Hi all,

As I would only be getting my EA in end of Dec this yr, can someone advice me how long would it take for the entire reno?

I really hope it can be done within one month so that I can spend my CNY in my new place.

Reno work includes :

1) Hacking of 1 kitchen wall

2) Rebuilt half of a room wall (Converting current study rm which is half glass to solid wall)

2) Hacking of living, dining, 4 bedrooms, kitchen, toilets & balcony tiles (Total of 144sqm)

3) Wet work and laying of tiles

4) Carpentry work for kitchen cabinet, 3 built in wardrobe and 1 TV console

5) Installing of all sanitary ware

6) Minor electrical work

7) All others misc work...

Can some kind soul help me with this.. I have not yet contact any ID/Contractor so I really wish to know whether is it doable in one month?

Edited by payton
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request
Hi all,

As I would only be getting my EA in end of Dec this yr, can someone advice me how long would it take for the entire reno?

I really hope it can be done within one month so that I can spend my CNY in my new place.

Reno work includes :

1) Hacking of 1 kitchen wall

2) Rebuilt half of a room wall (Converting current study rm which is half glass to solid wall)

2) Hacking of living, dining, 4 bedrooms, kitchen, toilets & balcony tiles (Total of 144sqm)

3) Wet work and laying of tiles

4) Carpentry work for kitchen cabinet, 3 built in wardrobe and 1 TV console

5) Installing of all sanitary ware

6) Minor electrical work

7) All others misc work...

Can some kind soul help me with this.. I have not yet contact any ID/Contractor so I really wish to know whether is it doable in one month?

Frankly es doable in 1 mth provided u find the correct CONTRACTOR.I feel that the sales co ordinator must be a very ongoing person to check everything time and again and it also helps if u can make up your mind quickly abt your lamnates,tiles and designs.My mum whole house is completed in 3 weeks only left washing.To be done on friday then i am gonna load all pics.

 

Share this post


Link to post
Share on other sites
Frankly es doable in 1 mth provided u find the correct CONTRACTOR.I feel that the sales co ordinator must be a very ongoing person to check everything time and again and it also helps if u can make up your mind quickly abt your lamnates,tiles and designs.My mum whole house is completed in 3 weeks only left washing.To be done on friday then i am gonna load all pics.

3weeks! that is real fast. I also hope i can finish within 3weeks so that i can have ample time to move in the furniture and clean up. Do you have a t-blog? Can you pm me your contractor's contacts? I need to look for quotation soon. Just gotten my floor plan and need to plan ahead now. Thanks in advance

 

Share this post


Link to post
Share on other sites

Hi,

I can recommend my contractor to you. His service and workmanship is very good. If you want, i can pm his contact to you.

Thanks.

Hi, can I have the contractor's contact too?

Thank you!

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×