Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

mynameissine

Members
  • Content Count

    5
  • Joined

  • Last visited

Posts posted by mynameissine


  1. Hi everyone! Apologies if these questions have been asked but I still have some doubts with regards to kitchen hood. I have never used kitchen hood before in my old house so this is the first time i am installing one.

    I am currently looking at slimline Fujioh hood FS-890. It comes with ventilation and recycle version. I understand that ventilation duct is not allowed in HDB.

    I am asking for recycle FS-890, its specs indicate that the oil fumes capture is 92% (or up to 92% I am guessing)

    1) How effective is it when it comes to capturing oil fumes? Does it actually helps?

    2) What does the airflow in the low/mid/high setting does?

    3) Actually I don't understand the filter system. " Fancy Clean Silicone Coated Slot Filter " Can I clean it or do I need to replace the filter system?

    Thank you very much.


  2. 7 hours ago, matchalatte said:

    mine's also a 3 room BTO, due to collect keys soon. spoke to 20 contractors & IDs and heres what i can estimate :

    1. no idea for this as my flooring is already done but usually its ard 4.50/psf for homogenous tiles?

    2. top & bottom kitchen usually between 110/130pfr. more expensive ones might come with internal colored PVC or blum/excel hinges. table top normal quartz standard series around 110-120psf, by acrylic i think u mean solid surface? im usually quoted around 90/psf.

    3. no idea abt asking them to provide toilet accessories but installation itself shd b around 120 to install a storage heater or 2 instant heaters, 120 to install all other toilet accessories.

    4. what is it for? 

    5. for lighting pt it shd b between 30-45 each, installation of light depends on what kind. normal ceiling light shd be 10-12 each. 

    6. painting for 3 room BTO im quoted around 1200 + additional 200-300 for the doors, frames, pipe etc. so will come up to ard $1500. if you think its too ex i would also recommending outsourcing, find yr own painter.

    7. tv console between 150-300 pfr. 

    finally, toilet bowl can be removed. shdnt be a prob to cover up but its better you ask yr contractor/ID or HDB. 

    Oh I see! Thank you so much for the info. Any contractors you can recommend? Also does your contractor have to come down to see your house before giving you a quotation? Thank you.


  3. Hi everyone. first time buy home. I know it sound silly but I would like to ask what's a realistic renovation price for 3rm flat.

    I only need a rough estimation of the renovation price before the contractor can come over to make a more accurately measurement. If possible, I would like to keep it between 10k~15k.

    This is a new flat. Basically nothing.


    What I need is:
    1) There is no flooring. So we will need flooring for the living room and 2 rooms. Just normal white ceramic tiles.
    2) Kitchen table top with cabinet, installation of hob and hood, kitchen sink. For kitchen table top, do let me know the price for (i) quartz material (ii) acrylic material (we will buy hob and hood)
    3) Toilet: heater, shower head, sink and mirror. (we will buy heater and shower head)
    4) Aluminum pole installation on room toilet and living room
    5) Elelctrical wiring and lighting (We will buy the lights)
    6) Paint job
    7) A shelf to put TV on top

    For the time being just a rough idea for these first.

    Sorry for such a stupid question but can master bedroom's toilet bowl be removed and cover up? Just asking. lol.

    thanks all.

×