Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

eulophiella

Members
  • Content Count

    2
  • Joined

  • Last visited

Community Reputation

0 Neutral

About eulophiella

  • Rank
    Newbie

Previous Fields

  • Gender
    Female

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

  1. Hi guys! First time renovating our first home, so just to be more cautious, could any of you spend some time to take a look at our quote? Are tiling work and carpentry reasonable(eg item 6 and 10)? Thank you!! S/N Work Description Qty Units LIVING AND DINING AREA 1 Supply Labour and Materials Laying of Homogeneous Tiles ($3.20 per sqf.) 255.0 sqf 2,601.00 2 Supply Labour and Materials to Install Baseboard or Skirting (Homogeneous Tiles) 47.5 ft 242.30 3 Settee 5.5 ft 748.00 4 - Settee with internal Color PVC 5.5 ft 140.30 5 - Settee with hydraulics hinge (pair) 3.0 lot 114.80 6 TV Console in Laminates 8.5 ft 1,192.20 7 - TV Console with internal Color PVC 8.5 ft 216.80 8 - TV Console comes w/ glass door <600mm width 2.0 lot 153.00 9 - Soft Closing Door Hinge (BLUM) 8.0 lot 54.40 10 TV FW Cab <8ft ht 8.0 ft 2,169.20 11 - TV FW Cab <8ft ht special design 8.0 ft 693.60 12 - Soft Closing Door Hinge (BLUM) 18.0 lot 122.40 13 - <8ft ht c/w Coloured Pvc 8.0 ft 442.00 14 Shoe Cab <8ft ht 4.0 ft 918.00 15 - Open Box in laminated finish 4.0 ft 306.00 16 - C/w Soft Closing Hinges (Blum) 8.0 lot 54.40 17 - <8ft ht C/w Coloured Pvc 4.0 ft 221.00 18 Sliding Window (Silver/Bronze) 4ft 11.5 ft 615.90 19 Casement Window 4ft (Silver / Bronze) 11.5 ft 664.70 KITCHEN - 20 Supply Labour and Materials Laying of Homogeneous Tiles ($3.20 per sqf.) 180.5 sqf 1,841.10 21 - Overlay w/ Water Proofing Membrane 1.0 lot 306.00 22 Kitchen Bottom Cabinet <4ft ht 19.5 ft 2,734.90 23 - Kitchen Bottom Cabinet C/w Coloured PVC 19.5 ft 497.30 24 - Kitchen Bottom Cabinet c/w Cement Plinth 19.5 ft 497.30 25 - Kitchen Bottom Cabinet C/w Blum Soft Closers Drawer H560 30kg 4.0 lot 285.60 26 - Kitchen Bottom Cabinet c/w Blum Soft Closers 26.0 lot 176.80 27 Fabricate & install quartz (iQuartz - I series) <600mm 19.5 ft 2,138.20 28 Kitchen Cabinet Tall Unit (8ft High) 5.5 ft 2,173.90 29 - Kitchen Cabinet Tall Unit c/w Cementh Plinth 5.5 ft 163.70 30 - Kitchen Cabinet Tall Unit c/w Blum Soft Closer 14.0 lot 95.20 31 - C/w Colored PVC 5.5 ft 303.90 32 Supply labour to install kitchen sink 1.0 lot 137.70 33 Kitchen Top Hung Cabinet < 4ft ht 13.5 ft 1,893.40 34 - Soft Closing Door Hinge (BLUM) 14.0 lot 95.20 35 - C/w Coloured PVC 13.5 ft 344.30 36 - Blum HK Mechanism for Dish Rack Cover 1.0 lot 180.20 37 Glass Backing - Tempered 2.5 ft height 10.5 ft 553.40 38 - Cut-out access/ switch holes for glass 2.0 lot 103.70 39 Sliding Door Feature Wall 1.0 lot 833.00 40 Casement Window 4ft (Silver / Bronze) 4.5 ft 260.10 MASTERS BEDROOM - 41 Supply Labour and Materials to Install Vinyl Only Flooring (Clip On) 109.3 sqf 826.50 42 Supply Labour and Materials to lay cement screed (w/o tiles) 109.3 sqf 835.80 43 Demolish existing wall (HDB) 3.0 ft 173.40 44 - Make good (Major) (HDB) 1.0 lot 382.50 45 Sliding Door Feature Wall 1.0 lot 833.00 46 Supply Labour and Materials to Install Baseboard or Skirting (MDF) 39.5 ft 201.50 47 Display Shelves in Laminates (<300mm Depth) 10.0 ft 510.00 48 Casement Window 4ft (Silver / Bronze) 8.0 ft 462.40 49 Sliding Grilles (Silver/Bronze) 4ft 8.0 ft 190.40 BEDROOM 2 - 50 Install CHB 11.0 ft 1,496.00 51 Demolish existing wall (HDB) 11.5 ft 664.70 52 - Make good (Major) (HDB) 3.0 lot 1,147.50 53 Supply Labour and Materials to lay cement screed (w/o tiles) 156.8 sqf 1,199.20 54 Supply Labour and Materials to Install Vinyl Only Flooring (Clip On) 170.0 sqf 1,286.10 55 Veneer Ply Casement Door (lever lock) 1.0 lot 387.60 56 - Solid Timber Door with Frame 1.0 lot 165.80 57 Casement Cabinet 8 ft ht 7.5 ft 1,823.30 58 Supply Labour and Materials to Install Baseboard or Skirting (MDF) 48.0 ft 244.80 59 Sliding Window (Silver/Bronze) 4ft 7.5 ft 401.70 60 Casement Window 4ft (Silver / Bronze) 8.0 ft 462.40 STUDY ROOM - 61 Supply Labour and Materials to lay cement screed (w/o tiles) 109.3 sqf 835.80 62 Supply Labour and Materials to Install Vinyl Only Flooring (Clip On) 109.3 sqf 826.50 63 Veneer Ply Casement Door (lever lock) 1.0 lot 387.60 64 - Solid Timber Door with Frame 1.0 lot 165.80 65 Bathroom Bottom Vanity Cabinet <4 ft 4.0 ft 550.80 66 - Soft Closing Door Hinge (BLUM) 6.0 lot 40.80 67 - Bottom vanity cabinet C/w Coloured PVC 4.0 ft 102.00 68 Fabricate & install Solid Surface (Cresto) <600mm; min. 4ft charge 4.0 ft 329.80 69 Supply labour to install wash basin 1.0 lot 63.80 70 FW Cab <8ft ht 4.0 ft 1,084.60 71 - FW Cab <8ft ht special design 4.0 ft 346.80 72 - <8ft ht c/w Coloured Pvc 4.0 ft 221.00 73 PD Door Acrylic (A001 - 024 series ) 1.0 lot 344.30 74 - PD G-Lock 1.0 lot 28.10 75 Install CHB 2.0 ft 272.00 76 Casement Cabinet 8 ft ht 13.0 ft 3,160.30 77 - In Special Design 5.5 ft 397.40 78 - C/w Coloured PVC <8ft ht 13.0 ft 663.00 79 Study Table (suspended) 6.5 ft 911.70 80 - Study table c/w Coloured PVC 6.5 ft 165.80 81 - Blum Soft Closers Drawer H560 30kg 4.0 lot 285.60 82 Top Hung Cabinet < 4ft ht 6.5 ft 928.20 83 - Top Hung Cabinet W/ Open Shelves 6.5 ft 359.20 84 - Soft Closing Door Hinge (BLUM) 10.0 lot 68.00 85 - C/w Coloured PVC 6.5 ft 165.80 86 Supply Labour and Materials to Install Baseboard or Skirting (MDF) 27.5 ft 140.30 87 Casement Window 4ft (Silver / Bronze) 4.5 ft 260.10 88 Sliding Grilles (Silver/Bronze) 4ft 4.0 ft 95.20 BATHROOM 1 - 89 Demolish existing wall (HDB) 2.5 ft 144.50 90 - Make good (Major) (HDB) 1.0 lot 382.50 91 PD Door Acrylic (A001 - 024 series ) 2.0 lot 688.50 92 - PD G-Lock 2.0 lot 56.10 93 Supply labour and Materials Hom. Tiles (<80sqf) (HDB), max. $3.20 psf with 10% wastage 1.0 lot 833.00 94 - Comes with Laying of Water Proofing 1.0 lot 306.00 95 Ceramic Wall Tiles (8 ft), max. $3.20 psf with 10% wastage 13.5 ft 1,101.60 96 Supply & install top hung windows (powder coated with wire mesh) 2ft< 1.0 lot 221.00 BATHROOM 2 - 97 Supply labour and Materials Hom. Tiles (<80sqf) (HDB), max. $3.20 psf with 10% wastage 1.0 lot 833.00 98 - Comes with Laying of Water Proofing 1.0 lot 306.00 99 PD Door Acrylic (A001 - 024 series ) 1.0 lot 344.30 100 - PD G-Lock 1.0 lot 28.10 101 Ceramic Wall Tiles (8 ft), max. $3.20 psf with 10% wastage 13.0 ft 1,060.80 102 Supply & install top hung windows (powder coated with wire mesh) 2ft< 1.0 lot 221.00 103 Supply labour to install wash basin 1.0 lot 63.80 UTILITY ROOM - 104 Supply Labour and Materials Laying of Homogeneous Tiles ($3.20 per sqf.) 60.0 sqf 612.00 105 - Comes with Laying of Water Proofing 1.0 lot 306.00 106 Casement Grilles 4ft (Silver / Bronze) 6.0 ft 163.20 107 Veneer Ply Casement Door (lever lock) 1.0 lot 387.60 108 - Solid Timber Door with Frame 1.0 lot 165.80 MISCELLANEOUS - 109 4Rm/<1000Sqf Paint w/h (exc doors) w/f selected Nippon Paint (max. 5 colours including ceiling in matex) with oil based sealant 1.0 ft 1,606.50 110 Hacking / Haulage / Floor Protection Works 1.0 lot 318.80 111 - Whole house general/chemical washing 1.0 lot 323.00 112 - Provide sand & haulage; 4 Rm HDB 1.0 lot 1,071.00 113 - Laying of Floor Protection 1.0 lot 187.00 114 - Hacking Door (With Frame) 4.0 lot 299.20 115 - Hack and Replace Garbage Chute 1.0 lot 297.50 116 - Clearing of debris 1.0 lot 178.50 117 - 4 Rm - Floor/Wall Tiles/ Sink& Stove (Kitchen, Bedrooms, Toilets) 1.0 lot 3,451.00 118 Plaster whole wall (major); Kitchen 1.0 lot 1,530.00 119 Plaster whole ceiling & walls (major); Whole house; exc. kitchen - 4 Rms 1.0 lot 3,060.00 120 Plumbing Works (Accessories/Pipings) 1.0 lot 59.50 121 - Supply labour to install storage heater 1.0 lot 114.80 122 - Supply labour to install spray rinser / spray bidet 1.0 lot 38.30 123 - Supply labour to install accessories (per toilet) 1.0 lot 59.50 124 - Supply & install whole unit stainless steel (cold); 3/ 4/ 5 Rm (joint bath) 1.0 lot 688.50 125 - Supply & install Hot S/S Pipe 1 Toilet - 2 point 1.0 lot 198.90 126 - Supply & install Cold Water Pipe S/S - Kitchen 1.0 lot 436.10 Total 76,320.60
×