Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

greenbluehair

Members
  • Content Count

    5
  • Joined

  • Last visited

Community Reputation

0 Neutral

About greenbluehair

  • Rank
    Member

Previous Fields

  • Gender
    Male
  1. Just wanna settle peaceful. That my offer if he doesnt accept i will take illegal action.
  2. Nope didnt contact bca, but i went CASE to have some free consultation by them. It will not be tat nice to leave thing hangly around that why i approached the screw up contractor again to nego on the termination of contract as i do not wish to have any more problem that might arise in the future. Here my draft letter for him to sign tml if not i will be going to Tribunal. Mutual termination of contract Dear xxxx, This letter shall acknowledge our mutual agreement to cancel and terminate the contract between us Dated 15/03/2012; without further recourse by either party. With discussion on 15/03/2012 with you, you have agreed on repairing the damages caused to the property. The rectification of the damages are listed, 1) clearing of choke sewage 2) replace damage parquet flooring and polishing, 3) rectification of false ceiling which was damage, 4) 3 door frame and door rectification. These points are to be made good. As such I will be paying you back another $5000 once all the rectification had been fixed properly and the work has to be satisfactory after my inspection Best wishes, xxxx xxxx xxxx Acknowledgement Name : I/C: Date: END OF LETTER
  3. Here are some picture i havent got the time to upload the rest. here a few preview. http://www.flickr.com/photos/77027493@N05/with/6982259431/
  4. I will not disclosed the company right now. Btw i stay in landed is it possible for me to go to HDB to complain on my damages? I had contacted the boss and he told me that anything settle on the phone will do, he got a good scolding from me for replying that and i had draft out an agreement asking them to sign to repair back my damages and also mutual termination of contract. If they persistently dont wish to agree i would pursue this matter to Tribunal court.
  5. Few week ago i had a renovation of my kitchen and two toilet, the contractor i hired had done a seriously bad job in hacking wall and flooring causingd amaging to my property. 1)My Conceal water pipe, gov gas pipe was being damage while the hacking was done. 2)Two of my door frame was also damage and my door was not able to close. 3)A cardboard layer was place on my parquet but this doesnt not prevent water from causing them to turn black and mouldy. 4)Damge of my false ceiling This 4 points are the more curial part that happen through out the house. The contractor even ask me to pay for the damage of what they had done pushing away the blame. I had told the contractor that i do not wish to carry on and he said i need to pay 14k - 7k(deposit) = 7k outstanding. I didnt agree on the 7k outstanding as i feel that the damage they done i need to hire another contractor to repair. i had attached the invoice document. Should i bring this up to Consumers Association of Singapore (CASE) or file a Tribunal case?
  6. Hey, is tay heng long renovation the lady u contacted alice tay?

×