Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

andotang

Members
  • Content Count

    405
  • Joined

  • Last visited

  • Days Won

    12

Everything posted by andotang

  1. Lights and Heater Installed. All my lights is installed but I cannot change the color yet as I didn't bring my router to the new house yet. Still got a lightstripe not yet install in my cabinet. 2 x E27 hue pendant in the back for hue effect. This I use a 13w E27 daylight for normal usage everyday. Kitchen Light, as my kitchen is long shape so I get a long adjustable light, can put 5 x E27 bulb but I only put in 4 x 7W bulb. Bedroom platform lightstripe. Hard to replace next time so hopefully don't spoil so soon. Because this lightstripe comes with normal 3 pin plug and a controller for hue so it doesn't install like those usual one color lightstripe. E27 downlight from Philips, no need worry about replacing drivers or bits and pieces of false ceiling dropping down while you change the drivers. This light is direct connect and can say as never spoil, only the bulb will spoil which you just need to screw out and replace easily. All this convenient for just $10 exclude bulb. E27 Pendant light for dining table. Using 13W daylight bulb for everyday usage. Hopefully light will not cast shadow onto the ceiling fan. Close up view of Philips downlight on ceiling pillar carpentry. Toilet light and T5 in box up. My heater is installed and it is a perfect fit due to the slim and long design. Will post my granite top next.
  2. Yup need to cut a groove on the tile and slot in else cannot take the weight.
  3. Bombshelter Rack I choosed a slim profile metal rack instead of wood panel as I don't like the wooden smell in the bombshelter lingering all year round. Custom made to size. Kept a gap on the left side for tall item like ladder and ironing board. Right side will be used as shoe rack, custom size so it flush with entrance wall. Far view from outside. Bird eye view? Using the granite from the cut out of kitchen sink to make 2 shampoo shelf in shower area. Hopefully enough space to use for me and mrs.
  4. Costing of wall PM-ed. Metal drain cover I end up didn't use his service but if you have small custom metal work you can contact him. PM-ed too.
  5. Carpentry is up. 5 tier shelves inside the DB box. Yet to decide what to put inside here as it will be warm due to router heat. Pillar carpentry to hide wires going up for the 2 hue pendant light. On top can put things or collect dust. Table space for everyday use and pendant for daylight bulb. Vanity pending granite worktop. My biggest carpentry in the house is this shoe and storage cabinet. Laminate wasn't as nice as what I see on sample.... well...my fault. I am glad I decide to cut 2 U hollow on the side panel so view will not be block. But in the end I decided to put the shoes in the bombshelter rack and keep this cabinet as storage for other stuff. Thank you for viewing.
×