shanluvs 0 Report post Posted April 2, 2012 hi everyone, hope to seek your advice on this.i have a new 4 room BTO HDB flat that i just collected keys to. we are not planning to get an ID to save some money, and be our own main con & coordinate....i read on the forum that we should do hacking first, followed by cement screed and tiling. when that is finished, then do up the electrical and plumbing works?my boyfriend says that his friend told him that some electrical wires have to go under the floor (???) so we can't do up the flooring first...???we are both lost and not sure which method is right. thanks in advance!!! hope i will get some replies haha... Share this post Link to post Share on other sites
Johnson Lee 1 Report post Posted April 2, 2012 Hi, welcome to RT.As for your queries, it depends on your requirement needs such as whether u wan to shift any existing PowerPoint, telephone point or tv point or add a new point at those areas doesn't have any existing ones.If u intend to have those, u need to do hacking, then wiring before tiling. Hope this help. Share this post Link to post Share on other sites