sgnick
-
Content Count
157 -
Joined
-
Last visited
Posts posted by sgnick
-
-
<!--quoteo(post=569980:date=Aug 31 2010, 05:14 PM:name=focus06)--><div class='quotetop'>QUOTE (focus06 @ Aug 31 2010, 05:14 PM) <a href="index.php?act=findpost&pid=569980"><{POST_SNAPBACK}></a></div><div class='quotemain'><!--quotec-->Hi can take a picture of your rack ? Or whats your rack dimension ? Yew Sin quote me $300 for a customized Lshape rack, PVC board. My storeroom is 204cm x 183cm. The depth of the rack is 60cm, height is 72" only.
So I am wondering did I get a lousy quote ?? <img src="http://www.renotalk.com/forum/public/style_emoticons/<#EMO_DIR#>/mad.gif" style="vertical-align:middle" emoid="" border="0" alt="mad.gif" />
Thanks alot<!--QuoteEnd--></div><!--QuoteEEnd-->
Hi, I bought this, but upgraded to 80" height (usual 72") and 5 levels of shelf (usual 4 levels).
<img src="http://www.yee-sin.cm/images/StandardRacksB.gif" border="0" class="linked-image" />
Here is a pic, sorry about the mess.
<img src="http://i17.photobucket.com/albums/b81/nick/Renovation/KSR.jpg" border="0" class="linked-image" />
-
I'm not sure if I can be so active to post the *renovation* process pic.sI took pics of my place before renovation and planning to take after renovation for remembrance.
BTW, did you stay in yr unit when you're doing renovation? You drop-in often to check on the progress?
Roughly how long does it takes for yours to complete?
Lyn
I stayed at my parent's flat 3 blocks away, so I checked the reno progress everyday
I moved in when the reno was almost completed, just left 2 glass items to be installed. Now the reno is completed.
My reno took 9 weeks.
-
Hi,I'm also starting my renov on 8 Sep with Room for Ideas and can't wait for the whole renovation to complete by 30 Oct.
Thanks for blogging your experiences with Willie & Vincent and it sure give me more confident to work with them.
I know about them thru' a colleague and they were recommended for great after sales service.
I'll start my blog soon once I settled down in my *temporary* place.
BTW, I like your whole renov it gives a very clean and neat look.
Lyn
Hi Lyn,
great to know there is another Room for Ideas customer. I was beginning to think I am only one here.
Can't wait to see your blog.
-
Installed storeroom rack, from Yew Sin
Custom sized L-shaped, 80" tall, 5 levels rack, PVC wrapped boards. $230.
-
hi sgnickcongrats to u for doing up such a nice house (theme wise and choice of material-wise too) and of course glad that u hv a good contractor which is a bonus. Care to pm me Room for Ideas ctc (Willie or Vincent's hp ) so that I may oso enjoy getting a good quotation from them if possible.
Cheers and wishing u a nice living in Hougang.
Thank you black shadow,
PM sent
-
Dear kind souls,can anyone pm me their contractor's contact? we are on tight budget and timeline cos my wife is pregnant, too many things happening the same time! thanks alot!!!
Hi, you can try my contractor if you want.
See my t-blog
http://www.renotalk.com/forum/index.php?showtopic=28769
PM me for contacts
-
Hi, you can try my contractor if you want.
See my t-blog
http://www.renotalk.com/forum/index.php?showtopic=28769
PM me for contacts
-
Hi, you can try my contractor if you want.
See my t-blog
http://www.renotalk.com/forum/index.php?showtopic=28769
PM me for contacts
-
You can try my contractor, look at my t-blog. PM me if you want the contact.
-
Moved in for 3 weeks already.
Kitchen sink a little bit leaking, informed Vincent and he immediately call for plumber to come down and fix it until swee swee.
The hydraulic hinge for my kitchen cabinet (to lift up the glass door) not working properly, Vincent got his carpenters to come and change entire set to another brand.
So far the warranty support and response have been prompt and very satisfactory, even after 100% payment was already done weeks ago. Still easily contactable and responsible. One more plus point for Vincent from "Room For Ideas".
-
Made final payment to willie/vincent.
Bought desk, coffee table, side table from Ikea.
Just ordered curtains from MGL, Day+Night full length for living room, Night 1/2 length for 4x bedrooms. Total $1300. Installation in 10 days time.
Now looking for dining table, but looking for cheap one.
-
Saturday 31 july: Sofa and mattresses arrived from Seahorse
Mitsubishi fridge from Goh Ah Bee delivered
Sunday 1 Aug: The big move, what a tiring day. Now living out of boxes at new place.
Found some water dripping from pipes below kitchen sink
Monday 2 Aug: Off to work from my new place. No leave today.
-
We are also moving this Sunday
-
thanks! wow, many are moving this week or so to be before the 7th month.Yep, it's either before 7th month, else will have to wait an entire month
-
Swee!! glass items will enhance the place or area lor...Ya, i prefer this to stainless steel or plastic box. To me looks better too.
Don't really like laminated wood fixtures in bathroom also, I always feel wood and water should never mix, regardless of what others say about being it being humidity proof.
-
Bro nice transformation of ur hse! ur toilet mirror box also quite unique... the sides are transparent glass?The entire thing is made of glass, outside and inside. You can get from Genova, there's a big discount, usual price $199.
-
nice!Thank you samgalz.
Your reno is looking great too. Seems like we will be moving in on the same week.
-
Master bedroom toilet
-
Master bedroom
Plastic on wardrobe not removed yet
-
-
Bedroom 1
<img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/BR1_1.jpg" border="0" class="linked-image" />
<img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/BR1_2.jpg" border="0" class="linked-image" />
Bedroom 2
<img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/BR2_1.jpg" border="0" class="linked-image" />
<img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/BR2_2.jpg" border="0" class="linked-image" />
-
Common toilet
<img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/CT1.jpg" border="0" class="linked-image" />
<img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/CT2.jpg" border="0" class="linked-image" />
Waiting for the toilet paper holder to be fixed
<img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/CT3.jpg" border="0" class="linked-image" />
-
<img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/K05.jpg" border="0" class="linked-image" />
<img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/K06.jpg" border="0" class="linked-image" />
Going out of the kitchen. Bifold door on left is to the storeroom.
<img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/K07.jpg" border="0" class="linked-image" />
-
Entering the kitchen. The storeroom entrance (bifold door) is on the right.
<img src="http://i17.photobucket.com/albums/b81/clicknick/Renovation/finishing/K01.jpg" border="0" class="linked-image" />
Hob and Hood
Waiting for them to fix the coloured glass backing onto the wall
<img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/K02.jpg" border="0" class="linked-image" />
<img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/K03.jpg" border="0" class="linked-image" />
<img src="http://i17.photobucket.com/albums/b81/nick/Renovation/finishing/K04.jpg" border="0" class="linked-image" />
Hougang 5i In June
in Reno t-Blog Chat - HDB Resale Renovation & Interior Design
Posted
Nice talking to you too.
Depends on what your do I guess. I hacked the entire house tiles and retile. Almost everyday (including weekends) someone is doing work, until the 7th week. By eighth week thing slow down a little. 9th week the finishing touch.