  1. dtft

    Simple Home

    yup. now have unpack everything. still have some minor works this friday to rectify all defects. till all defects done then will post pictures.
  2. dtft

    Simple Home

    Have shifted in last saturday. look at the mountian of bxes. 40 plus of them in the living room.
  3. dtft

    Simple Home

    Today went down again to check on progress, it was like a war zone. Electricians fixing the power sockets, lightings and fan, while the painters were painting the house, and the MBR shower screen was being fix by another group of people. My ID said he tried to finish by this thursday and i really hope for the best he can do it. Most of the carpentry will be installed this wed.
  4. dtft

    Simple Home

    yup smell very strong, see a while left liao. Everything should be up by tuesday (i hope).
  5. dtft

    Simple Home

    this afternoon went down to take a look. The bedrooms paquet floor been sand down and varnished. Painting still in progress. Hope to see most things to be up on monday.
  6. dtft

    Simple Home

    your eyes are good, the picture not so clear you also can see the design...
  7. dtft

    Simple Home

    which one you refer to , the grey with many circles or the glossy one with lines?
  8. dtft

    Simple Home

    1/4 pack...still got so many things
  9. your quote seems high. my 5rm spent last than $40k to reno.
  10. dtft

    Simple Home

    Just now went up to new house at 7 plus, very dark lights not installed yet. Using my hp torchlight able to figure that the bedrooms are painted, the marble flooring is polished. Oh, my main gate also changed. Hope tomorrow can see more progress.
  11. dtft

    Simple Home

    L box for living amd dinning done, MBR almost done.
  12. dtft

    Simple Home

    like that died liao... got sensitive nose measurement and construction all done, just waiting to install in house.
  13. dtft

    Simple Home

    tell him almost everyday, the answer always "can lah"... still got things not done yet: 12) main gate 13) polish marble flooring 14) sand and varnish palquet floor
  14. dtft

    Simple Home

    Today went down to check on the progess (going everyday), many items not done/completed yet. Now i have serious doubt that my reno can complete on 17 dec but i have to move in on 19 dec (feng shui). Things not done/completed yet: 1) painting 2) MBR L-box 3) both toilets shower screen 4) kitchen entrance sliding door 5) kitchen carpentry 6) service yard window and door 7) MBR toilet vainty top 8) MBR wardrobe, tv shelf, study table and divider 9) shoe rack cum divider 10) living room tv feature wall 11) all lightings haizz, the list so long. Really hope he can do magic and complete everything by 17 dec.
  15. dtft

    Simple Home

    yup, buy the shower set foc the storage heater. tiling takes around two week to complete.
  16. dtft

    Simple Home

    i am moving in on 20 dec, 17 dec will be the handover for my reno.
  17. dtft

    Simple Home

    thanks. still keeping my finger cross that everything will goes as plan and i can move in on 20 Dec.
  18. dtft

    Simple Home

    More than 2 weeks had past since the hacking began. All tiles work have been completed. Left mostly carpentry works and light box. Next week everthing should be completed. Partial finish common toilet. Left shower door and toilet accessories. Master toilet. Left shower door, vanity top and toilet accessories Kitchen. Left carpentry.
  19. dtft

    Simple Home

    yup. live with it loh. this is the picture taken during the cleanzing and start work ritual. today started hacking. took the picture just now. almost complete, left one doorway to open and the master toilet.
  20. dtft

    Simple Home

    Sad... just found out Royal Fano is selling at $860. Should have bought all my stuff from there.
  21. dtft

    Simple Home

    Today have discusion with ID. the below are the 3D pictures. the design is about there. hacking is going to on wednesday. estimated reno completion is 17 dec.
  22. dtft

    Simple Home

    Yeh, today have taken over the keys . Tomorrow will perform the ritual and wednesday will start hacking. Tomorrow will be a long day as morning will perform ritual and the afternoon will have the final discussion with ID and view the 3D design.
  23. dtft

    Simple Home

    Today went to Genova and spent $1271 on 2 baron WC, 2 basin, 2 tap, 1 rain shower set(foc AOS 15l storage heater) and 7 piece bath room accessories.
  24. dtft

    Simple Home

    Also went to Balestier Chan Huat to look for Crystal light, in the end bought from Lighting Centre at $168. It is made of swarovski crystal. Light off light on The package price was $967, the shop offered $898 and my wife bargained to $888. Huat ah...
  25. dtft

    Simple Home

    Yesterday went to shop for kitchen stuff. Went to Hoe Kee, Poh Joo and Royal Fanco. In the end bought the Turbo cooker and hob from Chuan Heng at $888. Turbo TA9688SG Hood Turbo 703 Hob
×