  1. yeah, and thank God for that...this is the area tat i was most worried but after seeing the workmanship, i can
  2. Hi rainbow04, reno itself is almost 31K, wiring is 2K+...din really do much hacking leh, only knocked down a bit of walls in MBR + MBR toilet floor and wall tiles..
  3. TV feature wall + partition @ foyer
  4. Unfinished cabinets and my Franke sink at kitchen... Boxup at laundry area
  5. This would be my MBR bathroom cabinet + basin...
  6. My reno is about to complete..it should be end of this week..yippee!! Cabinets are all up... WIW....really like the cosy feeling, ample space along the aisle too... now left the drawers, full height mirror and black tinted sliding glass door to be installed...can't wait to see the final result..
  7. quite a number of jobs has been done as of yesterday...aircon trunking, floor laminate & mosaic tile for MBR bathroom..hmm..progress looks good Mosaic tiles at both sides of the toilet walls...tiles selected by my dear wifey.. Closer look on the mosaic tiles SUPREME floor laminate laid...for living, dining & the small extra room... Foyer area untouched...this area will overlay with pebbles see those paints on the floor?? most of the paints my wifey and I chose are from ICI..tat NIPPON paint is for the kitchen walls...
  8. the aircon workers at my place now...it is not easy to make decision of the fancoils position and how to run the trunking !! ...stress buildup when he told me some of the wiring covers must be removed to make space for the trunkings ALAMAK!!!but thank goodness my ID taught them to place the wires into their trunking cover... worst is their office issue them invoice with wrong configuration, now lagi stresss and sianzz...i rang up the shop supervisor and he verified that they made a mistake.. !! going down again after work to check on the progress...hopefully, i don turn into Bao Gong again...
  9. Progress in my MBR...so far so good... False ceiling up Box-up to eliminate gap after placement of bed frame This is a last minute request...made a hole for future use, to place DVD player & SCV box.. Access door from MBR to study cum WIW...thinking of mounting string curtain here False ceiling for WIW area Today suppose to place the aircon trunking but the company called this morning to postpone to tomorrow now the subsequent works, painting + flooring will be delayed ...arrghhh
  10. two weeks have passed since my house reno started...wow!time really fly time to update my progress before my thread accummulate dust.. MBR bathroom floor and wall tiles laid...work still not complete, waiting for the mosaic tiles to be up The extra room walls all up and plastered Light box done at dining hall...all walls plastered False ceiling is up **** hall..all walls plastered
  11. Phew~~thank God tat the hacking of the walls for my MBR and 1st common has been approved...wat a relief... according to my ID, there will be quite a number of works to be done today..knocking of walls + wet works + false ceiling..thumbs up for my ID for the good coordination works done as of yesterday.. build-up of extra guest room 70% complete...room size looks quite alright wiring for ceiling laid.. kitchen walls plastered, 50% done..
  12. Kitchen cabinets all gone All lightboxes and cornices torn down Cement and water proofing material + hollow block to build the extra room Tiles for MBR Bathroom
  13. Today is the 4th day of reno liao...most of the tearing and hacking had been done except still waiting for the approval of hacking the wall between MBR and 1st Common room...it had been approved on last sat but my ID juz told us that HDB haf juz revoked it, don't know wat is the issue leh this time gotta pray extra hard Some pic to share on the progress everthing gone liao for my MBR bathroom door frames for MBR and 1st Common rm hacked off Living and dining floor skirting torn away
  14. wah the bedrooms' flooring is laminate or timber strips? look very nice leh...will u be retaining them? the whole house in general also looks quite well maintained by the previous owner hoh... It's timber strips and I will be retaining them, previous owner had all the 3 bedrooms flooring done with this totally agree with you that the house was properly kept...
  15. Reno had official started on 8-Aug some additonal pix to share before the transformation MBR Bathroom MBR Wardrobe Existing entrance to MBR and 2nd Common Room 1st Common Room 2nd Common Room Storeroom Kitchen and Laundry area Common Bathroom Tomorrow will start posting the reno progress
×