tear down the old window and install the new window as per ID update.
  7. Toilet Basin Kitchen Basin Joven Storage heater as i want to install rain shower. PS Boss recommend me to get Ariston TI-shape 15 saying better heat retention. Need to place order by next week so my ID can get the toilet done soon.
  8. Door frame for my MBR. My half wall is up that divide the kitchen and my work area. Another picture of the kitchen. Went to Poh Seng to look at some Sanitary ware. Toilet bowl 1. Toilet 2.
  9. Went to my house today to look at the progress as i did not check on it on fri and sat. Surprise to see a worker unloading cement at the toilet. Here are some of the picture. Tiles lay at the doorstep. Kitchen wall tiles up except the 1 near the window. Another shot of kitchen wall tiles. Status of toilet. Spot some problem. There are gap between some tiles. Have inform the ID to look into it.
  10. Hi Rover, i'm ok with the pipes exposed. Do not wish to box up the pipes although may look out of place. The 3D drawing does not have the pipes cos the ID forgot to tell the 3D guy that there is 2 pipes there.
  11. Hi Rover, there will still be 2 entrance. Kitchen and MBR, so when the guest come, they will use the kitchen entrance and i will lock the entrance in the MBR if i do not want my guest to go into my MBR.
  12. Thanks. Will keep posting update as the reno goes along.
  13. Went up to my house this evening after work. Living room is almost done except the area near the main door. Store room is done. Picture from the main door. Picture from kitchen side. Work done on the kitchen. Still a long way to go. Wall cement.
  14. I think metalbone is right. The guys started work yesterday but i did not go down to look as i knock off from work quite late last night. Will go down tonight to see the progress.
  15. No sure why. Did not call them to ask. Reno going to take 2 month starting from the day of hacking.
  16. Went over the flat today, seem nothing is done. So no picture update today.
  17. Will do. Going to see the status this evening after work.
  18. HI SClofthouse, initially i also communicate mostly with Andy. Donald took over once the reno started. Donald also is the 1 who brought me to select my tiles and liaising with me on the status of my house.
  19. Hi BuyNow7, yes i will install aircon. 1 in the living room and the 2 bedroom. Was quoted 3258 for system with 1x18,000btu unit and 2x9000btu units. Will rewire the whole house.
  20. Sand loaded at the common room Master bedroom Seem the tiles have yet arrive which i can't blame them as i given my ID confirmation quite late last night. Will update again next week.
  21. Last day of hacking. Went to the house after my work. Here is the picture of the current status. Living room Living room view from kitchen Kitchen Another view of kitchen Kitchen toilet
  22. Hi SClofthouse, so at this moment you can see from my progress how is the work of 9 Lives before your house start reno in Sept. From the 3D picture you can see that anything that is not the floor will be white. White Tiles and white paint, so that why i chose the brown tiles to give it a more contrast look. Donald at 1st kept advise me to go for the grey tiles which he say he visualise the outcome will be nice, but later when the 3D picture is out he admit that the brown color combo also very nice. I chose the brown in the end because it's what i want in the 1st place. So hope your reno starting in sept will be as smooth as possible.
  23. @veryboliao - Thanks. @stardust205 0 The toilet is not very big, just the 3D picture make it look very big.
  24. Yup. I have told my ID to proceed for the brown tiles. Hope the real thing look as good as the picture.
  25. Hacking started yesterday, but did not went there to check only went today. Living room Kitchen Another picture of kitchen Master Bedroom door frame removed. Wall between 2 toilet hack.
×