Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

naimrahc88

Members
  • Content Count

    4
  • Joined

  • Last visited

Community Reputation

0 Neutral

About naimrahc88

  • Rank
    Newbie

Previous Fields

  • Gender
    Female

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

  1. Looking to do up my flooring with marble. Anyone able to provide a price for marble flooring? Labor + raw materials?
  2. DEMOLITION WORKS 1) Hacking of existing floor tiles and skirting for living/dining halls and study 2) Hacking of existing laminated floor, cement screed and skirting for 2 bedrooms 3) Hacking of existing floor tiles and wall tiles for kitchen 4) Hacking of existing floor tiles and wall tiles for MASTER TOILET Subtotal $3,680.00 5) Hacking of existing concrete bases, sink/stove at kitchen 6) Hacking of existing toilet bowl and basin for MASTER TOILET 7) To dismantle and disposal existing kitchen cabinet 8) Hacking of existing wall between kitchen and dining hall 9) Hacking of existing wall between bedroom 1 and living hall 10) Hacking of existing wall mirror at dining hall Subtotal: $1,380.00 11) Hacking of existing entrance and wall for master room 12) Hacking of New entrance for master toilet 13) Hacking of existing wardrobe and cabinet for bedroom 1 14) Hacking of existing shoerack **** hall Subtotal: $680.00 MASONRY WORKS 1) Living/dining halls and study room: Supply/labour to lay and polishing marble (include cements ans sand) 2) Master room and Bedroom 1: Supply/labour to lay and polishing marble (include cements ans sand) Subtotal: $ 7,800.00 3) Kitchen: Supply/construct ceramic/homogeneous floor tiles for kitchen (<$3 psf) $ 1,380.00 4) Kitchen: Waterproofing to be carried out for kitchen $350.00 5) Kitchen: Supply/lay full height wall tiles for kitchen(<$3 psf) exclude cabinet area $2,280.00 6) Kitchen: Supply/construct 50mm height kitchen cabinet base with tile skirting finish $550.00 7) Kitchen: Supply/construct 50mm height kitchen fridge base with tile finish $180.00 8) Kitchen: Supply/construct 50mm height kitchen washing machine with tile finish $180.00 9) Kitchen: To make good on affected walls after hacking of existing wall $250.00 10) Kitchen: Supply/erect 1/2 height concrete wall with hollow blocks below glass panels $980.00 11) Master toilet: Supply/construct non-slip floor tiles (<$3 psf) $680.00 12) Master toilet: Waterproofing to be carried out $460.00 13) Master toilet: Supply/construct 2 tone full height wall tiles (<$3 psf) $ 1,880.00 14) Master toilet: Supply/construct shower kerb with floor tiles $180.00 15) Master toilet: Supply/construct entrance kerb with floor tiles $ 50.00 16) Master toilet: To make good after hacked new entrance $ 180.00 17) Master toilet: Supply/erect concrete wall with hollow block to seal up existing entrance $480.00 18) Master toilet: Supply/construct low walls for build in long bath (owner will purchase long bath) $680.00 19) Bedroom 1: To make good on affected walls after hacked existing walls $220.00 20) Master room: To make good on affected walls after hacked existing walls and door frames $180.00 21) Master room: Supply/erect 1 no. timber door frame and concrete wall for new entrance $ 580.00 PLUMBING WORKS 1) Supply/replace kitchen and both toilets piping to copper (conceal piping) $2,280.00 2) Supply/replace conceal drain pipe for sink 3) Supply labour to install new sink and sink tap Subtotal: $120.00 4) Supply/replace conceal drain pipe for washing machine 5) Supply/replace conceal drain pipe for master toilet basin 6) Supply labour to install master toilet basin and tap $ 550.00 7) Supply labour to install master toilet bowl 8) Supply labour to install 1 no. storage electric water heater 9) Supply labour to install master toilet accessaries 10) Master toilet: Supply labour to install longbath (include connection inlet and outlet) $ 220.00 DOORS, GLASS 1) Master room: Supply labour to remove and reinstall existing master room door $150.00 2) Kitchen: Supply/install 10mm tempered swing glass door (include fixed glass panel above low wall) $980.00 3) Master toilet: Supply/install 1 no. tempered glass fixed panel (10mm) $ 280.00 4) Master toilet: Supply/install 1 no. swing tempered glass door for entrance $590.00 5) Bedroom 1: Supply/install 10mm tempered swing glass door (include fixed glass panel above low wall) $ 880.0 CEILING WORKS 1) Kitchen: Supply/construct false beam to cater for top glass panel $ 320.00 2) Kitchen: To make good on affected false ceiling after hacked walls $ 250.00 3) Bedroom 1: Supply/construct false beam to cater for top glass panel $ 280.00 4) Master toilet: Supply/install new false ceiling c/w 1 no. manhole $480.00 CARPENTRY WORKS (3.3m ceiling height) 1) Supply/install solid laminated kitchen cabinet (top/bottom=22fts) include dishrack, 2 glass panels c/w laminated frame, ABS trims and cultury tray $2,860.00 2) Supply labour to install cooker hood, cooker hob and oven FOC 3) Supply/install quartz top c/w backsplash for kitchen cabinet (14fts) $ 1,820.00 4) 800.00 $ 5 Supply/install quartz top for island cabinet (0.6m x 1.5m) 720.00 $ 6 Study room: Supply/install full height laminated wardrobe c/w sliding doors (8ft width) 2,400.00 $ 7 Bedroom 1: Supply/install full height laminated L-shape bookshelve c/w openshelvings (10width) 3,200.00 $ 8 Bedroom 1: Supply/install laminated platform bed (partial on existing bay window) 1,450.00 $ 9 Bedroom 1: Supply/install 2 nos. laminated side cabinet above platform bed 1,800.00 $ 10 Bedroom 1: Supply/install laminated top storage above platform bed (900mm depth) 1,440.00 $ 11 Living hall: Supply/install full height laminated tv console as proposed 10ft width 3,200.00 $ 12 Living hall: Supply/install full height laminated shoerack as proposed (5width) 1,500.00 $ 13 Master toilet: Supply/install laminated suspended cabinet below vanity 490.00 $ 14 Master toilet: Supply/install quartz vanity (exclude basin) 480.00 $ 15 Master toilet: Supply/install mirror cabinet above vanity and toilet bowl 750.00 $ ELECTRICAL BREAKDOWN 1 Living hall: Supply/lay 1 no. SCV point and 1 no. power socket as proposed 200.00 $ WHOLE HOUSE AND GENERALS 1 Painting of whole house walls/ceilings with ICI pentalite or Nippon 5000 (5 colours + 1 white for ceilings) 1,480.00 $ 2 Supply/lay currogated board to protect new flooring (include disposal) 120.00 $ 3 Debris removal services to be carried out 780.00 $ 4 Uplift renovation materials services to be carried out 5 Whole house acid washing and cleaning 350.00 $ GRAND-TOTAL:NO GST 58,480.00
×