Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Pokz1981

Members
  • Content Count

    183
  • Joined

  • Last visited

Everything posted by Pokz1981

  1. Hi, I have PMed both of you. Thx
  2. Hi, I nv tried those DIY before. But the one I am using now is good. My friends do not even notice at all that there is a netting at all.
  3. Hi all, never knew there were so many qns as i have not come in for a long long time unless i received PMs... Hi Tessina, clean and nice only when taking pics… thereafter maintenance is impt but is done by the maid cos too big. the magic seal is good it does trap dusts from outside… good in a way but end day it serves its purpose of preventing unwanted flying insects from coming in. it is easily removable for cleaning our can just wipe it with wet cloth. hi songz, think someone has replied on this but you can always check with ASL especially if they are doing the IT fair now at MBS (i not sure whether they have booth there) but if they have, sure will have promotions. Hi, my ID contact is the same as Vanessa. Velle & Jay - butterpaperstudio.blogspot.com.sg PMed. Thanks PMed. Thanks hi celeste11, PMed you. Thanks
  4. Hi Harriete, all from TB. And yes after purchase, must go buy LED bulbs in sg and change.
  5. Ok folks, i have come to the end of my reno journey. Never take much pic myself as there are sill many packings and unpackings to do. ID came and took some pics yesterday and i share just post it here. Resolution not that high as it is just directly from their blog. Perhaps they would have send me a final master update on all the pic they have taken then i will update again. Disclaimer: not as tidy as it seems, things were shifted around
  6. yes totally, too much stuffs and waiting for ikea furnitures delivery on Friday before all can be unpacked. Otherwise, eveything is great in terms of the space
  7. Hi Fraudster, i have pmed you. Thanks
  8. I already stayed for a week. Just that some furnitures are bought over the weekend. Should be coming in this week then all done
  9. Most have been done after shift in on monday. Super busy till wed and house is still slightly messy with carton boxes yet to be cleared after shift in. Even after shift-in, works are still carried out here and there including painting, drilling and installation of viewqwest, fixing up speakers, relocation services by singtel, installation of magic seal and also installation of curtain. The gas hob cooker ignition was not functioning and this was rectified on monday. Installation of staircase handles were done on tuesday but the installer drop his hammer and created slight dents on the flooring and hence revarnishing is needed. Sizing for my balcony washer carpentry was not right, the sliding door cant close after washing machine is put in place. Big headace, repair work is needed and this was fix today. TV console panels were also done today. As i require another mio tv setup box for masterbr. I thought that having a tel point would be sufficient. However, it was not. The way that the tel point is laid is important. Separate lines have to be laid to the termination point rather than connecting one single line to all points. This would have no issues with making calls but for mio tv installation. It is a problem. Hence, a 2nd line was laid to the TV area on wed as well. OPSH came to install today while the carpenter came to fix up the balcony sliding door. Haven really seen the final result. But all should be fine now.
  10. Hi celZtang, I have pmed you. Thanks
  11. Welcome Eminlove, at least your kitchen is nicer than my previous kitchen condition... All the best!
  12. Tomorrow is wkend, there are still some stuffs which are not up yet. Perhaps mirror and paining of main door frame would be done tomorrow. Plus the delivery of my bedframe. Lightings for dining and master should have been installed as well. Small scare though as the bulb used fused with a small small explosion. Lukily it is not the feature lights, quite shocked initially thinking that perhaps the goods are inferior but thereafter when i brought the light adaptar to a light shop, it mention that one of the metal piece was not in place and perhaps was the reason that trigger it. After the incident, i decided to change all the bulbs provided with LED lights purchase in singapore. Another reason for the change was that the bulbs provided were not energy saving and thus it feels really warm underneath it and touching the exterior surface. It has been a busy day for me, making sure installation are all in place, waited for my delivery from Originals furniture, which they delivered the ethnicrafts furniture late (something which i could have gone direct for purchase at a cheaper price). Worst thing is that the they scheduled for delivery at 1030-1230, no one came at 1238 after i have spent 2 hours around the house roaming up and down. I gave them a call and they say someone will revert back. In the end, someone did call back and says they were in town and is coming over now. In the end, they reach at 2pm . I have no strength to complain since lunch was missed. Eubiq installation was carried out in the afternoon too. I was not there to check the installation and hence no pics to show. The black bi-fold door which can be open at the rightmost side or just simply open fully Stairs with the lights on. Perhaps it would look better at night. Kinda plain over the walls but i have ordered 4 rolls of wall paper from TB to wrap the dining wall area to staircase to the living area of TV console place. Finally the first part of my furnitures delivery - My 2 shoerack TV console for master br The 2m side cupboard which is nicely slotted beside the TV feature wall. Hopefully the wallpaper will provide a good contrast against the woody grains
  13. Master bath Staircase from different angles Kitchen view from dining TV feature wall with small LED downlights View from living area
  14. Met my ID at the house while I collected the my taobao lightings delivery. Below are the pics taken for the update prior to the start of the morning work. Photos taken by ID. Carpentry for balcony done up The tall ball wooden laminate for upper door has been changed to match but the top top lining is still yet to be done. Tiling is done for the backsplash too.The bi-fold door from living to balcony can also be spotted at the bottom right pic All the backsplash are done in the kitchen but yet to be cleaned up yet. The black bifold door sits perfectly to the side. If aircon is needed in living room, all will be closed. Dish rack is not up yet for the island Another view of kitchen below plus a view from living area of the ceiling. 2 Speakers are up for the back while the rest will be connected on tuesday to the amplifier in the front after shift-in. The centre pillar in the island will have the final carpentry to house 3 sliding glass panel. So with some adjustments the whole kitchen can be enclosed if needed during heavy cooking or if the air-con in living room is being turned on.
  15. Yeah, it really is. Surpisingly Thanks Eminlove, i do not think it will rust as aircon ducting also uses copper tubing. I too started everything from scratch with no prior experience. But if you read more here and went around asking during shopping. You will learn alot. Thanks alfredt, will be posting more pics slightly later.
  16. Lastly, some other pictures on the rest of the updated works. installation of doors done for the common rooms. The "free" cabinet at the balcony area. The area was meant to put my water feature and i was suprised that it was not fixed. ID mention that they let it to be free in case i wanted to put other stuffs in the future at the place or even upsize my water feature. After looking at it, i told the carpenter to add 4 wheels to it since it was meant to be "free" Final product is still not known yet. The little fiery fire... I had to admit that i bought it for asthetic purpose initially since it is only 13inch. How much can i expect from this fella which sits quietly in the corner waiting to pounce. It suits me perfectly for the fact that i wanted some breeze in my dining area but i do not want a ceiling fan sitting on top, i wanted dining lights from the reno blogs that i seen all these while. Hence, this was a late late purchase (introduce by my ID when she saw it in some mood boards, and i managed to trace the location of it in SG). When the power was on, medium speed is all it takes for me to feel the breeze in my dining area. I am amazed and thankful that i went ahead with the decision to pruchase it without my wife's permission initially (and of course... i pay ).
  17. Last weekday before i shift in on monday. Work is progressing at a furious pace... almost all workers call in to make sure i can shift in. Deadline is tight, installation for eubiq is tomorrow, delivery of furnitures from originals is tomorrow and also collection of TB purchase which i can install prior to shifting and will not cause much disruption. Glassworks has been done up for my staircase, laquering done to the sides, lights installed but not yet activated. Mirror box has been cut and adjusted but installation of mirror not done yet. bathroom accessories has been drilled in and backsplash tiling is on the way. Sliding panel between living and balcony is done but yet to see the final product. Installation of doors to storeroom, kitchen bathroom and upper level room are done. Frosted glass door installed for upper bathrooms. Granite and quartz countertop are all done. Master bath vanity cabinet is done, pending the installation of mirror then all is complete. bathroom accessories are also installed today Common bathroom also done up except the installation of mirror Kitchen bathroom with accessories installed Finally the installation of my mirror on the kitchen bathroom. vintage retro theme perhaps
  18. Hi Redder, here you go. http://item.taobao.com/item.htm?id=23487952541
×