  1. it costed $80. if i m not wrong, need to pay this amount anyway even if u don't install the free heater, and gas pipe can only be laid by citygas.
  2. reno update: carpentry works done, pending touch-up only. lights installed. tempered glass sliding door installed. toilet accessories installed. Will upload pics once I remember to bring camera there.
  3. nice nice! i like the tv wall and the curvy desk in master rm.
  4. reno update: false ceiling, L-Box done. wall groove plastered. hdb replaced svc balcony door & balcony sliding door, but sliding door unable to lock.
  5. Reno status update: hacking done; make good of affected flooring area in progress; water pipe replaced with s/s pipe, added hot water pipe. air-con trunking done. hdb replaced balcony sliding door, but caused balcony skirting chipped off, sliding door lock not installed yet. hdb replaced vanity top in master bdrm toilet: gas pipe installed by Citygas, free gas water heater from Citygas installed in svc balcony.
  6. welcome! PMed u my unit no. as far as I know, our blk alone has 3 reno projects with Aranus, and blk357b has one at least, 360x has one at least, seems Aranus are doing well and should be quite experienced with our Sembawang EA. Regarding their service and workmanship, i will say so far so good. reno not complete yet, hope workmanship & service are both good in every aspect...
  7. i prefer to buy tv console off rack also bcoz save $$$, but due to special shape of our bdrm, think better to hv custom made one. the wiw is in the study rm. yep, i hack away the wall between master bdrm and study rm, & build wall at the current study rm door. Also visited one neighbour in our blk, they hacked both the wall and study rm door, moved the master bdrm door forward, and use glass panel and sliding door in between master bdrm and study rm, very nice. Thanks! u too... hv a wonderful weekend!
  8. I'm waiting for hdb to fix the defects also. toilet bowl leakage already fixed. bi-fold door of bathrm1 replaced, but created another defect - tile skirting chipped off. vanity top chipped off at corner. balcony and svc balcony doors to be replaced, hdb already dismantled the doors yesterday. not sure if there's other defect I over looked. anyway, reno started liao, can't report defect anymore.
  9. ya, my id doing things quite fast. went to my plc this morning, electrical wiring done. hdb also dismantle my balcony sliding door and svc balcony door due to defects, guess will install the new ones these days. took some pics using my phone (with wrong setting of resolution ) base for sink: base for kitchen cabinet and wiring for hood power: L-box wiring: wiring at passageway: kerb at bathrm 1:
  10. design update of kitchen cabinet: reno update: cabinet base, fridge base, washer base, kerbs in both bathrms done. went to take a look, tiling workmanship quite good. plumbing, wall hacking, and electric wiring today... hope everything goes smoothly.
  11. i think ur pink floor matches red cabinet better than my creamy floor does.
  12. hi ahberden, thx for the comment. ur reno seems 95% done as carpentry already installed, any pic of ur new plc? my ID is Candy from ARANUS.
  13. just posted some pics of 3D drawing on my t-blog. comments & suggestions are welcome! thx
  14. some pics of perspective drawing... low cabinet at foyer: kitchen cabinet (thinking of using darker red instead of such a bright one, comments welcome...) kitchen sink: master bdrm: walk-in wardrobe: all comments are welcome!
  15. ID just loading cement, sand only. still in original condition. will upload more pics as the reno going on. u collected ur keys? 30 keys, quite a big bunch.
  16. ha! our units r very nearby. my plc is at the same blk as yours. my ID is ARANUS, total contract costs ard 24k - kitchen, wardrobe, hacking, false ceiling/LBox, low cabinet, window/balcony grille, etc... no feature wall, thus interested in candyprincess's painted tv wall, keke... yep, u will start to pay CF $70+/mth, actually need to pay 3 mths upfront CF upon sign the agreement at hdb. after collect the keys, remember to check everything in ur unit - tiles, toilet bowls, basin, vanity top, doors, windows, electrical points, blah blah, and report defects to hdb branch.
  17. glad to see ur sweet home in making. you paint the tv wall or use wall paper? it looks nice.
  18. ID nearby my current plc. they r going to lock my gate this weekend and start uploading sand, cement, etc next week.
  19. hi candy, I'm leaving the round corner empty first, maybe put a reclining chair there... looking forward to more pics of ur unit. my reno will start next week. still waiting for hdb to fix some defects...
  20. saw pic from other thread, can't remember where, front loading washer and dryer stacked together. u may consider, or hv to give up dryer.
  21. yes, it's a D&B EA flat. hi, neighbour candyprincess, nice to meet u here. how u deal with the funny shape of ur master bdrm? still headache on this...
  22. big pipes hidden behind the wall, just couldn't see them in the pic only... it's abt 7ft X 4ft, not sure if it's really big, but sure big enough to put washer there, and hang cloth when it's raining outside.
  23. foyer & living rm, taken from balcony: dinning & passage way, taken from living hall: kitchen - 25 ft cabinet to be put here, with black galaxy granite worktop svc balcony, taken from kitchen: entrance of study rm and master bdrm. going to hack the wall between study rm and master bdrm and make study rm multi-functional - walk-in wardrobe cum study
  24. oops... nvm. started a new topic "New Nest @ Sembawang" and discard this one Thx Apple. New thread: http://www.renotalk.com/forum/index.php?showtopic=11821
×