Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Rover

Members
  • Content Count

    382
  • Joined

  • Last visited

Everything posted by Rover

  1. Rain shower up: Mirror in shower area:
  2. Mixer up: Heater up: Toilet bowl & sink up:
  3. Welcome welcome Hope to see ur reno progress soon. U'll definitely enjoy the process. For the kitchen windows, u may wish to consider putting up blinds lor, tho not many ppl put up blinds or even curtains for kitchen windows. I'm putting up blinds for mine cos I hacked off the wall between kitchen n living room, thus no privacy if there's no blinds. Lol.. Do u do heavy cooking? If yes, better to either invest in a powerful hood if u are not intending to put up glass doors in replacement of the hacked wall.. Btw, our layout n orientation are exactly the same
  4. PMed. My rough quote can be found on the 2nd pg of my thread.
  5. Noted. But scratches are inevitable the very moment we start using right?
  6. Kitchen solid top done: Kitchen storage cabinet done:
  7. All tops installing by today: Tml chemical wash liao
  8. I'm equally as enthu as u, my fren lol
  9. Aircon drainage pipe 'boxed up' wif tiles: Let there be lights (toilet vanity light - awaiting installation of mirror): Common toilet entrance PD door: Switches at island:
  10. Mine is under the total reno contract. U can see the breakdown frm my previous post.
  11. It was a collaborated brainstorming.. Y leh?
  12. Anyone got lobang for purchasing of pinball machine? Also, whether need license to own one anot? PM me if not convenient to discuss in public domain
  13. Study table & wardrobe up: Aircon up: BLUM!!!
  14. Ordered the following items frm Ikea: Study room chair: Dining chairs: Balcony chairs: Kitchen relax chairs: Extra chairs (foldable):
  15. Duno wor. Cos I leave it to my ID to settle the lights.
  16. So excited. Final stage of reno liao.. Next week will be doing the final touch-up, installations of all the minor works for the carpentry & table tops. After dat final chemical wash & can hand over the hse le. Furnitures delivery will be next weekend. Yet to scout for suitable dining chairs & balcony chairs/table for my cosy/smoking corner tho.. Targeted move-in date: Week of 28th Jan
  17. Bottom line: work within the space for the freedom thou seek..
  18. Of cos onsite measurements are impt too. Also, certain planning gotta wait for other stuffs to be in place before deciding, so dat we can gauge the actual measurements n the practicality onsite.
  19. TV feature wall done: * awaiting black mirror to be installed on the feature wall.
  20. MBR wardrobe: * awaiting installation of doors & joining of study table. Shower glass door installed: MBR door installed:
  21. Side kitchen cabinet/storage done: Toilet vanity done: * awaiting installation of solid top, sink & mirror.
  22. Main display/storage/shoe cabinet done: * movable boxes which will be placed at the open display shelves. * awaiting installation of black mirror & internal shelvings.
  23. Main door and gate: Hood & sink installed: * awaiting solid top for kitchen, granite top for dining & cooker hob to be installed on Mon.
  24. Haha.. Datz why I always say dat space planning is impt My granite is one piece.
×