NgBT
Members-
Content Count
13 -
Joined
-
Last visited
Community Reputation
0 NeutralAbout NgBT
-
Rank
Bronze Member
Profile Information
-
Interests
Home Automation
Previous Fields
-
Gender
Male
Recent Profile Visitors
1,033 profile views
-
Engaged Jun contractors Mr. Wong to install my 3 panel yard windows after seeing his flyer in the lift. He offered standard price; no worries of being conned. I got a quote from.a contractor earlier at about 60% higher price. Fortunately, I did a rough estimate of material cost and labour. Material used were also of good quality.
-
Found this aircon installation company over the web last Oct. They were shortlisted as one of the competitively priced vendor. Engaged Mr. Ang of Harvest Aire, and requested him to include all my stated requirements about size of copper pipes, brand n size of insulations, electrical cable size in the purchase order. Unlike other vendors that I contacted, there was no demand for extra charge to meet those requirements. I postponed my installation by slightly over 1 month without being pestered too. The installation workers were both humble Malaysians--easy to communicate when routing the pipes. Mr. Ang was responsive to calls and messages when there were questions. Feeling glad that I engaged Harvest Aire, especially when my neighbor complains about water droplets found on the surface of his trunking because his contractor convinced him that there will not be any problem to use thinner insulations. He is contemplating to dismantle his false wall to change the insulations n trunking now. it is worth to be KS to use at least 1/2" Armaflex insulations if trunking is concealed.
-
We signed a BTO package in Aug 2015 with $500 deposit at 3D Toa Payoh centre. Then we delayed key collection to the new flat. Called Bryan to extend booking to Oct 2015. No problem, no question asked. By the time we decided to start renovation, it was Dec 2015. We told Bryan that we need to move into the new flat by mid Jan 2016----"Ok! Do my best." During renovation, liked our hacked wall column installed with HDB ceramic tiles instead of being plastered and painted. It was done. We changed painted colors to 2 walls. It was done. We shifted into the new flat on 16th Jan 2016. Paid up fully by end Jan. We discovered the top of kitchen cabinet was laminated white instead of wood grain. Bryan got it fixed within a week. In end Mar 16, we discovered a minor defect in the floor tile. Would any contractor entertain us way after full payment? I called Bryan. Today, it has been fixed. So very glad and satisfied ee engaged this young man.We signed a BTO package in Aug 2015 with $500.deposit at 3D Toa Payoh centre. Then we delayed key collection to the new flat. Called Brtan to extend booking to Oct 2015. No problem, no quedtion asked. By the time we decided to start renovation, it was Dec 2015. We told Bryan that we need to move into the new flat by mid Jan 2016----"Ok! Do my best." During renovation, liked our hacked wall column installed with HDB ceramic tiles instead of being plastered and painted. It was done. We changed painted colors to 2 walls. It was done. We shifted into the new flat on 16th Jan 16. Fully paid up by end Jan. We discovered the top of kitchen cabinet was laminated white instead of wood grain. Brtan got it fixed within a week. In end Mar 16, discovered a minor defect in the floor tile. Would any contractor entertain us way after full payment? I called Bryan. Today, it has been fixed. So very glad and satisfied ee engaged this young man.
-
We signed a BTO package in Aug 2015 with $500 deposit at 3D Toa Payoh centre. Then we delayed key collection to the new flat. Called Bryan to extend booking to Oct 2015. No problem, no question asked. By the time we decided to start renovation, it was Dec 2015. We told Bryan that we need to move into the new flat by mid Jan 2016----"Ok! Do my best." During renovation, liked our hacked wall column installed with HDB ceramic tiles instead of being plastered and painted. It was done. We changed painted colors to 2 walls. It was done. We shifted into the new flat on 16th Jan 2016. Paid up fully by end Jan. We discovered the top of kitchen cabinet was laminated white instead of wood grain. Bryan got it fixed within a week. In end Mar 16, we discovered a minor defect in the floor tile. Would any contractor entertain us way after full payment? I called Bryan. Today, it has been fixed. So very glad and satisfied ee engaged this young man.We signed a BTO package in Aug 2015 with $500.deposit at 3D Toa Payoh centre. Then we delayed key collection to the new flat. Called Brtan to extend booking to Oct 2015. No problem, no quedtion asked. By the time we decided to start renovation, it was Dec 2015. We told Bryan that we need to move into the new flat by mid Jan 2016----"Ok! Do my best." During renovation, liked our hacked wall column installed with HDB ceramic tiles instead of being plastered and painted. It was done. We changed painted colors to 2 walls. It was done. We shifted into the new flat on 16th Jan 16. Fully paid up by end Jan. We discovered the top of kitchen cabinet was laminated white instead of wood grain. Brtan got it fixed within a week. In end Mar 16, discovered a minor defect in the floor tile. Would any contractor entertain us way after full payment? I called Bryan. Today, it has been fixed. So very glad and satisfied ee engaged this young man.
-
We signed a BTO package in Aug 2015 with $500 deposit at 3D Toa Payoh centre. Then we delayed key collection to the new flat. Called Bryan to extend booking to Oct 2015. No problem, no question asked. By the time we decided to start renovation, it was Dec 2015. We told Bryan that we need to move into the new flat by mid Jan 2016----"Ok! Do my best." During renovation, liked our hacked wall column installed with HDB ceramic tiles instead of being plastered and painted. It was done. We changed painted colors to 2 walls. It was done. We shifted into the new flat on 16th Jan 2016. Paid up fully by end Jan. We discovered the top of kitchen cabinet was laminated white instead of wood grain. Bryan got it fixed within a week. In end Mar 16, we discovered a minor defect in the floor tile. Would any contractor entertain us way after full payment? I called Bryan. Today, it has been fixed. So very glad and satisfied ee engaged this young man.We signed a BTO package in Aug 2015 with $500.deposit at 3D Toa Payoh centre. Then we delayed key collection to the new flat. Called Brtan to extend booking to Oct 2015. No problem, no quedtion asked. By the time we decided to start renovation, it was Dec 2015. We told Bryan that we need to move into the new flat by mid Jan 2016----"Ok! Do my best." During renovation, liked our hacked wall column installed with HDB ceramic tiles instead of being plastered and painted. It was done. We changed painted colors to 2 walls. It was done. We shifted into the new flat on 16th Jan 16. Fully paid up by end Jan. We discovered the top of kitchen cabinet was laminated white instead of wood grain. Brtan got it fixed within a week. In end Mar 16, discovered a minor defect in the floor tile. Would any contractor entertain us way after full payment? I called Bryan. Today, it has been fixed. So very glad and satisfied ee engaged this young man.
-
We signed a BTO package in Aug 2015 with $500 deposit at 3D Toa Payoh centre. Then we delayed key collection to the new flat. Called Bryan to extend our booking to Oct 2015. No problem, no question asked. By the time we decided to start renovation it was Dec 2015. We told Bryan, we need to shift into the new flat by mid Jan 2016---"Ok! Do my best." During renovation, like our hacked wall column installed with HDB ceramic tiles instead of being painted. It was done. We changed painted colors to 2 walls. It was done. We shifted into the new flat 16th Jan'16. Paid up fully by end Jan' 16. We discovered the top of kitchen cabinet was laminate white instead of wood grain. Bryan get it fix within a week. In end Mar'16, discovered s minor defect in the floor tile. Would any contractor entertain us way after full payment. I called Bryan. Today, it has been fixed. So very glad and satisfied we engaged this young man.
-
We signed a BTO package in Aug 2015 with $500 deposit at 3D Toa Payoh centre. Then we delayed key collection to the new flat. Called Bryan to extend our booking to Oct 2015. No problem, no question asked. By the time we decided to start renovation it was Dec 2015. We told Bryan, we need to shift into the new flat by mid Jan 2016---"Ok! Do my best." During renovation, like our hacked wall column installed with HDB ceramic tiles instead of being painted. It was done. We changed painted colors to 2 walls. It was done. We shifted into the new flat 16th Jan'16. Paid up fully by end Jan' 16. We discovered the top of kitchen cabinet was laminate white instead of wood grain. Bryan get it fix within a week. In end Mar'16, discovered s minor defect in the floor tile. Would any contractor entertain us way after full payment. I called Bryan. Today, it has been fixed. So very glad and satisfied we engaged this young man.
