Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

cooknchill

Members
  • Content Count

    36
  • Joined

  • Last visited

Everything posted by cooknchill

  1. Corridor leading to master bedroom MBR's toilet Master bedroom with walk-in wardrobe and study Missing photos of the study and common toilet which have yet to be sent to us by our ID.
  2. Quick update! Our renovation was completed in April and we moved in in the first week of May. Here are some shots off the photographer's screen when our ID came to take photos for their portfolio few weeks back. Quite happy with how it turned out. Living room View of kitchen from living room
  3. cooknchill

    image

    From the album: Cooknchill

  4. cooknchill

    image

    From the album: Cooknchill

  5. cooknchill

    image

    From the album: Cooknchill

  6. cooknchill

    image

    From the album: Cooknchill

  7. cooknchill

    image

    From the album: Cooknchill

  8. cooknchill

    image

    From the album: Cooknchill

  9. cooknchill

    image

    From the album: Cooknchill

  10. cooknchill

    image

    From the album: Cooknchill

  11. Your cabinetry and color scheme are very similar to our first 3d drawing. The grooves could be some trend that 3d design wants to start haha.
  12. Latest update: Our hacking is completed! Wet works has started, but it would only be completed after CNY. Preview of kitchen tiles Vinyl flooring for the entire house (left-most) - was contemplating between the left and centre one, decided to go with the leftmost one in the end for a more rustic look. Just decided to overlay the floor tiles in the MBR toilet as well to match the wall tiles and the look I want to achieve better. The blue tile is the wall tile we have selected, and we are contemplating among the white tile options next to and below it for the floor.
  13. cooknchill

    MBR Toilet

    From the album: Cooknchill

  14. cooknchill

    MBR Wall

    From the album: Cooknchill

  15. cooknchill

    Vinyl

    From the album: Cooknchill

  16. cooknchill

    Master Toilet Tiles

    From the album: Cooknchill

  17. cooknchill

    Decor Wall

    From the album: Cooknchill

  18. cooknchill

    Kitchen Tiles

    From the album: Cooknchill

  19. Can I check with the home owners here, how long does it usually take for your ID to provide you with 3D drawings? Ours is taking quite some time and the first round of 3D drawings are frankly really horrible as their in-house 3D person has quit.
  20. It looks like there is no entrance, but that's cos we are making a platform where bedroom 2 used to be, so the solid lines are not walls, but the platform area... So, basically it's open door to the expanded MBR, go straight to WIW (which will swing doors at the entrance), step up to bed, step down to study.
  21. Thank kevynq, we will take note. Here's our revised floor plan. We will be extending the kitchen outwards to have somewhat of a semi-open kitchen with bi-fold windows. Also, we will be combining the master bedroom with the adjacent bedroom to form a larger room to house a walk-in wardrobe and a small study.
  22. cooknchill

    New Layout

    From the album: Cooknchill

×