Everything posted by metalbone
-
Our Mb Home @ Pioneer
Reno Day 2. Tiles, cement, waterproofing stuff have arrived.
-
Our Mb Home @ Pioneer
Reno Day 1 (cont)
-
Our Mb Home @ Pioneer
Thanks. Will try to post more pics!
-
Our Mb Home @ Pioneer
Reno Day 1 Hacking hacking and more hacking!
-
Our Mb Home @ Pioneer
Our tiles selection:
-
Our Mb Home @ Pioneer
Reserved for pics when renovation ends.
-
Our Mb Home @ Pioneer
Some pics of our house before renovation
-
Our Mb Home @ Pioneer
Finally is our turn to start our T-Blog! We are currently in the midst of renovation. We bought our HDB 5I house around April but only start our renovation in June. We search around 1.5mths before confirming our ID. It was really a tiring process. Hopefully we chosen the right one. Our ID spotted the water leakage from external and advised us to contact the town council to fix it. We manage to get the town council to patch it before the renovation starts. Our floor plan: Type: Resale 5I HDB Size: 111sqm
-
RenOContractor Needed
How about wall tiles for kitchen and bathroom? Mine was a corner unit, that why is 111sqm, all the rest of the flat in my block was 110sqm. I dunno where is the extra 1sqm.
-
RenOContractor Needed
My floor area is 111sqm 5 room HDB, not that big. How much was your tiling works?
-
RenOContractor Needed
Not really le, I got a few quotes from a few ID, similar pricing Designer wall tiles ( 300 x 600)mm for 2 bathrooms - full height Designer wall tiles ( 300 x 600)mm for kitchen - expose parts Heavy duty flooring tiles for kitchen and 2 bathrooms ( 300 x 300 )mm 600x600mm homog.P/L tiles for living,dining and passageway 600x600mm homog.P/L tiles for 3 bedrooms Skirting for homogeneous flooring Some even quote 12k just for tiling
-
RenOContractor Needed
Rewiring of whole house electrical will be around $3k and tiling easily ~8k-10k for all whole house liao. Try to cut down on the carpentry works if possible.
- Fernvale Vista 2
-
Fernvale Vista 2
Yup his name starts with Bxxxxx Lx. I wasted 1 month waiting for him and he didn't turn up for 2 appointments with us! He also promised to call us but didn't.
-
Fernvale Vista 2
I also have similar experience with one ID. Don't tell me is the same one.
-
My Home @Jurong West
All my quotations are >40k but I do want to change all my floor tiles in my whole house so I guess it add to the total cost.
-
My Home @Jurong West
Hi, I also live in the 65X Jurong area! I am also currently searching for ID. My renovation list is quite similar to yours but all the quotations I got so far were quite big figure. Have you chooen which ID?
-
Home Renovation Loan
http://www.google.com.sg/url?sa=t&source=web&cd=17&ved=0CD0QFjAGOAo&url=http%3A%2F%2Finfo.maybank2u.com.sg%2Fpdf%2Floans%2Frenovation_loan_application_form.pdf&rct=j&q=reno%20Flat%20Rate%20Payable%20in%20Advance&ei=cF3bTYaKIInsrQf9sJDdDg&usg=AFQjCNGEH3UX76Ylr-9AKo4HIDtXoQBGxA&cad=rja Looks like Maybank 2.98% flat rate is not really 2.98% effective interest rate. Flat Rate Package Interest for Renovation Loan is calculated on a flat rate, initial added on basis. Effective interest rate ranges between 5.62% p.a. and 7.97% p.a., depending on the package and the loan tenure selected Loan Amount < S$15,000 3.68% p.a. Loan Amount => S$15,000 2.98% p.a. Bundled with Home Loan 2.88% p.a.