 
			 
					
				
				
			Rover
Members- 
				Content Count382
- 
				Joined
- 
				Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by Rover
- 
	Window blinds up:
- 
	Rain shower up: Mirror in shower area:
- 
	Mixer up: Heater up: Toilet bowl & sink up:
- 
	Welcome welcome Hope to see ur reno progress soon. U'll definitely enjoy the process. For the kitchen windows, u may wish to consider putting up blinds lor, tho not many ppl put up blinds or even curtains for kitchen windows. I'm putting up blinds for mine cos I hacked off the wall between kitchen n living room, thus no privacy if there's no blinds. Lol.. Do u do heavy cooking? If yes, better to either invest in a powerful hood if u are not intending to put up glass doors in replacement of the hacked wall.. Btw, our layout n orientation are exactly the same
- 
	PMed. My rough quote can be found on the 2nd pg of my thread.
- 
	Noted. But scratches are inevitable the very moment we start using right?
- 
	Kitchen solid top done: Kitchen storage cabinet done:
- 
	All tops installing by today: Tml chemical wash liao
- 
	I'm equally as enthu as u, my fren lol
- 
	Aircon drainage pipe 'boxed up' wif tiles: Let there be lights (toilet vanity light - awaiting installation of mirror): Common toilet entrance PD door: Switches at island:
- 
	Mine is under the total reno contract. U can see the breakdown frm my previous post.
- 
	It was a collaborated brainstorming.. Y leh?
- 
	Anyone got lobang for purchasing of pinball machine? Also, whether need license to own one anot? PM me if not convenient to discuss in public domain
- 
	Study table & wardrobe up: Aircon up: BLUM!!!
- 
	Ordered the following items frm Ikea: Study room chair: Dining chairs: Balcony chairs: Kitchen relax chairs: Extra chairs (foldable):
- 
	Duno wor. Cos I leave it to my ID to settle the lights.
- 
	So excited. Final stage of reno liao.. Next week will be doing the final touch-up, installations of all the minor works for the carpentry & table tops. After dat final chemical wash & can hand over the hse le. Furnitures delivery will be next weekend. Yet to scout for suitable dining chairs & balcony chairs/table for my cosy/smoking corner tho.. Targeted move-in date: Week of 28th Jan
- 
	Bottom line: work within the space for the freedom thou seek..
- 
	Of cos onsite measurements are impt too. Also, certain planning gotta wait for other stuffs to be in place before deciding, so dat we can gauge the actual measurements n the practicality onsite.
- 
	TV feature wall done: * awaiting black mirror to be installed on the feature wall.
- 
	MBR wardrobe: * awaiting installation of doors & joining of study table. Shower glass door installed: MBR door installed:
- 
	Side kitchen cabinet/storage done: Toilet vanity done: * awaiting installation of solid top, sink & mirror.
- 
	Main display/storage/shoe cabinet done: * movable boxes which will be placed at the open display shelves. * awaiting installation of black mirror & internal shelvings.
- 
	Main door and gate: Hood & sink installed: * awaiting solid top for kitchen, granite top for dining & cooker hob to be installed on Mon.
- 
	Haha.. Datz why I always say dat space planning is impt My granite is one piece.

 
			
				