Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
Dominic

Quotation from ID ~ reasonable?

Recommended Posts

HI guys, recently been actively looking for ID or contractor for my resales 5rm flat. This is the recent quotation from one of the ID i approached. Can kindly help me to go thru to see whether is worth the value quoted? thousand thanks for your time and effort. =)

A. Foyer Living & Dining Room
1 Supply labour & material to install "L" box with cove light structure in painting finishing L.S 920.00 $


B. Kitchen
1 Supply labour & equipment to hack exisitng Kitchen top & bottom cabinet, sink and accesoriess L.S 450.00 $
2 Supply labour & equipment to hack existing kitchen fridge & washing base L.S 200.00 $
3 Supply labour & materials to construct 50mm ht, Cabinet, Fridge & washing Machine mortar base L.S 580.00 $
4 Design & Fabricate to install 20'L Kitchen top & bottom cabinet c/w soft close casement doors &
'- , frosted pull up glass door, dish rack and external laminate finishing L.S 2,400.00 $
5 Supply & Fabricate to install 10'L Quartz Surface work top on Kitchen bottom cabinet. L.S 1,100.00 $
6 Supply labour & material to dismantle all existing water pipe @ Kitchen L.S 180.00 $
7 Supply labour & material to install and rerun stainless steel expose pipe & drainage ( cold water only) L.S 450.00 $
8 Supply labour to install new washing sink & connecting with Kitchen water tap and drainage paip L.S 250.00 $
9 Supply labour to install new Kitchen hood & hod 01 set FOC


C.Common bathroom
1 Supply labour & equipment to hack exisitng WC , basin and accesoriess L.S 200.00 $
2 Supply labour & equipment to dismantle the existing water piping. L.S 180.00 $
3 Supply labour & material to overlay heavy duty ceramic wall tiles at existing Bathroom walls ( base
-on within $3.00 per sq ft tiles) (base on 8'ft height ) L.S 2,190.00 $
4 Supply labour & material to overlay heavy duty homogeneuos tiles at existing Bathroom floor ( base
-on within $3.00 per sq ft tiles) L.S 840.00 $
5 Supply labour & material to replace and install new expose stainless steel cold water pipe for
-whole bathroom. L.S 450.00 $
6 Supply labour & equipment to install new 01 nos W.C, 01 nos washing basin, 02 nos of taps
- & shower head L.S 320.00 $
7 Supply labour & equipment to install new 01 nos of instant heater. 01 nos 70.00 $
8 Supply labour & equipment to install simple bathroom accessories. (exclude rain shower) 01 set FOC
 

D.Master bedroom
1 Supply labour & material to install "L" box with cove light structure in painting finishing L.S 690.00 $
2 Design & fabricate to install approx 5'L x full height Tv feature wall in external laminate finishing 01 nos 1,060.00 $
3 Design & fabricate to install approx 3' dressing table and mirror cabinet in external laminate finishing 01 nos 950.00 $
4 Design & fabricate to install approx 7'L x full height wardrobe with casement doors , 3nos drawers ,
shelving, hanger, bars and external laminate finishing. 01 nos 1,820.00 $


E. Master bathroom
1 Supply labour & equipment to hack exisitng WC , basin and accesoriess L.S 200.00 $
2 Supply labour & equipment to dismantle the existing water piping. L.S 180.00 $
3 Supply labour & material to overlay heavy duty ceramic wall tiles at existing Bathroom walls ( base
-on within $3.00 per sq ft tiles) L.S 2,190.00 $
4 Supply labour & material to overlay heavy duty homogeneuos tiles at existing Bathroom floor ( base
-on within $3.00 per sq ft tiles) L.S 840.00 $
5 Supply labour & material to replace and install new expose stainless steel cold water pipe for
-whole bathroom. L.S 450.00 $
6 Supply labour & equipment to install new 01 nos W.C, 01 nos washing basin, 02 nos of taps
- & shower head L.S 320.00 $
7 Supply labour & equipment to install new 01 nos of instant heater. 01 nos 70.00 $
8 Supply labour & equipment to install simple bathroom accessories. (exclude rain shower) 01 set FOC

 

F. Master bathroom Qty Amount
I. General works scope and materials
1 Supply labour and Nippon emulsion paint for whole house walls & ceilings L.S 1,500.00 $
2 Supply labour and material to lay of Flooring Protection L.S 300.00 $
4 Supply labour to upload building material.  L.S 450.00 $
5 Supply labour & transport to disposal of debris to NEA designated dumping site L.S 300.00 $
6 General cleaning for the Whole Apartment before handing over of project L.S FOC

 

Total : $22100.00

Edited by Dominic
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request

Why not get a quotation from another ID house for comparison? If you're keen, I can share my ID's contact. I've nothing to say about him except all the good things. Just give him the same list & ask him to quote, then you can compare with your current quotation.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×