Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

RockHeart

Members
  • Content Count

    2
  • Joined

  • Last visited

Community Reputation

0 Neutral

About RockHeart

  • Rank
    Newbie

Previous Fields

  • Gender
    Male
  1. I will renovation my new HDB BTO 4 room soon and got a planning package from ID, I have no experience about it. any bro or Sis can advice on this package for total S$10588.00, anyway, can I ask more than 1 ID to measure the size and design for me ? If finally I only choice 1 ID, do I need to pay to another ID any fee for measure size and design if this ID is not in my name list? Thanks advance. A) Professional Services 1. Space Planning & Furniture Layout 2. Design & Soft Furnishing Consultation 3. Materials & Colour Proposal 4. 3D Computerized Perspective Drawings 5. Project Co-ordination & Site Supervision 6. Warranty with Guaranteed after Sales Service 7. All Necessary Authority Permit Application B) Masonry Works 8. Supply and Construct 50mm Height Mortar Base and Kerb:- ~ Kitchen Cabinet Base. ~ Fridge Base. ~ Washing Machine Base. C) Ceiling Works 9. Supply and Install L-Box Light Holder ****/Dining area. 10. Supply and Install False Ceiling at Main Entrance and Passage Way Leading to Bedrooms D) Plumbing Works 11. Alteration/Extension of Stainless Steel Water Inlet Piping for Kitchen Sink Position (if applicable) 12. Alteration/Extension of Stainless Steel Water Inlet Piping for Washing Machine Position (if applicable) 13. Provide Labour Installation for Mirror & Bathroom Accessories Set at 02 Bathrooms. 14. Provide Labour Installation for Storage Water Heater 15. Provide Labour Installation for Kitchen Sink and Tap 16. Laying of Conceal PVC Drainage Pipe for Kitchen Sink. (if applicable) 17. Laying of Conceal PVC Drainage Pipe for Washing Machine. (if applicable) E) Miscellaneous/General Works 18. Supply and Paint Whole Unit's Walls and Ceiling using NIPPON Emulsion Paint. (Choice of Colours) 19. Supply and Paint Whole Unit's Ceiling using Nippon Matex Paint. 20. Provide Protection Sheet for Whole Unit Flooring during Renovation Period. 21. Provide Chemical Washing for All Newly Laid Floor Tiles for Whole Unit includes General Cleaning. F) Carpentry Works 22. Design & Fabricate 20ft Solid Plywood Kitchen Cabinet with High Pressure Laminate finish & ABS Edging Doors & Drawers c/w : ~ Supply & Install 10ft Solid Surface Work Top with Front Profile & Back Splash ~ Supply & Install 2 Tier Stainless Steel Dish Rack ~ Supply & Install 1 no Aluminium Frame Frosted Glass Panel ~ Supply & Install 2 set of hydraulic system ~ Supply & Install Designer Handles ~ Supply & Install Soft Closing Hinges for All Doors ~ Supply & Install 03 sets of Soft Closing runner for drawers ~ Supply & Install PVC cutlery Tray ~ Provide Labour Installation for Hood and Hob 23. Design & Fabricate 6ft Full Height Built-In Solid Plywood Casement Wardrobe with High Pressure Laminate finish & ABS edging Doors c/w : ~ Supply & Install Hanging Rods ~ Supply & Install Internal Drawers & Shelving ~ Supply & Install Designer Handles ~ Supply & Install Soft Closing Hinges for All Doors 24. Design & Fabricate 6ft Full Height Built-In T.V Feature Wall & Suspended T.V Console with High Pressure Laminate finish & ABS edging Doors c/w : ~ Supply & Install 1 no Tinted Glass Panel ~ Supply & Install Designer Handles ~ Supply & Install Soft Closing Hinges for All Doors ~ Supply & Install 02 sets of Soft Closing runner for drawers (if applicable)
×