Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

denimart

Members
  • Content Count

    199
  • Joined

  • Last visited

Posts posted by denimart


  1. Rewind...

    Two months before I received my keys, I am sourcing high and low for wood flooring and getting quotation for it. Both me and wife having been working in environment with timber flooring, we knew how comfortable and good to have wood flooring and we both share the dreams to build our home with timber floor for many years. Now is the time to realize it. First we visited woods & woods to look at their engineer floor...they were over priced and out of our budget. Laminate floor is out of question as we both knew how horrible laminate flooring could be, plus its not even real wood. Then i finally found this supplier of timber floor from RT, visited the workshop a couple of times and finally narrow down to burmese teak and American white oak. Guess which one we are using??

    The beginning: Was struggling between Burmese teak in 95mm and 120mm width...

    IMG_0781.jpg

    IMG_0777.jpg

    IMG_0933.jpg

    Both of us totally fall in love with the white oak when we visited this project site at CCK...

    IMG_1160.jpg

    IMG_1098.jpg


  2. Hi,

    May i know what is the reason for your walls to be put on pending from HDB? Currently i am facing the same situation as HDB claimed that the walls which i wana hack are pre cast walls.

    So in the end what is the result after you appeal?

    Hi, i never appeal. I merely wrote an email to ask them to faster approve the items for hacking due to the demolition date is almost over. Then the next day all the items(walls) for hacking were approved! What happened is becos they(HDB) approved the permit for reno first but those walls to be hacking are still on pending. Before they approve the walls to be hack, i actually got worry and ask my contractor will they reject? But my contractor v calmly told me not to worry sure approve but they like to drag cos the actual duration period for them to get back and approve is normally 2 weeks. My contractor only applied for the permit slightly more than a week earlier before the actual demolition date approved.


  3. Picture take during eve of Labour Day

    I mention my con resubmit for a later date for the demolition of walls again...it suppose to be schedule on 2nd May till 5th May. But like i say before, my contractor v fast hand and leg....at this time those walls were already hacked down. Efficient is the word to describe, our heart were totally eased with him handle our work. The tiny kitchen looks so much spacious after hacking away the wall and same to the toilet too! Thats how i envision it to be, real result shows.

    After kitchen wall hacked away...

    DSCF2074.jpg

    DSCF2076.jpg


  4. Pardon us as we do not have fancy 3D drawing, didn't expect my contractor to come out with one too. Anyway I can visualise most part of whats going to happen to our house but of cos with the help of my wife and the contractor. My contractor is good in design sense too as he not only was a contractor but actually with ID background. Somehow he prefer people to regard him as a contractor (not sure the real reason). He belongs to the old school NAFA ID generation so he is no good in computer rendering of 3D, but i knew he was one of top 5 graduates during his time. Sometime i'm not sure of the look and feel i will consult him, he understand what i want to achieve from this housing renovation. We are quite clickable.

    These pics were taken during eve of Labour Day. Sand were already deliver to my place....still pretty neat.

    DSCF2077.jpg

    DSCF2075.jpg

    DSCF2073.jpg


  5. Service and Conservancy Charge (SC/CC), monthly fee payable to Marine Parade Town Council. Usual is $50 per month for 4 rooms HDB flat, some months got special rate at 50% off. Go open the letter box, you got quite a lot of mails!

    The hardware parts are a mixture of blum and hettich. They are not expensive, just that not all carpenters are certified to install them, that is why ID command a higher price tag if customer request for it. I want to show you the workmanship so you can request the same from your carpenter.

    Oh mind, thanks for informing me. I will check the mailbox tonite...didn't expect to receive so many mails since we are the new owners. I will sms u if we can make it on weekend to view your workmanship, hope we can make it!! Hey, how many chance can the new owner and the ex owner meet at the same reno forum..lol


  6. From master bedroom...

    DSCF2048.jpg

    Quite happy that this system wardrobe is given to someone and will be given a new life again.

    DSCF2052.jpg

    At this time, all the aircon and trunking has already been removed. Contractor did a fast and clean job.

    DSCF2050.jpg

    DSCF2051.jpg


  7. Our demolition date starts from 23-25 April, my contractor really fast hand fast leg in taking down the tiles and tearing down the unnecessary stuff. At this moment, the few walls which suppose to be hack are still on pending. I kept calling the officer from the permit dept but the call forever get engaged. Finally my contractor advise me to pen an email to him, next day early morning i check HDB site and it got approve!? But by this time is already 25th, so my contractor rearrange a later hacking date and also submit a later date for demolition permit again. Anyway, talk about my contractor he is **** good, the day they tear down anything regardless tiles or wood structures...his workers will clear the debris away in the same day. Knew what, no ciggie butt can be found in the house too. His theory is he has to make sure his place are clean and so is a respect to the homeowners. He do not allow his workers to mess up the house, his theory again is so the subcon or other workers will take his works seriously and follow instruction knowing that the main contractor is not a person to be trifle with. If they see the house they work is dirty and ciggie butts everywhere, they will not take their job seriously. Quite respect on those theory though.

    DSCF2010.jpg

    The aircon was take down very soon after this pic is taken...the wardrobe in the common bedroom already had torn down. Empty area on the right. Note the debris was clean up.

    DSCF2011-1.jpg

    Kitchen

    DSCF2033.jpg

    Kitchen clean up!!

    DSCF2071.jpg

    Wall will be tear down the nextime u see it.

    DSCF2069.jpg


  8. Cement screed reminds me of my grandma kampong house

    Innitially i quite like cement floor, but me and wifey agreed that we love the other flooring more which we are investing on...is like dream come true. We been talking about having our future home to have this flooring since few years back, now we are really getting it. Hang on... :sport-smiley-018:


  9. Because most of the HDB layouts are squarish and yours is more like rectangular shape and i like the fact that your kitchen has two sides with windows. This will brighten up the kitchen!

    Yeah, really. It is quite windy from kitchen and pretty bright from the windows too. Totally agreed :D


  10. Wow great buy.

    Is the Teka sales still on? I'm looking for oven. Where is the sales?

    Hi pineapple, about 2.5 weeks ago Teka having 3 days sale at UE sq. Pity now no more. I used to think Teka is some cheap brand until i reach the showroom and shocked by their retail price...apparently Teka is even pricer than Brandt or Bosch on all similar products.


  11. Rewind..

    Items we already bought:

    Brandt induction hob TI607BU1

    BRANDTTI607BT1-500x500.jpg

    Brandt built in steam oven FV1000X

    fv1000x.png

    Teka built in oven HKX790, got it at a steal during Teka sale...60% off the retail price $2150

    teka-hkx-790-37574.jpg

    Haven't decide on chimney hood so far.


  12. Pokey is such an adorable bear! Congrats on house purchase, may I know which area is this? The layout is unique.

    Hi, is at old airport. Never really thought of the layout when purchasing this place, more into the feeling when we step into it. However i always thought the layout is pretty straight forward? Maybe u can share with us why u feel unique? thanks


  13. LOL... when i saw the photo of keys, there is a special feeling rushing to me. Cant wait to see your renovation progress. If you wish to see my carpentry workmanship and materials use so that you have a better understand of what to expect from your carpenter, you can come over during the weekend.

    Oops... forgot to tell you you have SC/CC reminders from Town Council, maybe you can drop by Marine Parade Town Council to open your SC/CC account.

    Albt, what is SC/CC? Oh we will try to go over to your house over the weekend if we can make it, would be nice to see your carpenter workmanship like i thought. Are u using alot of blum system? Too costly so we may skip it. Recently got tied up with work even over the weekend and we still left with alot alot of things haven't purchase..omg


  14. Welcome aboard! Is the floor cement screed apart from the kitchen and toilets? If so, :good: can save money on hacking. Previous owner's layout idea quite unique, being 8 yrs ago. The house looks spacious.

    Hi, yes the floor is cement screed but we will have it transform later :sport-smiley-018:


  15. So the pokey88 is the wife, and pokey is bought from denimart? Hehe... Just joking. Nice house condition. The ex owner must have requested a lot of COV for the condition of the house?

    I would consider the COV we paid is more realistic COV price in this area bah.


  16. Rewind...

    Ok rewind abit, few weeks before the key collection. My wife saw this in the mag and made me promise to buy it for her, then next we are at egg3 purchasing the last piece. Vintage rocking chair from London.

    IMG_1158.jpg

    IMG_1159.jpg


  17. Welcome to RT and Congrats!!! :sport-smiley-004:

    The layout are quite special for an 11 years old flat. hhhmmmm.... and already have built in WIW and big big MBR. Your reno can save a lot leh....

    Hi, whatever u guys see from the above pic. They are all gone by now, we ask the contractor to hack all away...so basically everything are rebuild from basic again except the storeroom. ;)


  18. Hi denimart and pokey88,

    Our valuation was among the highest in that neighborhood, therefore we told Ron so long the selling price hit the amount we want, we will let it go. We have settled in our new place, if both of you wish to visit us to see our renovation, just SMS me.

    Omg, Albert is that u? Hows the new place? If so, what a small world..ha. When we have time we definitely wana view your new place again...its been really tiring with this reno.

×