  1. On 14/05/2017 at 0:56 AM, peihao83 said:

    Even thought the pipes are concealed deep inside the wall, the chances of damaging the pipes is very high.

    The hacker uses breaker to hack the wall. Which cause intensive vibration into the wall.

    Its recommended to change the piping. unless you want to hack again just to change the piping.

     

     

    How does a breaker look like?


  2. Casper, when i was renovating my 6 year old BTO resale flat, I had the same question when I asked my contractor is it really necessary to replace the original BTO hot and cold pipings.

    I saw that they were deeply concealed in the wall screed and should not be easily damaged even after hacking the wall tiles.

    In my heart, i know they are not necessary to be replaced and money can be saved.

    But he still insist that i replaced them and I bo bian...

    I guess, copper piping work are quite profitable for them... u know what i mean.


  3. Sometimes, i feel skeptical about "Recommended contractors" on this forum. Need to be really cautious about these self-advertising.

    Some of these contractors even go to the extend to create fake account to give themselves "good" reviews. it is not hard to identity these fake members who only post once on this forum and then suddenly went missing for good. I feel that these companies are so pathetic and miserable, they should just spend some good money to do proper marketing instead…


  4. On 26/07/2016 at 1:03 AM, bunnyrabbit88 said:

    I am sorry this is going to be lengthy, But i really need a platform to speak out during this emotionally stress period.

    We heard a lot about all those ****ed-up IDs and renovation companies & always think that we will not be one of the poor victim.

    We bought a resale flat few months back and was actively looking around for Interior firms to renovate our new nest. We need to move in urgently as our rental lease will expires soon and we had planned everything. Usually, the maximum time needed to renovate a resale unit is about 6 to 8 weeks. 

    We approach the friends we trusted first or anyone that was recommended by  our close family members. But it was either too expensive or that we feel not very comfortable with the ID. We do have contacts for all the contractors, but we really can't make time to tend to the renovation daily and to arrange all the works etc. Our budget was a reasonable $60k inclusive of furnitures. We did our own space planning and basically, we don't need a designer, we just need someone to carry out the works and coordinate with the contractors. We gave our own requirements and design.

    I still don't know how and who introduced me this guy, S Lee. So i was checking out their Company's FB page and decided to ask him for a quotation. His quotation was so far the most reasonable price, deducting all the contractors' cost, he earn about less than $5k. Most importantly, when he did the measurements, he seems really experienced, able to answer our questions and give advise correctly. We went to view one of his customer's unit (to see the carpentry work) and decided to engage his service.

    The renovation started somewhere in Mar and was not ending yet, in May. 

    The MAGNIFICENT ID

    In my entire life, i've never met such low-class person with such ridiculous attitude. When we went up to our unit to inspect, usually we will text him or call him for an update of the work that was done. As owners, we are much more diligent than them because it will be our flat, a place we will stay for long term.

    1. It was never automatically mentioned / updated to us about the progress of the renovation.

    2. When it comes to payment, especially when we hold the payments because of many works that was not completed, his attitude will start to come. Say we need to consider his plight as he needs to pay all the workers, contractors and supplies for the works and products etc.

    3. Delays, delays and delays! There was so much delay.

    4. He was rude - We communicate mostly through whatsapp. We was arguing (yes, arguing! We paid to make ourselves feel angry and pissed!) and he said "Enough!". So great, i bear with it because the carpentries are not completed, i could not afford to let the amount i paid go to waste.

    5. He was always uncontactable, either line got cut, no answer or no tone. He seems never appearing in the morning but will reply in wee hours.

    6. Many times contractors are not able to contact him because he would not answer his phone or reply msg. They could not find him when they need to seek his instructions and he blame them for contacting the owners to open the door when clearly he was the one that was nowhere to be found.

    7. He claimed that he had been tolerating us for a very long time and that he had been very patient. [Wow! I am so AMAZED!]

    8. He claims that we called him every single day, and yes, the every single day mostly was miss call cause owls were asleep in the morning. Why would there be no call from owners when there was so many outstanding works, so many defects, so many bits & pieces of things that was done incorrectly. It was shocking to see all the edges and corners of your house so badly done. Paints unevenly at the edges and cement screed wasn't even lay even.

    9. You will have contractors knocking your door asking if you've paid the ID because the ID claimed that the owner did not pay him thus, not paying the contractors.

    10. You CANNOT call him on a Sunday or Public Holiday (which is mostly all working people's non-work day) because its his off day and he needs a lot of rest.

    11. He will appear in your flat less than 10 times for the entire renovation.

    12. He will not check on the work that was done because "I have many other units, not just this."

    13. He will twist his words and claimed that he dint say when he said previously.

    14. He will argue with you when you say the job was not up to satisfaction.

    15. He will blame anything and everything except for himself when clearly, it was because the lack in supervision and inspection that resulted in such bad works done.

    16. He do not even know at times what are to works carried out for the day, and there were days when no one turned up to do any work at all.

    17. It must be at HIS convenience not YOUR convenient. 

    And the list goes on.... More and more ugly stories about the ID was slowly revealed.

    It was such a regrettable choice for us, choosing this firm and this specific person.

    It made us sick to the stomach just talking or texting him.

    Renovation [Feedback on the works done]

    3D Drawings

    The 3D drawings were only given to me when i chase for it. I hold the 2nd payment and release it only after the 3D drawing is out and to satisfaction (1st payment of 10% given upon signing contract). The drawing looks very much like copied and pasted from some other sources. It was so horrible! The design, the carpentry, the flooring, even the paint colour was wrong! All the ID kept asking for was payment. Prior choosing of the laminates, we've told him specifically that laminates samples and actual laminates might look different in whole (especially big pieces such as TV feature wall / cabinets) , we need to match the colour so the 3D is very important as it shows about 80% similarity from actual. The 3D drawings took a total of 2 weeks to be ready. And yes, its only sent to you via whatapp or e-mail (if you request) with no hardcopies. #anger1

    Tiling Works

    The tiler was a very nice Malaysian man in his late 30s. We visited the flat everyday, weekday evening and weekend morning/afternoon. The tiling work was half-way done and it stopped... Yes, it stopped work for a good 1 weeks before resuming. The tiler told us that the ID was uncontactable, he finds it very hard to work because he is afraid that he might do wrongly. And so, work was delayed.

    Flooring

    The ID advised me to hack all my existing tiles because they were all old and might "pop-out" soon. We agreed on laying cement screed (we still couldn't make up our mind what to do with the floor yet). We proceeded to hack the floor and existing skirting.

    Carpentry

    The carpenter was also a Malaysian. They have a factory in JB. Their workmanship fine and great. He was really honest and will explain to us the pros and cons of the carpentry, clean it very well before he leaves and update us accordingly. We did 2 beds, 2 wardrobe and kitchen Top + bottom cabinets. ****IF YOU WANT HIS CONTACT PM ME***** 

    Electrician

    I really feel like fainting when i see how the electrician do their things. They are a 2 man team, really nice people but workmanship really very very bad. (If you would like to see photo, pls pm me) The sockets are crooked, box up horribly, most importantly, they were supposed to use cement type of silicon to fill the gaps of the box-up, but they used the other type of smooth silicon and another type of cement to patch up bit by bit. **Side note: If you are a resale flat, pls make sure they patch/fill the gaps with cement type silicon. Usually electrician will know. but mine sadly don't seems to.** I was so freaking sad and stressed out seeing how ugly they've patched the walls. Ours was a resale, so that cables / box-up are not concealed. It was so ****ing god-**** ugly that even the paint couldn't paint over. 

    Plumbing

    So far okay. They were very helpful, fixed everything well and steady.

    Painting

    Arrogant Painter, doesn't give a **** at all. He painted without covering the floor, never patch, never at least clean the wall a little before painting. Painted on the existing window and still insisted that it was the old paint. How could it be the old paint when it is the EXACT same colour as the current wall. The painting was also horribly done. You can see patches here and there, floor with paint, floor skirting with paint all because he did not bother to put in effort. The best part was, the door frame was of different colour. The painter said all was instructed by the ID. He was merely following instructions. Less than 2 months staying, my paint already starts to peel off. Did i forgot to mention that the painter only come to paint, the paint was bought by the ID himself.

    Guess these most of the important works that was carried out.

    Done venting out my anger and hope there is no other victims like me. I hope everyone can share their horrible experience with IDs like such!

     

    I feel you... i had similar bad experience with my ID cum contractor :: :~


  5. On 08/10/2016 at 7:23 AM, Daytona4130 said:

    Just had my renovation done. absolutely disappointed with the service and quality of the work done but happy to pay off the final payment and get them out of my house asap. Didn't even bother to do a detailed handover as i have completely lost faith in the firm. The biggest joke is that they repeatedly WARNED me not to hide behind keyboard and make any posting abt their firm..  well, i told them i will share my experience and there is nothing wrong with that. 

    All started well with submission / amendment of quotes and finally the signing. Replies were prompt and the ID make every effort to accommodate our timing and place to meet to talk abt his quotations. We don't make unreasonable requests and have never asked to meet at odd hours or Sundays. The ID told us weekend is his family time and we respect that. Lots of assurance from him, "don't worry", "simple job" "won't cost much".. Though the contract was drafted in very generic contract clauses, like installation of all kitchen fittings, installation of all sanitary fittings, general hacking work, instead of listing individual items,. The ID gave lots of assurance saying "don't worry, i am very gentleman one. not like other contractors. Won't say not included in contract. no black and white"  Biggest mistake to believe him.... That's where the problem begins.......  

     

    sorry to hear about similar nightmare like mine... can u pm me the company name?


  6. 1 hour ago, zph19101 said:

    that's true.. False ceiling guy and electrician are two different person.

    You have to run the wiring first before constructing the false ceiling.

    What if the project manager who is suppose to find both to get the work done, but instead only provide ceiling work contractor but ask you to find your own electrician...

    i really pity this guy who get into this type of sh*it from his project manager...


  7. On 31/01/2017 at 5:43 PM, Scarab72 said:

    我是这两间公司的承包商。两间地址都一样,在 ubi 一带。合作有几年时间了。近一年收钱的时候,每次都是老板出国,或者支票本没支票。最后一次在九月份要收钱,够力又拖了好几个月。幸好在新年前收得到,不过有几个就没那么好彩收到。从他们口中得知,他们欠外面有数$100,000以上那么多。所以本人在此想各位承包商及屋主当心。 现在外面臭脚很多,得注意。

    在此也申明,本人非捏造事实,全都是本人经历及听人盛传。

    我们也是中招了。。 :~:~:~


  8. On 22/08/2009 at 10:05 PM, Tiler Seng said:

    Provide direct labour to Lay floor and wall tiles include hacking and plumbing, Licensed contractor, Offer reasonable price.

    Interested please call: 82008901

    “Licensed contractor with offering a reasonable price.”

    Over a decade, Designer House Pte Ltd providing professional consultation, interior design & adaptation, decoration and fully turn-key services for all type of

    residential and commercial work. Specialized and direct labor for tiling work include hacking and plumbing.

    We continuously improve our service, quality and standard to make our customer happy and make their dream come true.

    Hi, can you quote me for renovating 2 bathrooms?

     

×