Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

CharisOng

Members
  • Content Count

    91
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by CharisOng

  1. Here you go.. http://detail.tmall.com/item.htm?spm=a220m.1000858.1000725.132.r8TvHP&id=13894279608&_u=61slspavbd8b&user_id=797585128&is_b=1&cat_id=2&q=&rn=22a17ea1e563fd9e4ef41d3ce7464043
  2. Taobao. I didnt see any spotlight with 3 bulbs in 1 panel. Btw its LED spotlight.
  3. Done! Hehe I'm quite glad about that. Status Update: Day 27 (24 May 2014) I forget to update on this when the chemical washing has been done. My MBR toilet floor grouting detached and washed away. I have to get BSC to do the grouting after the reno completes.
  4. Status Update: Day 32 (29 May 2014) Living Room My Eiffel Tower Dining Light
  5. Status Update: Day 31 (28 May 2014) Kitchen Cabinets
  6. Status Update: Day 31 (28 May 2014) My Top Drawer of my MBR Wardrobe. For ties, belts, accessories etc. There will be a glass panel on top but yet to install. MBR Wardrobe with all the drawers up (without doors) MBR Wardrobe (Doors installed) - @Korilala, the doors wont hit the light when we open it. Tested & proven. Haha Shoe Cabinet False Wall for my MBR TV
  7. Status Update: Day 29 (26 May 2014) Carpentry starts today! My ID send me 3 pics of the work-in-progress. They start work around noon or after noon.. Met my ID after work today to confirm the position of the bathroom accessories for the installation schedule this friday. He will oversee the installation so I no need take leave. Window & Grill installation also this friday. My FIL most likely will be dropping to help us oversee the installation. Soooooo excited to see the cabinets are almost done. I didnt take the kitchen cabinets cuz there's still no lights in my kitchen. And paranorma mode dont have flash. Lighting likely be installed fully by thursday.. Here are 3 more pictures. MBR Wardrobe Top & Bottom Cabinet @ Living Room TV Console
  8. Pmed already. Sorry that I could not provide breakdown cost to protect my ID.
  9. Hmm its 29k-30k range. Not inclusive of electrical.
  10. not economical to send back for replacement bah. Shipping cost to and back, you can order another one liao. I didnt think so much. To me, if spoil den buy replacement from sg. Cuz some lightings are really expensive in sg. Like the foyer light & mbr entrance light. My id say sg selling around 200-400 sgd. My foyer light only 6sgd exclude shipping & the mbr entrance light only 33 sgd. So if spoil, den decide bah. haha.. those lightings that always use one, like cove lighting t5s i buy from sg.
  11. I use peeka. Not all the lights are being installed. around 70% installed liao. Only 1 downlight got problem
  12. Yup agreed! Finally there's light when we visit after work. If not always have to use handphone flashlight.. Yes most of them are bought from taobao. I only bought led strip & t5 from singapore. The ceiling lights are all from taobao. Hmm I have 2 downlights. The one on the left starts to flicker ytd night & it lags when switch on. After much discussion with my hubby, we are going to purchase 2 downlights from sg and get it replaced.
  13. Status Update: Day 22 (19 May 2014) Part 1 of Lighting has been installed. Remaining lights will only be install either by this week or after carpentry (together with power points). Enough of talking, let the pictures do the talking..
  14. Status Update: Day 19 (16 May 2014) Third day of painting... Galaxy paint is up.. My ID informed me that this galaxy paint requires another 2 coating which will be done after the capentry is up. Here are the pictures my ID took for me..
  15. Pink rules!! Hmm you get your keys already? If haven, ask ur ID design something for u lor. I also dunno mine got wow factor anot. haha.. Status Update: Day 13 (10 May 2014) Sorry for jumbled update. I forgot to update that I collected my taobao from Peeka!! Total 12 parcels! Peeka Staff helping us loading them up to our vehicle. Of cuz my hubby got help too. Lucky all the parcels are not heavy. Bling Bling Hello Kitty Mirror for my dressing table! Hello Kitty Mirror for my MBR toilet My "Apple" LED ceiling lights.
  16. Ya lor.. I think I saw you too.. I saw a couple peek in but u all walk off. I was waiting for the aircon guy to finish doing the piping. Wait till i fall aslp. XD Super tired. & HOT.. Aspialle, if you drop by and I'm there, just approach us. We dont mind letting you in for see see look look. Status Update: Day 18 (15 May 2014) Painting done halfway. Not free to drop by so my ID snap pic of my 2 bedrooms for me. Hehe.. Both me n hubby like pink. So pinky pinky! Hmm both rooms pink paint are of different code. But seems like both look same tone XD. Bedroom 2 Nippon Odourless Easywash - Sweet Pink (1104) Nippon Vinilex 5000 - Orchid White (1139) Bedroom 3 Easy Wash with Telfon - Carnation Pink (8189) Nippon Vinilex 5000 - Orchid White (1139) Living Room & Bedroom Nippon Vinilex 5000 - Swansdown (5075) Nippon Vinilex 5000 - Galaxy (5069) Btw my ID arranged for us for the gas piping to be installed. I also not sure when is the exact date of the installation. So far, seems like he has been dropping by our unit everyday. Cant wait for the cabinets installation. My lighting installation has been delayed due to painting cannot be completed by today.
  17. Around 29-30k.. I really have no budget to do overlaying. I spent too much on my electronic stuff.. I cant help it when I see IT stuff. >.< Linsullen, thanks! I will try to update frequently.. Status Update: Day 15 (12 May 2014) Aircon guy from Gain city came to install air con pipings. They suppose to come on 10 May 2014. I went down to Changi City Point Branch on 24 Apr 2014 to fix the 1st appt for installation (10 May) and made 50% deposit. They normally will block 1 week of schedule, cuz I tried to look 3rd May slot and it was blocked already. So in case I couldnt get a sat installation, I went down to the same branch on 7 May to book 31 May for 2nd installation. This aircon salesperson who attended to me, changed my 1st installation date to 31 may. I waited like a fool on 10 May for installation from 9.30am. Their service hotline only open at 11am. So I can only call after 11am. When I found out my appt was moved, I was sooooooo furious!! But their schedule was fully packed on 10 May. Hence reschedule to 12 May (Mon). Had to take leave for that, if not all my work delay. Due to this, my false ceiling cannot complete as the false ceiling guys suppose to come on Monday to box up the pipings. hai.. no choice.The painting guys had to start painting first and see whether the false ceiling guys can complete the box up before the painting guys finish by this fri. If not it will remain unpainted till the painting guys come back to touch up after the carpentry are up. Here are some pics of the aircon piping.
  18. Aspialle, I'm not doing overlaying. Heard that overlaying tiles may cause tiles to pop in future. Dont have the extra $$ to do toilets.. For me, is either do everything best/to my liking or let it stay original till I have the capability. XD
  19. Status Update: Day 8 (05 May 2014) Ooo.. False ceiling up halfway... My false wall at dining area also up. So excited... Curtain Pelmet False Ceiling @ Common Walkway TV Feature Wall Area False Wall @ my Dining Area
  20. Status Update: Day 7 (04 May 2014) Finally some electrical work.. Materials for the false ceiling & false wall has been delivered. **I dunno why I rotated in photobucket, it still shows as not rotated.. =(
  21. Status Update: Day 5 (02 May 2014) Cabinet base done up. Master Bedroom toilet curb done too. Nth much had been done other than these 2.
  22. HansamuQ, I think you seen it in Blacklisted ID/COntractor FB group. Hmm I have yet to email Ciseern. Haiz. Too much on my mind nowadays, still have to draft email to them. Sian. Collected my padlock keys from bsc. Closed the defects list although there are some other defects not done yet. They ensure that they will resume after my reno. They gave me another defect form to fill in and ask me to continue look out for defects (if any) and write in the list.
×