Patsy_sg - my "better half" - has already given some of her thoughts on CLC Interiors. After our recent experiences, I think its time I gave mine. We originally engaged them as 'glorified project managers/contractors' rather than interior designers. If we'd be looking for the latter we would never have hired them but they appeared to have enough of the former and a little of the latter to meet our requirements. Our plan has always been to do a lot of the work on the house ourselves and in so doing turn it into a proper home rather than the glorified showroom that so many interiors designers want to build. Their job was to get the whole process started and, if they proved themselves to be what their sales person claimed they were, we would use them over the next 12-18 months for other work we want to do. We asked them to: Undertake some demolition and basic construction work (e.g. put in partition walls) Design & build a kitchen Install wardrobes, a console and dressing table in the master bedtoom Completely re-do two bathrooms Polish/restore/stain our marble, parquet and wood floors Paint the house Patsy has talked about their failure to meet the original deadlines they gave us and described the state of the place when we moved in so, for the moment, let's start with the positives. The kitchen is pretty much exactly what we wanted The quality of the carpentry work is excellent throughout And..... That's it, unless you call the 'barely adequate' something to be happy about but. The decorating work is basically complete but only after the house had to be repainted twice because the first attempt was so laughably shoddy. The floors are finally approaching acceptability but again that's only after three attempts on their part and the fact that we lowered our standards in relation to the parquet work because we've decided to replace it later in the year. Everything else is sub-standard, amateurish and completely unacceptable. The easy option would be to be blame the quality of the workers/subcontractors employed by CLC Interiors and it is true that a number of these are incredibly poor. Their electrician, for example, managed to incorrectly install over 90% of the new plug and light sockets in the house and his solution to not being able to get a wall light to hang properly was to tie it to a beam in the roof (I'll post pictures of this together with other examples of their work). If he’d gone and looked in the next-door room he would have seen what was wrong as he’d already installed one properly there. That he didn’t was down to laziness and a lack of thought. Everything about his work said that he took the easy option no matter what. Probably the best illustration is his use of casing to ‘disguise’ the wiring in our dining room light. There are no problems with hiding the cables in the ceiling (we’ve had two independent experts review all of their work who’ve confirmed this). He just didn’t bother thinking about what the end product looked like and did the quickest, dirtiest and easiest thing he could. I do not hold individual contractors responsible for this. Instead it is a direct consequence of CLC Interior’s lack of professionalism and inability to perform even basic project management. Our experiences tell us that: The work required to complete each part of the project was never properly estimated by the CLC Interior project manager. Contractors were not properly briefed on the tasks they were then asked to complete. Their work was not being supervised or monitored properly (if at all). They tended to demonstrate little interest/pride in their work (which speaks of a lack of proper management or motivation). Once problems start to occur, client communication largely focuses on avoiding incurring additional costs to CLC Interiors to resolve problems created by their own incompetency. Our experiences with two other suppliers highlight the shortcomings in their project management. We hired a company to install electric gates. The day before installation was to take place, their project manager came to the house and looked at what work needed to be done. The next morning 3 workman arrived who had been clearly briefed about the job. The project manager arrived midmorning to see how things were going and then came back at the end of the day to evaluate the work that had been completed and let us know what needed to be done. A similar thing happened with the company we hired to do do some wood work on the house. The project was properly scoped, the people who worked on it clearly knew what they were doing and in addition to managing his staff the project manager also kept us regularly updated on what was going on. CLC Interiors did none of these things. Our problems with our bathrooms illustrate this perfectly. The shower fittings have not installed properly. Even though they had the fittings prior to the work being carried out, the project manager never gave them to the plumber. He also never bothered to inform him what tiles were being installed or got him to liase with the tiler to ensure they were working together. The plumber then never thought to find out any of this for himself and just started working. No checks were made on his work and then once the problem was identified CLC Interiors devoted their time to doing the quickest, dirtiest and cheapest ‘almost fix’ to a problem of their own making. The same thing happened when cracks started to appear around the door frames and the partitions they had put up. The first time they were notified of the problem their sales person tried to look ‘knowledgeably’ at the cracks and told me it was down to the ‘house moving’. His solution was to send someone down to literally ‘plaster over the cracks’. He wasn’t a plasterer. He was the electricians assistant. The cracks had re-appeared before he even left. The next person down stuck a whole load of silicon into the cracks around one door, paid no attention to how it looked and headed off without doing the others or telling anyone what he had done. I could go on and on but the basic issue is this. CLC Interiors did not deliver on what they were hired to do. They struggled to achieve the barely adequate on some tasks and failed miserably in others. Where things turned out ok, that was down to the professional pride of the individual sub-contractors and had nothing to do with CLC Interiors project manager or sales executive. In all instances their professional conduct remained the same; laughably amateurish. Only hire them if your standards are low. They'll meet them.