tayee99 0 Report post Posted August 18, 2011 (edited) Hi everyone,I'm not good at blogging, so my post will be short, sweet and simple.Brief introduction. Renovation completed and moved in. Just to share the before, during and after reno pictures.Why farm for us? Cos we are family of 4 with chinese horoscope of farm animals.Here's the original plan. 5 Room. Bought the unit in rush cos near my parents and to move in before my maternity leave ends and for the convenience to bring my twins to and fro from my parents place. Dont really like the layout and infact find it a bit weird with the master bedroom door entrance in the middle of the hall.Uploaded with ImageShack.us Edited August 18, 2011 by tayee99 Share this post Link to post Share on other sites
tayee99 0 Report post Posted August 18, 2011 Some photos of pre-renovated conditions.Ex-owners claimed that the theme is Balinese. But hmm... ??? you guys take a lookEntrance FoyerUploaded with ImageShack.usLiving / Dining HallUploaded with ImageShack.usKitchenUploaded with ImageShack.us Share this post Link to post Share on other sites
tayee99 0 Report post Posted August 18, 2011 Continued.Common BathUploaded with ImageShack.usMaster BathUploaded with ImageShack.usMaster BedroomUploaded with ImageShack.usCommon BedroomUploaded with ImageShack.us Share this post Link to post Share on other sites
IPineapple 3 Report post Posted August 18, 2011 Welcome to RT. hahahah...guess the EX owners never really been to Bali or know the definition of Balinese. Some photos of pre-renovated conditions.Ex-owners claimed that the theme is Balinese. But hmm... ??? you guys take a lookEntrance FoyerUploaded with ImageShack.usLiving / Dining HallUploaded with ImageShack.usKitchenUploaded with ImageShack.us Share this post Link to post Share on other sites
tayee99 0 Report post Posted August 18, 2011 Now the confirmed plans. (with some deviations thou)In short, all demolished including floor and wall tiles. Only retained the 2 common bedroom doors.Layout PlanUploaded with ImageShack.usCeiling PlanUploaded with ImageShack.usBrief of what we have done.demolition works- dismantle all carpentry works- hack all floor and wall tiles- hack kitchen wall to open up areas- hack master bedroom wall to relocate door opening and extend out a bit for another row of wardrobespartition and ceiling works- false ceiling as per plan- partition wall with glass panel to create study corner- boxed up all unsightly pipeworks in the toiletsdoors and windows- veneer door for master bedroom- wrought iron gate for main entrance- aluminium window grilles for whole house- re-varnish existing doors for common bedrooms- glass shower screen and door for toilets- glass entrance door for toilets- glass panel and sliding door for kitchenfloor and wall finishes- floor and wall tiles to 2 toilets- floor tiles to living and dining hall - laminate flooring to study area and 3 bedrooms- timber skirting- general paintingcarpentry works- foyer shoe cabinet cum feature wall(10ft)- living hall tv feature wall cum console(11ft)- dining hall feature wall (20ft)- kitchen top and bottom / full height cabinet + glass backing (26ft)- common bath entrance feature wall (7ft)- common bath bottom cabinet + ledge + mirror(6ft)- master bath top and bottom cabinet (6ft)- master bedroom wardrobe (20ft)- master bedroom bedhead feature wall (8ft)- master bedroom platform- master bedroom TV console- study area table and top cabinet (6ft)- study area seatee (6ft)- no carpentry works for both common bedrooms (plan later when they grow up)aircon workssystem 2 for living and dining hall and study areasystem 3 for bedroomsplumbing workselectrical works Share this post Link to post Share on other sites