  1. Hi, so far we have used the dishwasher a few times. Sometimes half load, sometimes full load. So far so good. All very clean. Can't comment more Cos this is the first time we are owning a dishwasher.
  2. And we have reached the end of all my posts!! Decided to finish all the posting in a day, just in case i get lazy to finish them off. Wanted to post to give back to renotalk for all the yrs of postings i have been reading and they were indeed very useful in helping me plan for my new house. =) and also a way to thank my contractor, Valiancy, for their works and accommodating our needs to move in quickly. It was definitely an enjoyable process that I went through with my hubby, but once is enough.. hahahaha.. very tiring.. cannot imagine myself going through another renovation again...
  3. Toilets Bathtub from Sim Siang Choon (Derwent 16501) Master toilet sink from watertapz Mirrors from Ikea
  4. Living room & dining room Dining table from commune Tv console from home gallery The rest from Ikea
  5. Kitchen and the area around Borsh dishwasher - SMS50E82EU Borsh Oven - HBN331E2J Fujioh hood and hob - FX900, 3773SVGL LG FRIDGE - GRB208
  6. Service Yard Samsung washing machine wd0804 Stainless steel top from Ikea Rinnai Citygas heater
  7. Week 6 - day 50 After week 5, we moved in with some pending works. Electrical works for kitchen, paint touch up, carpentry, etc... Everything was a blur with so much to pack and unpack. So we reached our final entries on the finished looks ! The Master bedroom Bed and frame from Serta. Wished we could have nicer colour frame but since our package came with free frame, better don't waste. Our drawers from Ikea, Malm series.
  8. Week 5 (continueeee) 8. Bomb shelter shelvings from yee-sin 9. Quartz installation from Iquartz.
  9. Week 5 (continue) 5. Shower screen in both toilets 6. Ceiling light fan bought and installed from Chan Huat. We bought Rainlite from Crestar Love the fans. looks very cute! 7. Curtains from Kenneon curtains from JB
  10. Week 5 The week with the most activities. Right before we move in. 1. Service Yard Window by contractor 2. Water pipe from citygas heater to toilet done. Due to space constraint at the top, they had to route the pipes to the floor and up again. We were concerned with safety. What if the pipe is too hot and someone or a kid touches it. Alex boxed up the pipes below for us for free. 3. Kitchen carpentry partially up 4. Carpentry for our storage cabinet
  11. Week 4 1. Installation of our bedroom wardrobes. Our master bedroom wardrobe is casement door. and we did drawers at the bottom so that we can have better organisation of our clothes and easy assess. We chose this laminate colour to match the malm series in Ikea which we were going to get for our bedroom as malm is cheap and good. For bedroom 3, due to lack of space, we did sliding door and we upgraded the sliding door mechanism to Hafale sliding door mechanism as we did not like the feel of the default sliding door. 2. Delivery of our kitchen cabinets Our only blum system (tandembox which can take up till 100KG). This box is for us to put our sauces for easy access during cooking.
  12. Week 3 1. Painting We could not decide on the colour and after looking through the nippon paint book for a few days, we decided to go for all white although we were allowed to choose up to 4 colours. Instead of 4 colours, we chose only one and requested to Alex to paint our ugly red skirtings to white in exchange. and we are very pleased with the outcome. 2. Installation of window grilles by U-Gate 3. Installation of lights by my hubs. ( to save money and to learn some DIY). We only asked our contractor to install our downlights for our L-Box 4. Delivery of our bedroom wardrobes
  13. Week 2 1. Our hacking request was approved by HDB in less than a week and down went the wall. Made the house brighter and bigger after the hack. 2. Installation of doors by Yon tat. 3. Installation of our bathtub in our master bedroom 4. Installation of shower kerb in common toilet 5. Kitchen base cement
×