polobear

Can Someone Advise On My Renovations Quotes?

Recommended Posts

(EXCLUSIVE PACKAGE FOR HDB BTO FLATS)

A (PROFESSIONAL SERVICES)

Space planning & conceptualizing

Furniture planning & products pre-consultation

Project management,site supervision & auditing

3D drawings for all carpentry works

3 years warranty with guarantee after sales service

B (MASONRY WORKS)

Construct 50MM height Kitchen cement mortar base with skirting

Construct 50MM height W/M & Fridge cement mortar base with full tiling

C (PLUMBING WORKS)

Supply & install inlet & outlet piping for Kitchen sink

Supply & install inlet & outlet piping for W/M

Supply labour to install Kitchen sink & tap

Supply labour to install 2 sets instant heater OR storage heater

Supply labour to install 2 sets Bathroom accessories

D (CEILING WORKS)

Design & construct L-box @ Living/Dining

Design & construct false ceiling @ Foyer area

E (CARPENTRY WORKS)

Design & fabricate 20ft (Top & Bottom)Kitchen cabinet using solid plywood with Laminate +

soft closing doors

Supply & install 10ft solid surface worktop

Supply & install designer handles

Supply & install 1 set frosted glass door

Supply & install 1 column of drawer with 1 set cutlerytray

Supply labour to install cooker hood & hob

Design & fabricate 5ft full height wardrobe @ M/Bedroom in Laminate

F (MISCELLANEOUS WORKS)

Painting of internal wall & ceiling using Nippoin paint (Max 4 colors)

Painting of all doors,frames,pipes & gate

Provide corrugated paper protection to flooring

Chemical washing for whole unit

General cleaning upon completion of works

SUB TOTAL AMOUNT FOR PACKAGE : $ 8,188.00

(ADDITIONAL WORKS)

G (HACKING & DISMANTLING WORKS)

(KITCHEN)

1 Supply labour to demolish away half height of entrance L-shape wall $ 550.00

(Subject to HDB approval)(Exclude PE endorsement if required by HDB)

(MASTER BEDROOM)

1 Supply labour to hack away ext'g metal door frame, remove door & hack away side wall $ 280.00

(Subject to HDB approval)(Exclude PE endorsement if required by HDB)

(BEDROOM 2)

1 Supply labour to hack away ext'g metal door frame & remove door $ 250.00

I (MASONRY WORKS)

(KITCHEN)

1 Supply labour & materials to touch up to affected wall tile areas using matching HDB

tiles $ 400.00

2 Supply labour & materials to construct additional 50MM height Kitchen cabinet base $ 200.00

(MASTER BEDROOM)

1 Supply labour & materials to render smooth to ext'g door frame areas $ 200.00

2 Supply labour & materials to construct timber door frame for new entrance $ 290.00

3 Supply labour & materialsto construct door lintol above new door frame $ 180.00

(BEDROOM 2)

1 Supply labour & materialsot seal up ext'g door entrance using 63MM hollow blocks $ 280.00

2 Supply labour & materials to cement plaster smooth to both sides of wall $ 200.00

(MASTER & COMMON BATHROOM)

1 Supply labour & materials to construct shower kerb c/w full tiling $ 280.00

H (PLASTERCEIL WORKS)

(LIVING AREA)

1 Design & construct plaster false ceiling $ 450.00

(DINING AREA)

1 Design & construct plaster false ceiling $ 550.00

2 Design & construct cove light holder $ 250.00

(PASSAGEWAY AREA)

1 Design & construct plaster false ceiling $ 280.00

(MASTER BEDROOM)

1 Design & construct plaster false ceiling $ 450.00

2 Design & construct cove light holder $ 350.00

(BEDROOM 2)

1 Design & construct plaster false ceiling $ 450.00

I (ELECTRICAL WORKS)

(LIVING)

1 Supply labour & materials to run 8 nos PLC downlight points $ 392.00

2 Supply labour & materials to relocate 1 no SCV point & 1 no 13AMP Double socket into

TV wall $ 250.00

3 Supply labour & materials to run 4 nos light point @ Platform area $ 196.00

(DINING)

1 Supply labour & materials to run 5 nos PLC downlight points $ 245.00

(MASTER BEDROOM)

1 Supply labour & materials to run 4 nos PLC downlight points $ 196.00

2 Supply labour & materials to run 6 nos Cove light points $ 294.00

3 Supply labour & materials to relocate 1 no SCV point & 1 no 13AMP Double socket into

TV wall $ 250.00

4 Supply labour & materials to run 3 nos light point @ Platform area $ 147.00

5 Supply labour & materials to run 2 nos light points @ Bedhead $ 98.00

(BEDROOM 2)

1 Supply labour & materials to run 4 nos PLC downlight points $ 196.00

(KITCHEN)

1 Supply labour & materials to relocate 1 no Lighting switch & 1 no 13AMP Double socket $ 250.00

(Entrance wall area after demoltion )

J (CARPENTRY WORKS)

(KITCHEN)

1 Design & fabricate additional 2ftL Kitchen cabinet (Package consist 20ftL) $ 240.00

2 Supply labour & materials to install additional 1ftL solid surface worktop $ 85.00

(Package consist 10ftL)

3 Design & fabricate 2ftL x F/H Storage cabinet using solid plywood in selected high grade

Laminate finished for built-in Oven & Microwave $ 720.00

4 Design & fabricate additional 3.5ftL Bottom Kitchen cabinet using solid plywood in selected

high grade Laminate finished $ 420.00

5 Supply labour & materials to install additional 3.5ftL solid surface worktop $ 298.00

(LIVING AREA)

1 Design & fabricate 7ftL x F/H Design TV feature wall using solid plywood in selected

high grade Laminate finished $ 1,960.00

2 Supply labour & materials to install mechanism for TV rotating $ 280.00

3 Design & fabricate 5ftL x L/H Design TV console using solid plywood in selected high

grade Laminate finished $ 850.00

4 Design & construct elevated Platform using solid plywood $ 1,400.00

(DINING AREA)

1 Design & fabricate 6ftL x L/H Dining sette using solid plywood in selected high grade

Laminate finished $ 1,020.00

2 Design & fabricate 6ftL x 2.5ftH cushion backing @ Sette $ 720.00

(MASTER BEDROOM)

1 Design & construct elevated Platform using solid plywood $ 1,100.00

2 Design & fabricate 7ftL x L/H Bedhead using solid plywood in selected high grade

Laminate finished $ 1,400.00

(BEDROOM 2)

1 Design & fabricate 11.5 ftL x F/H Walk-in wardrobe using solid plywood in selected high

grade Laminate finished for carcass c/w color polygrene internal finished(w/o doors) $ 2,415.00

2 Design & fabricate 10 ftL x F/H Walk-in wardrobe using solid plywood in selected high

grade Laminate finished for carcass c/w color polygrene internal finished(w/o doors) $ 2,100.00

3 Design & fabricate 2.5ftL x L/H wall mount suspended Dresser using solid plywood in

selected high grade Laminate finished $ 400.00

4 Design & fabricate 4ftL x L/H wall mount suspended Study console using solid plywood

in selected high grade Laminate finished $ 640.00

(MASTER & COMMON BATHROOM)

1 Design & fabricate 3ftL x L/H Storage cabinet using solid plywood in selected high grade

Laminate finished @ ext'g Vanity basin(Master Bathroom) $ 480.00

2 Design & fabricate 2.5ftL x L/H wall mount suspended Vainty cabinet using solid plywood

in selected high grade Laminate finished(Common Bathroom) $ 400.00

3 Supply labour & materials to install 2.5ftL solid surface worktop @ Vanity cabinet $ 225.00

K (GLASS WORKS)

(DINING)

1 Supply labour & materials to install 6ftL x 3.5ftH x 5MM thk Tinted wall mirror $ 420.00

(MASTER & COMMON BATHROOM)

1 Supply labour & materials to install F/H Mirror @ Basin area $ 480.00

2 Supply labour & materials to install 10MM thk clear Tempered glass swing door shower

screen @ Master Bathroom $ 650.00

3 Supply labour & materials to install 10MM thk clear Tempered glass sliding door shower

screen @ Common Bathroom (L-shape) $ 700.00

(KITCHEN)

1 Supply labour & materials to install 10MM thk clear Tempered glass fixed panel on entrance

half height wall $ 750.00

2 Supply labour &materials to install 10MM thk clear Tempered glass swing door

(1 swing + 1 fixed) $ 850.00

K (PLUMBING WORKS)

(COMMON BATHROOM)

1 Supply labour to install 1 no new design basin (basins supply by owner) $ 80.00

L (WINDOW WORKS)

1 Supply labour & materials to install aluminium sliding window @ Service Balcony

(BA/NA) $ 650.00

N (LAMINATE FLOORING)

(LIVING AREA)

1 Supply labour & materials to lay heavy duty HDF Laminate floorboard @ Platform area $ 880.00

(MASTER BEDROOM)

1 Supply labour & materials to lay heavy duty HDF Laminate floorboard @ Platform area $ 600.00

M (OTHER WORKS)

1 Debris disposal costs $ 2 50.00

2 HDB permit handling fess $ 150.00

GRAND TOTAL AMOUNT : $ 40,205.00

As i'm building a walk in wardrobe, (Design & fabricate 5ft full height wardrobe @ M/Bedroom in Laminate) will be removed. Is this quote reasonable for a 5 room flat?

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×