-
Content Count
394 -
Joined
-
Last visited
-
Days Won
1
Posts posted by Freb
-
-
hi freb, had u done ur painting? does new BTO need to apply primer?
hi, painting is ongoing now, not sure if they applied primer. but u can either use primer or use more coats of paint.
-
Flooring
Basically the drop in cement screeding @ the main door is reserved for a feature floor tiles.The rest of the floor area awaiting for vinyl laying due next week.Will update the rooms and living room flooring here.
Feature floor tiling (Expensive tiles but wat to do,want nice must pay nice $$ also )
Hope you guys/gals able to see the so call geometric boxes .
woot this is cool!
how i wish i got both side windows for the kitchen, ur kitchen will be bright!
-
wow very nice house! great theme!
-
Nice transformation!
-
Congrats on getting ur house! U hack off kitchen tiles?
-
Nice design & progress!
-
bro, your taobao thing confim is 2.7m3?look like alot leh!!!btw how much is per meter cube?
Yes, 2.65m3 actually but oops.sg charge per 0.1m3 ($5)hi, may i know ur city gas is one time instllation? or they will come again to fix your stove? TIA!! btw ur home tiles got any hollow?
Gas is one time for pipe, another time for stove.
Tiles? Can't check yet since it's all covered up.
-
City gas came today to extend the gas pipe for stove, extended into service yard through HDB provided opening
from top of service yard door turn down and enter kitchen again
terminate at proposed stove location
tmr will be painting of whole house + carpentry measuring
-
ceiling gap for living room aircon installation
box up for all aircon piping in the corridor
MBR aircon pipe box up, got a pointy corner =\ ID say if wanna hide goto lower the whole beam
-
went in for some progress photo, greeted by the partition wall, this pic just show the clearance between the main door n partition wall when fully open, i hope no problem when delivering furnitures.
behind this wall will be dining area, reason built this wall is firstly for fengshui (no direct view to windows/door), 2ndly cos i bought a 2m dining table, too long cant fit anywhere, lastly to install the dining light switch on it
false ceiling up to hide all the ugly lighting points and in-ceiling speaker. did L-box instead of cove light, didn like the idea of cleaning
view from corridor
ceiling with 6" gap near the window for double curtain tracks later, i didn wanna install the curtain below existing window beam as i think it will make my unit look shorter than it already is
-
measurement done for false ceiling, materials on site. had a discussion with ID on the opening size, location, lines etc...
collected KDK fan from my friendly neighbour who bought for me from JB
opened one of the box, 2x Aames chair
Evorich guy came to do measurement for my bedrooms, he suggested to me that i should do carpentry (wardrobe) first then they can lay HERF vinyl, this prevent scratching done by carpenters and also can reduce the area needed to lay vinyl, save some $$$
however, upon checking he told me that my bedroom entrance screed is not levelled, some area 5mm, some 3mm, to my horror he told me the HERF is actually 5mm not 3mm..WTH! the sales clearly told me its 3mm & asked me to offset 5mm for adjustment... but he also said that it can be resolved with a pvc bridge over...so...i hope everything turn out nice...
so buyers of HERF beware...its 5mm thick not 3mm..and i think having offset of 7mm is a safer bet...
we chose the Amsterdam eggshell white as i think it is more close to our theme.
-
-
good progress! keep updating!
-
hi, PMed
Hi Freb,
1) I will collect my key in 2 months time. Can u share with me how to appeal to HDB for the free cement screed?
2) From your post, i understand that HDB contractor only provide up to 40mm of screed. If i using HERF flooring, do i need to ask them to top up?
3) Do i start appeal now or after collected key?
Sorry for so many questions as this is my first BTO.
Thank you in advance!
Hi Freb,
I intend to lay homogenous tiles in my livingroom and vinyl for bedrooms.
1) Does that mean that cement screeding is required only for the bedrooms?
2) Could you share with me how to appeal for foc cement screeding please..
Thanks.
-
tiling finally completed after 2 months...i chose a ramp instead of step for the entrance...for old folks
not sure its the kitchen tiles not level or my living room tiles...the gap seems uneven...goto ask tiler rectify it.
2.7m3 of taobao stuff delivered lights, sinks, taps, chairs...etc
MBR toilet tile redo completed but...
silly mistake by tiler again...the shampoo ledge is too close to the rain shower tap...i cant even install the hose or even put shampoo bottles...goto redo...again
new feature tile is definitely straighter than the old one...love it will be using white grout for the gaps
next up, carpentry works and false ceiling..cant wait!
-
Hi lovemisty & 112978az
Pmed
-
i am confused here. what is the different between cement screed and pre-pack sand?
The new HDB regulation is we need to use their pre-pack material?
can we appeal HDB to provide us with the pre-pack material foc?
or it is just for carpet/vinyl tile/linoleum/parquet/timber flooring?
Screed is basically a level finishing before u lay ur tiles/parquet/vinyl etc. it's a sand n cement mix. usually contractor mix cement & sand to a certain ratio (1:3-5, w/wo aggrevates depend on the application) concrete is the one added with bigger aggrevates (small size stones)
Prepack screed only means that sand/cement already mixed properly in the pack, contractor no longer need to mix using mixer on the spot
New requirement in place to make sure the mix is even & to requirement. Will cost higher.
If u request for HDB screed they will use prepack screed. Starting next month Reno contractor goto use prepack as well for all flooring works.
HDB only give u foc screed if u laying laminate/parquet/vinyl but not tiles
-
Good progress, can't wait!
-
All PM replied. I'm currently overseas. Will be slow in replies 😁
-
thanks Freb for your appeal letter. My screeding was approved, to start late july/aug.
Congrats! They might start doing sooner than u think 😊
-
new tiles finally arrived
tiling work finally resumed, removing old layer of feature wall at MBR toilet
choose a setting out plan so the tiles layout is more pleasing to our eyes.
-
Freb, is what you are saying really true about free scrred for laminated flooring? Can chare your appeal letter? wouldnt mind trying it out before i get my unit.
Thank you very much in advance.
PMed
i am getting my key very soon. is it better to appeal for the cement screed now or after collection of key?
msg full
-
Hi Freb,
1. May I know how did u manage to get the cement screed?
2. May I have your ID detail?
Thank you.
PMed
-
50L Joven storage heater. Requested to have another pipe to supply hot water for the kitchen.
hi, is it difficult to route the pipes if put the storage in the service yard?
Scandi X Industrial X Eclectic Mix Style
in Reno t-Blog Chat
Posted
Ur videos set as private, can't access. Can u pm me ur kitchen door quote n contact? Thx