Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

triton

Members
  • Joined

  • Last visited

Everything posted by triton

  1. Hi fellow talk member, I am been a follower of renotalk. Recently we have chat with ID. I think the design said that using mirror and glass will make the design more expensive. Our is a 4 room standard flat Based On WET WORKS LIVING / DINING ROOM Supply Labour & Materials To Lay 600mm x 600mm Homogeneous Floor Tiles 436 sqft 3,270.00 > Selection of Tiles: Up to $3.50 psf > Includes: Skirting using Cut Tiles 3x BEDROOMS Supply Labour & Materials To Lay 800mm x 800mm Homogeneous Floor Tiles 524 sqft 3,930.00 > Selection of Tiles: Up to $3.50 psf > Includes: Skirting using Cut Tiles KITCHEN / YARD Construct Tiled Cement Base (Sides Only) for Kitchen Cabinets 1 unit 180.00 Construct Tiled Cement Base for Refrigerator 1 unit 100.00 Construct Tiled Cement Base for Washing Machine 1 unit 100.00 COMMON TOILET Supply Labour & Materials To Over-Lay Homogeneous Wall Tiles 1 area 850.00 > Selection of Tiles: Up to $2.50 psf > Excludes: Border/Special Tiles Construct Tiled Cement Shower Kerb 1 area 150.00 MASTER TOILET Supply Labour & Materials To Over-Lay Homogeneous Wall Tiles 1 area 850.00 > Selection of Tiles: Up to $2.50 psf > Excludes: Border/Special Tiles Construct Tiled Cement Shower Kerb 1 area 150.00 CEILING WORKS Construct False Ceiling/Light Boxes/ Light Holders **** Room, Dinning Room & Passage Way Area 3 areas 1,200.00 Construct False Ceiling/Light Boxes/ Light Holders At Master Bedroom Area 1 area 950.00 Construct Curtain Pelmet **** Room (Window Areas) 1 unit 150.00 Construct Curtain Pelmet At Master Bedroom (Window Areas) 1 unit 150.00 CARPENTRY WORKS NOTE: Unless otherwise stated, all Carpentry Works quoted herein are constructed using Solid Plywood w/ Laminate/Veneer Finishes only. Where design/specifications include materials other than Solid Plywood w/ Laminate/Veneer Finishes, relevant charges will apply subject to further quotation(s) & confirmation. BOMB SHELTHER (STORE ROOM) Supply Labour & Materials To Install Designed Feature Door c/w Tea Mirror Finishing As Per Design Proposed 8 feet 2,360.00 LIVING ROOM Supply Labour & Materials To Install Designed Feature Wall c/w Laminate & Tea Mirror Finishing As Per Design Proposed 9 feet 2,250.00 Supply Labour & Materials To Install Designed TV Console c/w Laminate & Tea Mirror Clad With Drawers As Per Design Proposed 8 feet 960.00 KITCHEN Supply Labour & Materials To Install Built-In Kitchen Cabinets - High-Quality Laminate Doors w/ ABS Trimmings (Internal: Colour Polykern)39 ft run 4,290.00 > Includes: Choice from FULL RANGE of LAMITAK 2008/09 Laminates (Latest) (Excludes: Metallic Laminates) > Includes: Selected Designer Handles/Knobs > Includes: 1 Pc Aluminium-Framed Frosted Glass Door > Includes: 1 Set Drip-Dry Dish Rack Supply Labour & Materials To Install Built-In Tall Unit Kitchen Cabinet - High-Quality Laminate Doors w/ ABS Trimmings (Internal: Colour Polykern) 2 feet 540.00 Supply Labour & Materials To Install Granite Surface Top 17 ft run 1,870.00 > Includes: Standard Back-Splash & Front-Edge Profiling Add-On: Undermounting of Kitchen Sink 1 unit 80.00 MASTER BEDROOM Supply Labour & Materials To Install Built-In Full-Height Wardrobe w/ Laminate & Aluminum-Frame Frosted Glass/Mirror Silding Doors As Per Design Proposed (Interior: White Polykem) 12 feet 3,240.00 Supply Labour & Materials To Install Designed TV Console c/w Laminate & Tea Mirror Clad With Drawers As Per Design Proposed 5 feet 600.00 Supply Labour & Materials To Install Designed Full-Height Feature Wall Cum Bed-Head c/w Imported Fabric Or PVC Cushion Finishing As Per Design Proposed 9 feet 2,655.00 Supply Labour & Materials To Install Bedside Table 2 units 500.00 BEDROOM 2 Supply Labour & Materials To Install Built-In Full-Height Wardrobe w/ Laminate & Aluminum-Frame Frosted Glass/Mirror Silding Doors As Per Design Proposed (Interior: White Polykem) 7 feet 1,890.00 BEDROOM 3 Supply Labour & Materials To Install Built-In Full-Height Wardrobe w/ Laminate & Aluminum-Frame Frosted Glass/Mirror Silding Doors As Per Design Proposed (Interior: White Polykem) 7 feet 1,890.00 MASTER TOILET Supply Labour & Materials To Install Suspended Bottom Vanity Cabinets, Full-Length Mirror & Top Cabinets w/ Light Pelmet (Excludes: Light Fittings) 4 feet 720.00 Supply Labour & Materials To Install CRESTO Solid Surface Top (for Vanity Top) (Includes: Additional Height for Back-Splash & Front-Edge Profiling) 4 feet 340.00 COMMON TOILET Supply Labour & Materials To Install Suspended Bottom Vanity Cabinets 4 feet 560.00 Supply Labour & Materials To Install CRESTO Solid Surface Top (for Vanity Top) (Includes: Additional Height for Back-Splash & Front-Edge Profiling) 4 feet 340.00 LAMINATE FLOORING Supply Labour & Materials To Install BERRY Laminate Flooring At Master Bedroom As Per Design Proposed (Includes: Skirting) 91 sqft 720.00 Construct Raised 6 inch Platform w/ Timber Structure At Master Bedroom (Subject to Min. 100 sq feet) 91 sqft 720.00 GLASS WORKS Supply Labour & Materials To Install SandBlast Tempered Glass Swing Door (10mm) At Kitchen Entrance 1 unit 850.00 Supply Labour & Materials To Install SandBlast Tempered Glass Backing At Kitchen Wall Area 1 unit 650.00 DOORS, SCREENS & WINDOWS ROOM DOORS / PD DOORS Supply Labour & Materials To Install Venner Door C/w Lock Set For 3x Bedrooms & 2x Toilet Entrance Areas 5 nos. 1,500.00 SHOWER SCREENS Supply Labour & Materials To Install Frameless Tempered Glass Sliding Shower Screen (Includes: Tower/Hand-Rail) At Common Toilet Area 1 unit 850.00 Supply Labour & Materials To Install Frameless Tempered Glass Shower Screen (Includes: Tower/Hand-Rail) At Master Toilet Area 1 unit 580.00 WINDOWS / GRILLS Supply Labour & Materials To Install Aluminium Sliding Windows Grills (Powder-Coated) **** Room, 3x Bedrooms, Kitchen Yard Window & Grills 4 areas 2,500.00 PLUMBING WORKS Labour to Install Shower Mixer & Shower Set 2 nos. 140.00 Labour to Install Toilet Wash Basin & Mixer 2 nos. 240.00 Labour to Install Bathroom Accessories (5 pcs) 2 nos. 160.00 Labour to Install Central Water Heater 1 nos. 150.00 Labour to Install Kitchen Sink & Mixer 1 nos. 120.00 PAINTING WORKS Painting Works for Whole House 1 area 1,200.00 > FULL RANGE of Paints from DULUX/NIPPON > Note: Painting Works is Subject to Max. of 2-3 Coats. Any additional coat(s) OR surface preparation required due to condition of wall(s) will be charged based on On-Site Assessment. OTHER WORKS Supply & Laying of Floor Protection w/ Corrugated Paper (Single Layer) 1 area 300.00 Washing of Whole House (General Cleaning) 1 area 250.00 Haulage of New & Raw Materials 1 area 300.00 Clearing of Debris 1 area 300.00 Any renotalk member care to comment ?
  2. Dear Sir, I am about to renovate my 4 room in ponggol .I wanted a comfortable place. I am quite comfortable with ID designer. Now my ID have give me a quote. But I am not sure it is too expensive. Based On WET WORKS LIVING / DINING ROOM Supply Labour & Materials To Lay 600mm x 600mm Homogeneous Floor Tiles 436 sqft 3,270.00 > Selection of Tiles: Up to $3.50 psf > Includes: Skirting using Cut Tiles 3x BEDROOMS Supply Labour & Materials To Lay 800mm x 800mm Homogeneous Floor Tiles 524 sqft 3,930.00 > Selection of Tiles: Up to $3.50 psf > Includes: Skirting using Cut Tiles KITCHEN / YARD Construct Tiled Cement Base (Sides Only) for Kitchen Cabinets 1 unit 180.00 Construct Tiled Cement Base for Refrigerator 1 unit 100.00 Construct Tiled Cement Base for Washing Machine 1 unit 100.00 COMMON TOILET Supply Labour & Materials To Over-Lay Homogeneous Wall Tiles 1 area 850.00 > Selection of Tiles: Up to $2.50 psf > Excludes: Border/Special Tiles Construct Tiled Cement Shower Kerb 1 area 150.00 MASTER TOILET Supply Labour & Materials To Over-Lay Homogeneous Wall Tiles 1 area 850.00 > Selection of Tiles: Up to $2.50 psf > Excludes: Border/Special Tiles Construct Tiled Cement Shower Kerb 1 area 150.00 CEILING WORKS Construct False Ceiling/Light Boxes/ Light Holders **** Room, Dinning Room & Passage Way Area 3 areas 1,200.00 Construct False Ceiling/Light Boxes/ Light Holders At Master Bedroom Area 1 area 950.00 Construct Curtain Pelmet **** Room (Window Areas) 1 unit 150.00 Construct Curtain Pelmet At Master Bedroom (Window Areas) 1 unit 150.00 CARPENTRY WORKS NOTE: Unless otherwise stated, all Carpentry Works quoted herein are constructed using Solid Plywood w/ Laminate/Veneer Finishes only. Where design/specifications include materials other than Solid Plywood w/ Laminate/Veneer Finishes, relevant charges will apply subject to further quotation(s) & confirmation. BOMB SHELTHER (STORE ROOM) Supply Labour & Materials To Install Designed Feature Door c/w Tea Mirror Finishing As Per Design Proposed 8 feet 2,360.00 LIVING ROOM Supply Labour & Materials To Install Designed Feature Wall c/w Laminate & Tea Mirror Finishing As Per Design Proposed 9 feet 2,250.00 Supply Labour & Materials To Install Designed TV Console c/w Laminate & Tea Mirror Clad With Drawers As Per Design Proposed 8 feet 960.00 KITCHEN Supply Labour & Materials To Install Built-In Kitchen Cabinets - High-Quality Laminate Doors w/ ABS Trimmings (Internal: Colour Polykern) 39 ft run 4,290.00 > Includes: Choice from FULL RANGE of LAMITAK 2008/09 Laminates (Latest) (Excludes: Metallic Laminates) > Includes: Selected Designer Handles/Knobs > Includes: 1 Pc Aluminium-Framed Frosted Glass Door > Includes: 1 Set Drip-Dry Dish Rack Supply Labour & Materials To Install Built-In Tall Unit Kitchen Cabinet - High-Quality Laminate Doors w/ ABS Trimmings (Internal: Colour Polykern) 2 feet 540.00 Supply Labour & Materials To Install Granite Surface Top 17 ft run 1,870.00 > Includes: Standard Back-Splash & Front-Edge Profiling Add-On: Undermounting of Kitchen Sink 1 unit 80.00 MASTER BEDROOM Supply Labour & Materials To Install Built-In Full-Height Wardrobe w/ Laminate & Aluminum-Frame Frosted Glass/Mirror Silding Doors As Per Design Proposed (Interior: White Polykem) 12 feet 3,240.00 Supply Labour & Materials To Install Designed TV Console c/w Laminate & Tea Mirror Clad With Drawers As Per Design Proposed 5 feet 600.00 Supply Labour & Materials To Install Designed Full-Height Feature Wall Cum Bed-Head c/w Imported Fabric Or PVC Cushion Finishing As Per Design Proposed 9 feet 2,655.00 Supply Labour & Materials To Install Bedside Table 2 units 500.00 BEDROOM 2 Supply Labour & Materials To Install Built-In Full-Height Wardrobe w/ Laminate & Aluminum-Frame Frosted Glass/Mirror Silding Doors As Per Design Proposed (Interior: White Polykem) 7 feet 1,890.00 BEDROOM 3 Supply Labour & Materials To Install Built-In Full-Height Wardrobe w/ Laminate & Aluminum-Frame Frosted Glass/Mirror Silding Doors As Per Design Proposed (Interior: White Polykem) 7 feet 1,890.00 MASTER TOILET Supply Labour & Materials To Install Suspended Bottom Vanity Cabinets, Full-Length Mirror & Top Cabinets w/ Light Pelmet (Excludes: Light Fittings) 4 feet 720.00 Supply Labour & Materials To Install CRESTO Solid Surface Top (for Vanity Top) (Includes: Additional Height for Back-Splash & Front-Edge Profiling) 4 feet 340.00 COMMON TOILET Supply Labour & Materials To Install Suspended Bottom Vanity Cabinets 4 feet 560.00 Supply Labour & Materials To Install CRESTO Solid Surface Top (for Vanity Top) (Includes: Additional Height for Back-Splash & Front-Edge Profiling) 4 feet 340.00 LAMINATE FLOORING Supply Labour & Materials To Install BERRY Laminate Flooring At Master Bedroom As Per Design Proposed (Includes: Skirting) 91 sqft 720.00 Construct Raised 6 inch Platform w/ Timber Structure At Master Bedroom (Subject to Min. 100 sq feet) 91 sqft 720.00 GLASS WORKS Supply Labour & Materials To Install SandBlast Tempered Glass Swing Door (10mm) At Kitchen Entrance 1 unit 850.00 Supply Labour & Materials To Install SandBlast Tempered Glass Backing At Kitchen Wall Area 1 unit 650.00 DOORS, SCREENS & WINDOWS ROOM DOORS / PD DOORS Supply Labour & Materials To Install Venner Door C/w Lock Set For 3x Bedrooms & 2x Toilet Entrance Areas 5 nos. 1,500.00 SHOWER SCREENS Supply Labour & Materials To Install Frameless Tempered Glass Sliding Shower Screen (Includes: Tower/Hand-Rail) At Common Toilet Area 1 unit 850.00 Supply Labour & Materials To Install Frameless Tempered Glass Shower Screen (Includes: Tower/Hand-Rail) At Master Toilet Area 1 unit 580.00 WINDOWS / GRILLS Supply Labour & Materials To Install Aluminium Sliding Windows Grills (Powder-Coated) **** Room, 3x Bedrooms, Kitchen Yard Window & Grills 4 areas 2,500.00 PLUMBING WORKS Labour to Install Shower Mixer & Shower Set 2 nos. 140.00 Labour to Install Toilet Wash Basin & Mixer 2 nos. 240.00 Labour to Install Bathroom Accessories (5 pcs) 2 nos. 160.00 Labour to Install Central Water Heater 1 nos. 150.00 Labour to Install Kitchen Sink & Mixer 1 nos. 120.00 PAINTING WORKS Painting Works for Whole House 1 area 1,200.00 > FULL RANGE of Paints from DULUX/NIPPON > Note: Painting Works is Subject to Max. of 2-3 Coats. Any additional coat(s) OR surface preparation required due to condition of wall(s) will be charged based on On-Site Assessment. OTHER WORKS Supply & Laying of Floor Protection w/ Corrugated Paper (Single Layer) 1 area 300.00 Washing of Whole House (General Cleaning) 1 area 250.00 Haulage of New & Raw Materials 1 area 300.00 Clearing of Debris 1 area 300.00 Thank you fellow renotalk member . Care to comment

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.