Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Simontsh

Members
  • Content Count

    287
  • Joined

  • Last visited

Posts posted by Simontsh


  1. Just curious, I see that all your water pipes are enclosed in the walls? Correct me if I'm wrong but didn't HDB only allow for external water pipes and not those that are hidden?

    And also, did you ask the contractor to use putty to cover up and smoothen all the gaps and holes of the electrical trunking? It can prevent insects from craling in and also look very nice!

    You mean for the toilets? All built by HDB. So i guess they can decide to be conceales or not?

    Will check on the electricals


  2. erm..first time i see an electrical point so near the dish drainer and sink. :P

    May I know how much u paid for the sink?

    Thanks

    yes that is my pet peeve with HDB. this portion was intended to be the cooking point initially. even worse right? :bangwall:

    anyway the plan is to add sockets at the point where the wires are dropping down. all switches will be there. then cover up the existing one with water proof covers.

    cannot shift since need to hack tiles which i dun intend to....

    sink from hoe kee....was 580 before discount.....but i took a package from them including hob and heater.


  3. the only 2 small errors we identified

    photomgl.jpg

    the console has 2 tones of laminate. carpenter explained that they need to do the abs trimming on the rounded edges....that's why can only try to match.....is this true??? or just hala me one?

    photoont.jpg

    then the divider in MBR like wrong dimensions. :dunno: the top part of the divider....can put what wor....space so small....


  4. bro, your progress looking good! seems like next up will be ya carpentry works since 1st coat painting and lights are up liaoz. :good:

    also cant wait to see ya LED lights up! :notti:

    u're right :)

    today went down to take a peep.

    photo1fi.jpg

    photo2qi.jpg

    its a warzone!

    photo3xt.jpg

    last time mentioned common room shower screen up. here's the pic. notice they removed the original basin too. vanity already there.

    photo4yd.jpg

    tv console also arrived...but design i think something wrong. will talk to ID


  5. Hi NeoBy, after conversion from mm to ft, the cabinets is about 15ft in length incl the tall full ht tower cabinet. the laminates we chose for the kitchen cabinets are from Lamitak.

    ooh haha, i got my inspiration from the LUMIER3 cube mood lamp but find it quite costly, so got down to DIY-ing one myself.

    i got the RGB LED light bulb with remote from aliexpress, the floor lamp is bought locally and made up of 120 quadrilaterals assembly.gif

    the total cost slightly over $100 thereabouts.

    can pm me where to get the floor lamp? thanks in advance! :sport-smiley-004:


  6. hmm good idea bro~

    let me ask my contractor is he able to do this hehe

    Now, i dono how should i order the LED Strips?

    Im having black and white kitchen cabinet, would like to use Orange to reflect my black backsplash effect maybe require 25ft length

    ScreenShot2011-11-23at103106PM.png

    MBR and Common bathroom= on top and below the mirror may need 8ft Orange LED Strips

    Living hall and MBR feature wall: Orange for top and bottom for the feature wall 20ft length

    MBR Wardrobe: 6.5ft for Orange LED Strip

    Shoe cabinet: Orange as well for 4ft length

    Should i get RGB SMD LED 5050? is this the brightest among others LED series?

    I may need total length of 63.5ft in total OMG so scary haha :notti:

    ScreenShot2011-11-23at102056PM.png

    63.5 feet = 19.354 8 meter :rolleyes: OMG~~

    ScreenShot2011-11-23at102034PM.png

    ok ma

    i brought in almost 15m+5m RGB, 20M WW and 5 M normal white.....

×