Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Dr.Evil

Members
  • Content Count

    70
  • Joined

  • Last visited

Everything posted by Dr.Evil

  1. i think we all have to respect each other decision. should one decided not to choose TAU interior, they should not be deem as an enemy of TAU forummer
  2. u dun have basic manners? wow..u register a new login to scold me...wonderful. do u dare to reveal ur ID?? Are u related to TAU? seriously, i din beg anything from TAU. i dun think i am a begger..i am just not that rich.
  3. which part of me u are not happy with me again? i am talking abt the kelvin from GPLAn..not from TAU. and i was refering to a tele-conversation 2 months ago. he said he would call me back..but till today there is no call. but neither i was waiting for his call. and i was saying...if Kelvin from TAU hasn't call back Stagger , then she shd call back. "all the top ID you have approach and not ever one is selected or happy with their service" - what is wrong with not happy with someone who said he will call but not? why is it wrong to be unhappy?? i am using my hardearned money to do renovation. its my hardearned 12 - 13K. it may seems little to u. what is wrong with ID bring u to showflat...but it is as good as its never. i had experience an ID who bring me to a showflat with kitchen cabinet built by the developer....when i am going to do a kitchen cabinet. will u be happy if u are me? "everyone got a budget is correct but you are too much for all your request.you" - excuse me...what have i demanded in the first place? have i demanded a 3D drawing before paying down payment? i never even demand TAU to treat me to a meal of lunch or dinner. have i ever demanded to do a palace with 12K? u din even listen to my side of story and start attacking me again....come on...are u a TAU in disguise? if so...just graciously admit. We won't mind having a TAU member answering queries.....Scolling back the previous pages..u seems to start attacking ppl who have the slightest negative comment. if i had no intention of doing renovation with TAU, i wouldn't have visited TAU for 3 times plus 1 time for showflat. if i had no intention of doing renovation with TAU, i wouldn't have visited TAU in tampines even though i live in the west. if i had no intention of doing renovation with TAU, i wouldn't have visited TAU thread. i think before u shoot people again...think. u might give ppl negative feeling abt TAU. so if u realli cared abt TAU...think before u shoot.
  4. me also punggol high floor...want to get rain shower...but i think..if u want rain shower...sure can...just use cold water lor. anyway...rainwater is cold one.
  5. like that u also hiam....the kelvin from GPLAN once i told him my budget is 12K to 13K....he say call me later...but till now...2 months already. haven call back. call him again lor.
  6. quotes and perspective drawings? u mean u already sign up?? haven sign up got no perspective drawing one leh.
  7. i went to tampiness DBSS to see.....but i din managed to see any kitchen cabinet as the place there...all kitchen cabinet is built by the developer. quite disappointed. only managed to see a TV console, feature wall and some L-BOX. haven meet kelvin in person...but i was told all TAU project is designed by him....dunno whether i should meet him person. i am scheduled to make a decision by sunday night..have a 13K or 16K decision to make.
  8. Ooh...it just a matter of having more choice...since i am going to spend my hardearned money...i shall find one that give me more value for money [this doesn't mean cheapest.....]. along the road, friends start to intro their contractor to me. so i guess...why not? i dun understand why u have to say things like "i dun think he will choose tau id anyway". Contrary to what u said, i will be visiting some house done by TAU and shall decide after my visit. I guess bro ZC and ilove6969 has already understand abt my concern...its abt the designer that i liased with. he is too quiet and he din give much suggestion to me. its so unlike of what u all mentioned abt winson or kelvin. i remember saying TAU quotation is the lowest. so please....stop accusing abt the pricing. okay? its about Going the Extra Mile...
  9. i think u have to look for the 3 ID that is recommended here...my ID is not the 3 of them....initial feel is that he didn't realli give alot of suggestion....very quiet. but i can't deny their service is not bad...they will want to go to your place to take measurement and then quote. which i think is good. go during lunch time...they will treat u lunch. so u will feel very comfortable with them. but thats initial feel.....by next week, i want to decide who i wanna use....TAU, Earnest, Summit Design or NUSPACE Design....or Ho Bee. will let u all know. No...none of the 3...i call him Tay...
  10. if i approach Kelvin now...will i hurt the person i have been talking with??
  11. i just bought Hitachi System 3 Inverter with Nano Titanium at $2699 + $180 [upgrade piping] + $450 [aircon servicing package]
  12. Dear ALL please do not take my post as discrediting TAU. as of now, i had not engaged TAU as i had not made my decision. therefore i am not in the best position to comment on TAU quality. cheers Dr Evil.
  13. highlighting mean i am replying to that statement u had made. but its okay. if its offending to you...i shall stop the highlight. sigh....once again, i would like to highlight that i did not go for the cheapest quote. i had drop 3 other cheapest quotation and had still stick with TAU even when their quotation is one of the highest. so please, to the few of the most active member in this thread...stop attacking ppl who have the slightest negative comment on TAU. Stop attacking from the MONEY perspective. Reason why i had not signed with Earnest is because i am still waiting for TAU to give me a better price even though Earnest has the higher quote compare to TAU. I am still waiting for TAU because ALL OF U said the quality and service is the best.
  14. just to clarify...i din mention about expensive. i just said that the quotation is very grey. alot of thing when we met they say can do....all included.....so i ask them to document it down in the quotation but in the end, not drafted in the quotation. dunno why. but anyway....i guess "To install L-Box and false ceiling **** and dining. (LUMPSUM) 1600" if without lighting point and lighting installation.....then i guess it shd be pretty overquoted. remember....i din ask for cheap. i ask for service [proper documentation] and design consultation.
  15. i don't think i am using any oxford english. TO SUPPLY LABOUR AND MATERIALS FOR MISCELLANEOUS WORKS Chemical wash and clear debris upon completion. $250.00 To lay protection sheet at affected area. $200.00 To install 8ft solid surface worktop for kitchen cabinet. $560.00 To install L-Box for main bedroom. $400.00 To install false ceiling at passage way leading to bedroom. $250.00 ADDITIONAL ITEMS Description Light point and install light. $45.00 EACH Fan point and install fan. $90.00 EACH Install ceiling, wall and cornice light.(ORIGINAL LOCATION ONLY) $10.00 EACH Install 13 AMP single socket. $50.00 EACH Install 13 AMP double socket. $70.00 EACH Install SCV point. $100.00EACH Install Dimmer. $40.00 EACH Install water heater point. $60.00 EACH Install PLC light point and light for false ceiling and L-Box. $40.00 EACH Install telephone point. $60.00 EACH
  16. yeah, i agree with u...thats why i have "kill" them off.
  17. i din go there to get the cheapest quotation......just that i am not very happy with the way i am being served. and the quotation is very grey. eg: To install L-Box and false ceiling **** and dining. (LUMPSUM) 1600 Light point and install light. $45.00 EACH so...does the Lbox lighting include in the $1600.00 or its charge seperately??? make me very tired. but i havent totally kill them off yet.. now its TAU Vs EARNEST
  18. u can look for Sham...Chinese muslim....quite nice and funky
×