Everything posted by wonderbeezz
-
Bathroom Accessories ~ Where To Buy
That's in UK? Do they do delivery to SG?
-
Odreamn - Dreaming On For The Perfect House
Yup, decided to change as due to the beam which separate the store and mbr. Cause above bed can't havbe beam, so need to do false ceiling, which will make the ceiling very "short". Hmmm... for ur planning, what else is missing? Most have settle already right?
-
Odreamn - Dreaming On For The Perfect House
Foyer area
-
Odreamn - Dreaming On For The Perfect House
Change in Kitchen entrance Common toilet shower area
-
Odreamn - Dreaming On For The Perfect House
Updates Separation wall in master bedroom toilet Going to be wardrobe area (Combine store room into master bedroom)
-
Odreamn - Dreaming On For The Perfect House
Thank! I hope so too!
-
Odreamn - Dreaming On For The Perfect House
Haha, thanks! So far so good for everything. How's your big planning coming up?
-
Odreamn - Dreaming On For The Perfect House
Haha, actually the windows are dark grey, not sure why it turn out green in the photo.
-
Odreamn - Dreaming On For The Perfect House
Close Up on Master Bedroom Toilet: Living Room Floor Tiles:
-
Odreamn - Dreaming On For The Perfect House
Tiling Process: Start Date: 18/11/09 End Date: Still in progress Experience: Good so far Comment: Tilers are very experience, tiling progress is rather fast, no hiccups so far. Kitchen Tiling: Master Bedroom Toilet: Tiling:
-
Odreamn - Dreaming On For The Perfect House
Hmmm, will take noted of the details, thanks for the advice! *Praying for a smooth renovation process too, so far so good, hope it continue. Thanks ya!
-
Odreamn - Dreaming On For The Perfect House
Installation of Windows: Start Date: 18/11/09 End Date: 18/11/09 Experience: Good Comment: Window installation was done up pretty nicely, the windows were aligned straight to the walls, resting well without any gaps.
-
Odreamn - Dreaming On For The Perfect House
Have not purchase any furniture yet as we have are waiting for the renovation to complete first.
-
Odreamn - Dreaming On For The Perfect House
We change the entrance of bedroom 2 and 3 to accommodate a bigger master bedroom cum study room: A view of the living room during the process:
-
Odreamn - Dreaming On For The Perfect House
We change the entrance of common toilet: Base for kitchen was build at the same time:
-
Odreamn - Dreaming On For The Perfect House
Building of Wall and Process: Started: 17/11/09 Ended: 19/11/09 Experience: Good Comment: Building of wall was rather quick and efficient. We change the entrance of master toilet:
-
Odreamn - Dreaming On For The Perfect House
TY, TY Actually we are in the mids of doing the reno, just finish the hacking process on 16 Nov, now in the tiling process Hmmm, u r referring to buying damage or reno damage?
-
Odreamn - Dreaming On For The Perfect House
- Odreamn - Dreaming On For The Perfect House
Hacking Process: Started: 13/11/09 Ended: 16/11/09 Overall Experience: Good Comment: Excellent work by experience working, as you can see from the picture, no excessive hacking on unnecessary part of wall and floor. All are well executed to remove only the tiles.- Odreamn - Dreaming On For The Perfect House
Master Toilet: Close up on the black tiles:- Odreamn - Dreaming On For The Perfect House
Common Toilet: Toilet Flooring:- Odreamn - Dreaming On For The Perfect House
Balcony: Kitchen Floor:- Odreamn - Dreaming On For The Perfect House
Tiles chosen: Foyer: Living Room: Super Gross- Odreamn - Dreaming On For The Perfect House
Propose Layout Design:- Odreamn - Dreaming On For The Perfect House
Current House Layout: - Odreamn - Dreaming On For The Perfect House