Everything posted by slyphy

  1. Not at tis moment but i think soonet or later it will...will juz have to clean it...hahaha....
  2. No FS related, we tot this will be easy to maintain coz leaving it white will soon become dirty and require painting in long run...
  3. Hi piknik, Thanks for the encouragement... Abt the stove, well i actually dun hv much choice coz i wanted to have a dry and wet concept due to heavy cooking by my mum in law. And wet area is small with only 2 area to choose so not much of a choice.
  4. Stairs Guest Toilets at level 1
  5. More pics for sharing.... TV Feature wall with HTS...noticed there're 2 hole on top. Well...the guys drill the wrng hole...i nearly fainted... now waiting fr ID to provide new design to cover up the hole...if not i will asked them to redo the whole solid top This is yet another hippcups My messy Kitchen...was so grateful to the carpenter for making us a temporary kitchen sink...this allows us to have our steamboat reunion dinner
  6. The above pics was taken before we shifted in...I will share on the photos which are more nicely done up later. Some major hippcups of our reno. 1. Granite condition was really bad. 50% of the black galaxy tiles were not shining, it was very matt finishing and blurr. My hubby was really upset over this as our main purposes of chooisig granite is bcoz we luv the shinning surface which give a classy look. ID proposed for compensation of 5K + polishing of whole house. Let's hope this will helps. 2. Kitchen layout need to change. The initial wet area where we wanted to place the stove need to be change as the carpenter advise that the current place is not enough & ideal for the stove area. so stove has to be placed beside kitchen windown and on top of the rubbish bin. I know based on FS, this is defintely not a good spot for stove but we have no choice Above 2 incidents already my me boiled! Well...still we need to move on... We had a meeting with our ID & the carpenter on Mon and finally settle on the kitchen layout and hence reno gona start this week. Today, the guys are here to do the touch up & polish the granite. I was thinking I can stay away from all this and leave it to my hubby while I go to work but unfortunately I falle sick haiz...ended at home taking medicine and yet cannot rest as it's too noisy
  7. Finally, we've shifted in but just as we were abt to settle down, kitchen reno, touch up started.... Here's some pic which I was supposed t upload earlier...will continue to share more photos with all. Living Room TV Console Study desk at my boy room MBR Headboard...half done... View from stairs Living Room...
  8. Hi, My quote is ard 110K and ID firm is S K Y C R E A T I O N. I will PM you my ID contact.
  9. All my electical appliances (including this fan) are purchased fr Kang Tai Electrical Store at Jurong West. I can PM you the contact if you need. It's cheaper to buy from here as compared to big store but of coz no extended warranty & only accept cash/nets payment. This fan cost $320.
  10. Hi Wilenez, I've pm'ed you the ctc
  11. Went up to see the progress last nite and took some more pics to share. Some progress of the TV Feature Wall...Finally the solid surface is up... Hidden Cable at storage room behind the tv feature wall.
  12. Hi Potatoes, Thanks for appreciating the design Yes, the flooring is parquet fr ex-owner. This is the only area that we remain as the parquet is still in good condition and ID say no need to waste $$$ changing. The cost fo the glass panel cost $5.8K, this is not completed yet as there will be wood at the railing handle area a we felt that it's safer for kids & elderly this way.
  13. Hi Polar...here's the pics showing the concealed cable...
  14. We are going to use a solid surface for wall mount our TV & HTS speaker. The solid surface is rather heavy & ID adv better to have concrete wall for better support instead of partition wall.
  15. Hi Polar...all the wired concealed...I will try to take pics and sow you if i can...I don't like to see wire hanging anywhere...i want it neat.
  16. I've pm'ed you the ctc detail....
  17. Hi Enhanzed, from my experience...first I engaged a ID..got my TV feature wall 3D ready...of coz u must let yr ID know u will be havng a HTS....then i started looking for HTS. During purchase, the HTS Salesman did ask me if I have any ID to design my hse, then he told me he can liaise direct with my ID. So I linked them up and they started meeting up and communicate. The HTS Salesman very experience, he even sketch out the design when we share with him our 3D drawing for the TV Feature wall. I juz tell them i want every cable to be hidden and the HTS salesman will propose his idea...once both my ID & me accepted...next my ID will arrange a meetup with the electrician & HTS Salesman to discuss on the detail of laying the cable and when/who need to start their job... So which system did u purchased?
  18. TV Feature Wall…in progress… Today...ID, Electrician & HTS guys gona meet up to finalize the detail of wall mounting the HTS, TV etc...
  19. Things that I bought… Coffee Table Korean Porcelain Bowls.. Chairs for Kids study desk….everyone says it doesn't seems approraite…but I dun mind or care….in fact I bought 3pcs in total…
  20. Main Gate...but they delivered the wrong color Got the sales uncle to bring back and change... Window Grill also up... Common Toilet Vanity Top...
  21. MBR... Headboard in progress TV Wall in progress
×