Hi all,
I recently bought an EM that is 150 sqm and will be doing extensive renovation. We bought this place because of the location and are really having a hard time balancing our finances. Appreciate your advice on whether the quotation I receive on the work I am doing is reasonable.
This ID company is more or less shortlisted but I am still waiting for other quotations to come in. It will be most helpful if you are able to tell me which sections might be over-quoted. Thanks in advance!
General Works:
Supply labour and material to:
1) Hack foyer, dining, utility and living room floor tiles - 500
2) Hack kitchen floor and wall tiles - 500
3) Hack common toilet floor and wall tiles - 200
4) Hack common toilet door frame and dismantle door - FOC
5) Hack balcony floor and wall tiles - 300
6) Hack glass sliding door and track at balcony - 100
7) Hack utility door frame and dismantle door - FOC
8) Hack staircase railing and finishes - 300
9) Hack 3 bedroom and passageway floor tiles - 500
10) Hack door frame and door at 3 bedrooms - FOC
11) Hack common and master bedroom floor and wall tiles - 700
12) Hack bedrooms wardrobe - 300
13) Hack cornices at lower and upper floor - 450
14) Hack wall between kitchen and dining area - 200
15) Hack wall between bedroom 2 and bedroom 3 - 200
16) Hack wall between bedroom 3 and common bathroom - 250
17) Hack kitchen cabinet and built-in cabinet - 300
18) Chemical washing and general cleaning work after renovation work - FOC
Masonry work:
Supply labour and material to:
1) Lay 600mmx600mm matt homogenous floor tiles at foyer, dining, utility and living room - 4650
2) Lay 600mmx600mm matt homogenous floor tiles at kitchen - 960
3) Construct cement base for kitchen cabinet and washing machine - 400
4) Lay 300mmx600mm matt wall tiles between top and bottom cabinet - 500
5) Cement screed other kitchen wall for painting finish - 500
6) Construct full ht hollow block wall at washing machine and island breakfast table - 500
7) Lay wall tiles at island solid table - 650
8) Lay floor tiles and full ht wall tiles at common toilet - 1900
9) Lay 300mmx600mm matt homogenous floor tile at balcony - 850
10) Cement screed balcony wall after hacking of wall tiles - 200
11) Cement screed staircase treads and risers - 800
12) Cement screed 3 bedrooms and passageway flooring - 500
13) Construct hollow block wall to seal up walk-in wardrobe - 680
14) Construct hollow block wall to one side of shower area at master bedroom - 500
15) Lay floor tiles and full ht wall tiles at master bathroom - 2200
16) Lay floor tiles and full ht wall tiles common bathroom - 2300
17) Lay laminate flooring at 3 bedroom and passageway - 2500
18) Supply and install stainless steel refute chute cover - 260
19) Water-proofing at toilets - FOC
Fibrous Work:
Supply labour and material to:
1) Plaster existing rockstone wall and ceiling - 2850
2) Construct L-box at island solid top table - 120
3) Construct full ht gypsum board partition beside living room storage cabinet - 120
4) Construct false ceiling at partial living room - 600
5) Construct full ht gypsum board partition at bedroom 2 walk-in wardrobe - 400
6) Construct false ceiling at part of master bedroom - 600
7) Seal up opening above door at utility and common toilet - 200
8) Seal up window opening above door at utility - 100
Painting work:
Supply labour and material to:
1) Paint whole house interior wall and ceiling with ICI or Nippon paint - 1780
Carpentry Work:
Supply labour and material to:
UTILITY
1) Design and fabricate full ht shoe cabinet in laminate finish - 1540
KITCHEN
1) Design and fabricate L-shaped top and bottom cabinet in laminate finish - 3050
2) Install L-shaped solid surface worktop - 1200
3) Design and fabricate solid top island table in laminate finish - 1100
DINING
1) Design and fabricate feature wall with mirror and in laminate finish - 1600
LIVING
1) Design and fabricate half ht TV feature wall with suspended ledge - 2700
2) Design and fabricate storage cabinet in laminate finish - 1920
3) Design and fabricate platform at balcony with laminate finish - FOC
MASTER BEDROOM
1) Design and fabricate L-shaped full ht walk-in wardrobe in laminate finish - 2560
2) Design and fabricate vanity cabinet with solid surface top and frameless mirror - 1150
3) Design and fabricate timber sliding door with full mirror on one side at walk-in wardrobe 850
4) Design and fabricate TV feature wall with ledge in laminate finish - 1500
5) Design and fabricate bed frame and headboard - 1140
6) Design and fabricate bedside table with drawers and corner full ht cabinet in laminate finish - 1680
Door and Glass Works:
Supply labour and material to:
1) Install aluminium framed acrylic bi-fold door at common toilet - 220
2) Install clear tempered glass partition at extended master bedroom (shower screen) - 1500
3) Install clear tempered glass sliding door at master bedroom - 800
4) Install clear tempered glass sliding door at bedroom 2 on upper floor - 480
5) Install clear tempered glass swing door at common bathroom - 220
6) Install timber sliding door at utility - 580
Window Works:
Supply labour and material to:
1) Install aluminium framed glass sliding window at kitchen - 390
2) Install aluminium framed glass top hung window at common bathroom - 110
3) Install aluminium framed glass sliding window at dining - 550
4) Install aluminium framed glass sliding window at balcony - 650
5) Install aluminium framed glass sliding window at extended master bedroom - 980
6) Install aluminium framed glass sliding window at bedroom 2 - 650
7) Install aluminium framed glass top hung window at common and master bedroom - 220
Plumbing Works:
Supply labour and material to:
1) Install cold water piping for whole unit - 840
2) Install hot water point for 2 bathroom shower and wash basin - 400
3) Install 3 nos. WC - 270
4) Install shower mixer, basin and mixer at common and master bathroom - 300
5) Install kitchen sink and connection of outlet - 140
6) Install washing machine inlet and outlet - 100
7) Install 1 no. of storage water heater - 100
Metal Works:
Supply labour and material to:
1) Install mild steel staircase railing in spray paint finish - 1100
Electrical Works:
Supply labour and material to:
1) Install new distribution board (DB) c/w circuit breaker - 300
2) Install new SCV points (4 nos.) - 380
3) Install single socket 13 A (2 nos.) - 90
4) Install double socket 13 A (18 nos.) - 990
5) Install 15 A heater point (1 no) - 95
6) Install 15 A air-con point (1 no) - 120
7) Install lighting point (23 nos.) - 805
8) Install 2-way lighting switch (4 nos.) - 220
9) Install telephone point (4 nos.) - 200
10) Install hob/hood point (1 no) - 60
11) Install door bell point (1 no) - 40
12) Install earth bonding point (1 nos) - 60
13) Install new ceiling mounted and PLC lights (25 nos) - 250
14) Install pendant light (2 nos.) - 100
Total: $68,980 (company to throw in 3-1 aircon after neg)
Thanks!