Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

PeterSeet

Members
  • Content Count

    4
  • Joined

  • Last visited

Community Reputation

0 Neutral

About PeterSeet

  • Rank
    Newbie

Previous Fields

  • Renovator Engaged
    Home success pte ltd
  • Gender
    Male
  1. Time passes very fast. Almost 2.5 mth staying in my new home. Everyday, i go back to my new home which was done by Home Success, i feel very disappointed and stressful. When i saw the surrounding, toilets, living room, kitchen, walls and many many other things. CRACK LINES here and there, super poor workmanship, thinking of their stupid excuses that they gived, makes me feel like i and my sister are really so stupid to let them do the job. And again, THINK as many time before getting them.
  2. There are many hair line cracks in my newly renovated hse (haven't stay in yet). Can someone advance me what to do cos the ID said he expected this thing to happen after we build up a new store room. He said that they used the cemical cement and the crack will comes out more faster than using normal cement. and the wall need to settle down for abt 6 mths to let all the cracks comes out then he will come back to do the touch-up work. Is it truth that what he said? Is that the way ID or contractors practice normaly?
  3. Always the quot fr different company to compair. some ID are frendly at the begining but turn out to be very annoying in the end. All depends on your luck. Good company,bad ID. My sister got Homesuccess to do the reno for my 4rm resale hdb in hougang. Came out to be a pcs of ****. Kitchen cabinet is not the one we saw in the 3D drawing.(ID: Edmund Fong/ Joe) Owner's brother got to do the touch up work by himself. Will never trust this company and ID anymore. Full of excuses and late hand over. 2mth already yet havn't hand over. (too many touch up work) Good luck to those who have chooses them to turn your home sweet home to home **** home.
  4. Hi Abeali, my suggesstion to you is not to engage them as i just got this super bad service and poor workmanship and many other disapointment from their ID (EDMUND FONG and JOE). Reno starts on 18/02/2013 till now. Estimanted hand over is on 6/4/2013. still not yet hand over. Kitchen cabinet fr 3D drawing is different fr the actual one. they will ask you to pay for this , for that due to using of better material, final cleaning and chemical cleaning do at the same time while all the touch up work is not done. ID do things don't go according to schedule. full of stupid excuses when things are not done properly. I would them rate 1 out of 10 for everything.
×