Skip to content
View in the app

A better way to browse. Learn more.

RenoTalk.com ™

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

limpbiskut

Members
  • Joined

  • Last visited

Everything posted by limpbiskut

  1. 5 April - Carpentry 85% completed! Rinnai chimney hood, hob, built-in oven and kitchen sink from Summer Hardware Trading. Our reno package includes Rinnai conventional hood, hob and the sink so we topped up to get a bigger sink (with free chopping board and drainer) and the chimney hood. Blum system for the dishrack only and managed to squeeze 2 pantry drawers since there was not enough space for the whole rack from top to bottom. This should be enough. My mom has the pantry system and we find that after 10 years, it can't be closed properly. The kitchen subway tiles is loveeee. Yet to install the black galaxy granite top and tempered backing glass on the other side. Wardrobes with pull-out mirrors. Wifey so happy to get her dressing table. Mirror with cabinet for master toilet bought at Adecco Living @ Sutera Mall, JB and mirror for common toilet from IKEA. SAVE COST The vanity cabinet for master toilet not done yet.
  2. Rushed to our place last Saturday to have a look at the reno progress. The carpentry has started and we can now see the laminates we've selected. Actually the missus wanted to change the master bedroom laminates but sadly it was already ordered. So gotta live with it! But it turned out well; a darker tone for our room. We decided to have the same type of laminates for both rooms but in different shades. Shoe cabinet and kitchen laminates have to be the same so it's uniformed and not too messy with different textures and looks near to each other. Nothing too fancy, just simple, practical and most importantly, within our budget! Both of us have agreed on not spending more on the laminates. The common bi-fold door's installed too. The top and bottom part are similar but since the top is near to the light, the colour changes.
  3. Hey, Thank you! Gotta say, i love ur blog! Hahaha Hopefully our home won't be featured.
  4. Hi can pm me the address of where u did the acrylic for both toilets. Thanks in advance.
  5. Another one from Tampoi Lighting for the warm "alley". I like how the shadows create those nice patterns on the ceiling. Can't wait to decorate the blank walls. The lovely toilets: Somehow warm white (T5 strips) seems to look nicer than daylight, don't you think? (But not for the bedrooms, you'll see why below) The LED lights in the common bedrooms come with remote control to adjust the light settings. This time round, the true colour of the walls is seen better with daylight. (if you don't already know )
  6. 27 April - Lightings installed! We got the living room + dining + walkway + service yard + kitchen lights from Tampoi Lighting and the rest from Taobao. Thank god the shipment from China arrived just in time for installation. Below you'll find the comparison between the day and warm white effect in the toilets, living room and common bedrooms. The dining area and tracklights are in warm white while the ceiling fan light is in daylight. Loving the dining pendant lights! Now here's a pic with both lights on. Mr R said it's still not bright enough. but we're so into the cozy ambiance. Simple LED light for the entrance. Tracklights for the kitchen too
  7. Hi, thanks for the compliment! The light grey is romance and the mint is cameo green. Both from dulux.
  8. Towel rack Master toilet ceiling light - the picture from the website is different to what we received but I think it's ok Master bedroom ceiling light Condiments jar - lost the link
  9. Finally our purchase from Taobao arrived last Saturday! 65daigou offered 10% off shipping fee in April so we tried buy-for-me since it was our 1st time. We are very satisfied with their service and delivery! Everything was packed nicely and no defects found. Corner racks for the toilet > Rainshower with mixer for the master toilet Bidet sprays LED ceiling lights for the common bedrooms, toilet, entrance and bomb shelter (6 in total from the same seller) The ones for the bedrooms come with remote control. Keys and letter holder Entrance door mat
  10. Hey neighbour, nice reno! Love Blum too but overbudget. Looking forward to more updates from u. Cheers~
  11. Went to check our place yesterday to see the master toilet tempered glass shower screen and frosted glass toilet door installed. The frosted glass door is more suitable to be installed in our room instead of the common toilet cos firstly, it's costly and secondly you can still see the shadow of the person in the toilet from outside. Loving it! Our storage heater 25L JOVEN was also installed. Got it from our contractor's contact since the one at Hoe Kee was out of stock. It was delivered together with our Rinnai hob + hood + oven and kitchen sink.
  12. 22 April - painting works for whole house & door frames done! Our white living room. It was supposed to be a very light grey colour but somehow the lighting made it seem white; like no difference from the previous paint. But I've no complaints! The same colour as the living room was selected for bedroom 3 but now since the area is smaller, you can see the greyness. Mint for the middle bedroom (bedroom 2) She's in love with this one. Darker brownish grey for the master bedroom for the cozy effect. As you can see, the half recess wall was also done leaving a small box above our bed. T5 light will be installed at the bottom. Black door frames.
  13. 16 April and the 1st phase - wet works is complete! Since we wanted the cement screed wall at the kitchen entrance, these tiles were chosen to match the look. I find the HDB kitchen tiles sucks! You have to clean almost everyday as small amount of dirt can be easily seen as per my friends' complaints. We could have opted out of the BTO HDB flooring but we thought we could save money initially and reduce our reno cost. The living room and bedrooms homogenous polished tiles are fine. *relieved* Luckily there were also no defects as compared to our neighbours'. Subway tiles for one side of the kitchen as there won't be any top cabinets; only our hob and chimney hood. Both toilets' ugly walls have got to go too! Our master toilet feature wall with the missus's chosen tiles. Decided to only overlay a small area to avoid it being too busy i also headache. Gonna have tempered glass shower screen for the master and just a shower curtain for the common toilet. Common toilet floor - we specifically laid out the random designs for the tiler to follow the layout but unfortunately the OCD missus can still spot a few not done accordingly. But oklah, still nice right? hehehe So we sat down and chose the laminates for our kitchen cabinet, shoe cabinet and 2 wardrobes. Next up will be the painting works and carpentry!
  14. Hello! U're from banks too? Haha we're moving in ard early June.
  15. i choose not to hack the wall coz i wanna separate the service yard cum laundry area.
  16. Our contractor provided us with 3D drawings of the designs that we had in mind before carpentry work starts next week. We intended to keep our living room simple with no feature wall and built-in TV console. This enables us to move around the furniture when we're bored with the current layout. We initially thought of having a partition between the sleeping area and the makeup/getting ready area but seems like it will only make the tiny room smaller. So since we are both on day shift, we don't really need the partition. Plus if we were to have a baby in the future, we could place our babycot and have him/her next to my wife. The space in front of the wardrobe is ideal for that kinda situation. She can also have her vanity table with allll of her makeup and additional recess wall wooden shelves for more storage. But...will my wife share the 6ft wardrobe with me? I don't think so. Lol Shoe cabinet as requested. We saw this design from pinterest and showed it to Mr R. Hhehe as simple as that.
  17. In Love With Tiles ... The 1st thing we did was to look around for the perfect tiles for our toilets and kitchen way before our keys were released. So far we went to these shops: 1. Hafary 560 Balestier Rd Singapore 329876 2. Lian Seng Hin Trading Co Pte Ltd 568 Balestier Rd, Singapore 329885 3. Taugres 7 Defu Lane 1, Singapore 539482 4. Hup Kiong 11 Defu Lane 9, Singapore 539253 5. Soon Bee Huat No.3A Toh Guan Road East Singapore 608834 It was fun for the missus who has an attention to details and is into peranakan tiles. I just had to tag along. Our contractor ordered the tiles from 3 different companies and they arrived on 6 April.
  18. Finally, we got HDB's approval for hacking works on 2nd April. It took around a week. So excited to see the wall partition between the kitchen and dining area brought down for an open concept kitchen! The service yard door was also removed. Everything was done on 6th April.
  19. Reno Timeline 27 Jan 2015 - Collected keys Few days before CNY - Meet contractor, take measurements on-site for quotation Original floor plan: Proposed design: 24 Feb - 1st quotation ready Premium Design & Build Package Design Worksa. Perspective drawing by dedicated designer teamb. Conceptualise space and furniture planningc. Detailed floor plan layout Masonry Worksa. Construct 50mm kitchen cabinet base side tile upb. Construct 50mm washing base and fridge base - goes to master toilet shower kerbc. Surface and side tile upd. New selected floor tiles using overlaying for kitchen & yard existing flooringe. New selected wall tiles for kitchen to ceiling height (one side of wall)f. Hack existing L shape kitchen wall to ceiling height cum HDB approvalg. Dismantle existing HDB aluminium bi-folding door and 2 set of window onlyh. New cement jobs for kitchen wall & beam Plumbing Worksa. Install inlet and outlet piping for washing machineb. Labour to install water heaterc. Labour to install 2 sets of toilet accessoriesd. Connection of kitchen sinke. Supply and install 01 no. of kitchen sink and tap Painting Worksa. Nippon 5000 or ICI Pentalite paintsb. Painting of all sewerage pipesc. Painting of all door, all frames and main metal gated. Up to 4 colour for internal walls and ceiling white Carpentry Worksa. 24ft laminate kitchen cabinet (Combi top and bottom) - top up additional kitchen bottom cabinet 12ftb. All internal carcass and panel doors are in solid plywoodc. ABS trimming door panelsd. Supply & install solid surface for kitchen work top (10 ft) - upgrade to granite work top 20 fte. Supply & install 01. no of cooker hood and 01 no. of hobf. 01 set of stainless steel dish rackh. 01 set of glass panel doorsi. Designer handle selection Carpentry Works for Bedrooma. Supply and install 5ft built-in wardrobe with laminate solid plywood for bedroom 3 (Sliding door)b. Supply and install 6ft built-in wardrobe with laminate solid plywood for master bedroom (sliding door)c. New box up master bedroom recess walld. New wooden shelves for master bedroom recess side wall using laminate finishe. New suspended dressing table for master bedroom using laminate finish Electrical Worksa. Labour to install ceiling lights to all HDB original light points Othersa. Professional project arrangement and coordinationb. Workmanship warranty for 1 yearc. Acid wash for whole unit floor Additional Itemsa. New shoe cabinet full for main entrance area with laminate finishb. New aluminium sliding window for sv yard cum hdb designc. New tempered shower screen for master bathroom toilet d. New wall and floor tiles using adhesive method for common and master bathroom e. Supply labour to reinstall both toilet existing accessories items f. Supply labour & material to extend copper piping for both bathroom mixer unit 17 Mar - Edit quotation and deposit upon confirmation 18 - 27 Mar - Contractor checked and rectify for defects 28 Mar 2015 - JB Tampoi Lighting: We bought 1m x 5 aluminium track + 7 LED tracklights + 3 dining pendant lights + 3 walkway pendant lights + 4ft T5 + 4 spare edison bulbs ard SGD500++ can't wait to see the lights installed! the rest of the bedroom LED lights are from Taobao. Will be uploading pics of the loot soon! 30 Mar 2015 - Aircon (Mitsubishi Eletric Starmex 9000BTUx3 CU Model: MXY3A28VA FCU Model: MSYGE10VAx3 & Service yard window installation [awaiting HDB reno approval] 31 Mar 2015 - Electrical works
  20. Contractor Or Id? Since we got the keys around end of January which is nearing CNY, we had to wait again to start renovation works on our new crib. While other homeowners started surveying IDs and contractors (some wayy before their keys were released), we could not imagine meeting all of them and comparing their quotations. YEA WE ARE LAZY LIKE THAT. Our close friends have engaged this reliable contractor (Coos Design and Innovations Pte Ltd) for their new homes. We find the workmanship and quotations pretty good so without further thoughts, we met Mr Raymond for quotations. We didn't even consider any IDs cos we feel that they are more expensive and we don't really need their new designs/ideas for our cozy haven. Just by engaging a contractor, we can easily save a few thousands yet still achieve our dream home. For concept wise, we chose Scandi with a touch of industrial. Here's our moodboard from Pinterest!
  21. The Beginning Of A New Life & New Memories The long wait is finally over! We've collected the keys to our new home on my wife's birthday eve (end January). What a great start to her turning 30! Looking forward to transform this space into our cozy haven. http://renotalk.com/forum/uploads/gallery_68172_713_19767.jpg http://renotalk.com/forum/uploads/gallery_68172_713_6107.jpg http://renotalk.com/forum/uploads/gallery_68172_713_15110.jpg
  22. HDB sales launch in November 2011 - few locations launched: Punggol Waterway Banks and Ridges, Hougang Capeview and Dewcourt, Yishun Acacia Breeze, Bukit Panjang Fajar Spring and Bedok Golden Cassia. We went through all the locations that HDB launched and decided on Punggol Waterway Banks and Ridges which is located along the iconic Punggol Waterway. Why Punggol? Honestly the missus saw the waterway scenery and she was sold. Our first application for a flat was successful (lucky us!) and so we patiently waited for 3 years.
  23. So how we got started on our journey or processes on our NN Loft? I must say that it all started out by proposing to my girlfriend / fiancee who is now my wife by asking her to apply a BTO flat. I know it sounds funny but isn't it a fact that some or even most couples before they get engaged, the guy pops the question of "Wanna apply a BTO flat together?" LOL! So that's where it all started...............Nov 2011. My wife and I logged in to the HDB website to see the sales launch in November 2011. There were a few locations or sites for us to choose. Punggol Waterway Banks and Ridges, Hougang Capeview and Dewcourt, Yishun Acacia Breeze, Bukit Panjang Fajar Spring and Bedok Golden Cassia. We went through all the locations that HDB launched and we decided on Punggol Waterway Banks and Ridges. This site will be located along the iconic Punggol Waterway. WATERWAY BANK AND RIDGES (IMAGE TAKEN FROM HDB WEBSITE) FLOOR PLAN OR RIDGES AND BANKS (IMAGE TAKEN FROM HDB WEBSITE)

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.