simplez 0 Report post Posted October 29, 2009 Hi, does anyone know if it is a must/need to get PUB for testing? N get a LEW to chop and sign the circuit diagram? Lastly, the electrician quoted me 180 for submission on upgrade to a 63Amp supply as I am going to install an air con. As the current house is old and does not have an air con. Can I do the submission myself? Thank you. Share this post Link to post Share on other sites