Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Soon Hui

Members
  • Joined

  • Last visited

  1. Hi, I'm looking for IDs, my condo size is 1012sqft, 3 bedrooms, budget is around 15k. Please see my requirements below. Kindly send your recent reno photo (looking for platform bed and living room) to zzoom18@yahoo.com, and include the quotation too. Thanks. My Requirements Plaster Ceiling Works 1. Construct false ceiling and light holders @ Foyer Area, Living Hall, Dining Hall, 3x bedrooms. 2. Construct light holders @ Kitchen, bedroom passage, 2x bathrooms. Carpentry Works 1. Design and fabricate TV console using solid plywood in selected high pressure laminate finish @ Living room & Master bedroom. 2. Design and fabricate "King Size "headboard feature @ Master bedroom. 3. Design and fabricate bed platform with drawers/storage using solid plywood in selected high pressure laminate finish @ Master bedroom and 2nd bedroom. 5. Design and fabricate ceiling height shoes cabinet using solid plywood in selected high pressure laminate finish. 6. Design and fabricate cabinet using solid plywood in selected high pressure laminate finish @ utility area, above washing machine. 7. All cabinets, door, drawers with ABS trimming and equip with soft closing for swing door and drawer. Hacking Assignment 1. Remove existing wall / floor tiles & fixtures/ fittings and make good of hacked wall @ Utility area. 2. Lay wall, floor tiles, new waterproofing @ Utility area. 3. Remove existing floor tiles & fixtures/ fittings @ Master bathroom, common bathroom and balcony. 4. Dismantle existing toilet bowl and toilet accessories at utility area. 5. Lay floor tiles, new waterproofing @ Master bathroom, common bathroom and balcony. Windows and doors works 1. Fabricate and install entire whole house window grills. 2. Fabricate and install door @ Utility area. 3. Supply and install grille in whole unit include of service yard. Electrical Works 1. Installation of Ceiling fans & lights fitting to all bedrooms/balcony and ventilation fan to 2x bathrooms & utility room. 2. Installation of lights under the platform @ Master bedroom and 2nd bedroom.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.