Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

warrensrv

Members
  • Content Count

    36
  • Joined

  • Last visited

Everything posted by warrensrv

  1. Day 7: (Master Bedroom) - Plastering (Master Toilet) - Plastering and finishing touches on tiling (Kitchen) - Plastering (Kitchen Toilet) - Plastering and finishing touches on tiling
  2. warrensrv

    Photo 13 11 13 18 11 45

    From the album: Untitled Album

    My Kitchen
  3. warrensrv

    Photo 13 11 13 18 11 39

    From the album: Untitled Album

    My Kitchen
  4. warrensrv

    Photo 13 11 13 18 11 35

    From the album: Untitled Album

    My Kitchen
  5. warrensrv

    Photo 13 11 13 18 11 43

    From the album: Untitled Album

    My Master Bedroom - Plaster
  6. warrensrv

    Photo 13 11 13 18 11 41

    From the album: Untitled Album

    My Master Bedroom - Plaster
  7. warrensrv

    Photo 13 11 13 18 11 37

    From the album: Untitled Album

    My Master Bedroom Toilet - Plaster
  8. I didn't managed to take any photos on Day 3 to 5, but they did the screeding, bricking of the Master Toilet wall and trunking for the Air-conditioner. Day 6: (Master Bedroom) - plastered the walls (Master Toilet) - tiling (Kitchen Toilet) - tiling
  9. So far, the demo has been quite smooth. I was quite impressed by the speed it was carried out. Day 1: (Master Bedroom) - demoed the toilet (Kitchen) - demoed the kitchen cabinet (Kitchen Toilet) - demoed Day 2: (Master Bedroom) - demoed the wall to shift the door entrance (Kitchen Toilet) - demoed
  10. Thank you all for the warm welcome. Its been a busy week, but here are some updates. I had been looking for a contractor for a while and was lucky to have found an experienced designer/renovator who could help me transform this home to something special. Current condition: (Living room) (Master Bedroom) - The furniture were removed soon after (Common Room) (Kitchen)
  11. Hi everyone, I have been following Renotalk for some time and now being eligible to purchase a flat of my own, the time has come for me to make some contributions. After viewing more than 10 units, I finally found the place I would call home at Yishun. Although the COV was quite high for a 3 roomer, the location is excellent and the layout, clean and simple. My floor plan: Being a simple guy, here begins my simple Renovation Journey. More to come...
×