Everything posted by Nivle
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Just back from new house, after mopping whole house with wifey....95% complete(left some sockets and fan and dinning light installation... But good enuff to move in today 12th Oct 2012.... Start Reno 13th Aug 2012, so not too bad lah can complete in 2 months...Quite a big project and Thumbs up for Andrew and his team ...Wil buy them dinner soon will now show picture of house after reno n before furniture comes in(Except bed sets, already delivered Yesterday). But before that, some minor hiccups along the way... Feature wall up, but quite different from 3D....dun feel good as the pattern to me is like..red stuffs all going down, So told Andrew I dun like it.. 3d Bring back n redo Andrew decide to draw n send over for redo come back with this....Me n wifey happy
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Left a bit of touch up... Will load more picture just before shifting in...
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Thanks...
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
setting up 'Laundry hanging system'... if not going out, can go up. hang laundry 50% out All out..
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Day 55- Week 9 , Day 1. 915pm-935pm Still washing.. Penguins Metal Gate Shoe cabinet with doors Living room Downlights
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Thanks for visiting... Going over 9pm... Got lights already... Yeah yeah...take picture n share later
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Yup..like tepanyanki style ......i can cook n my guests sit around the island n eat
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Maximum another 2 days
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
all doors will be white
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Thanks for visiting... Just came back from site...Now got 3 head hand and 3 workers cheonging on my kids Wardrobe and study tables...
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
MBR progress... LED Ceiling Light small WIW LIVING HALL Shoe cabinet is here..
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Day 53 Week 8, Day 5 Kitchen cabinet and Island ready.... Princess love the kitchen backing pending...
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
First princess wardrobe arrives small little handle Her lights.. Study tables and shelving should be up over the weekend
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
same day, Plumber also start work... Common Bathroom/toilet Tap...kids love it Rain shower for common bathroom Digital shower, Pricesses chose .... MBR bathroom, glass panel done up , left our basin to be install last
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
DAY 50, Week 8 , Day 2 Arrival of carpentry Fall-in at Lift lobby. 2 of the guy carried this piece up to 11th storey cos cannot go in lift
- Our 安乐窝
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
quote name='LLChing' timestamp='1349250094' post='749832'] Completing reno soon? Anymore photos update? Yes.. pending carpentry work as follows: kitchen cabinets up, left backing and top. only 1 wardrobe complete.Pening 3 more wardrobes, 4 study tables cum shelving and MBR WIW.. Living room feature wall and shoe cabinet. store room 'magical' glass door Moving in date postpone for 3 days and all quite comfotable with the arrangement.. Will updates pictures tomorrow morning... Tomorrow will install all lightings and can go up at night already .
-
Any Renovation Ideal For Toa Payoh 3S Corner
Congrats...cheers
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Bedroom 2 Bedroom 3 Bedroom 4 Bedroom 5-electrolux n universal stuffs waiting for installation...
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
DAY 47, WEEK 7 completed Painting of whole house completed From main door Dinning area Living room and blue blue balcony Little walkway Kitchen
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
hi Hai, Thanks for visiting..
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
house warming no problem... gain city voucher preferred
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Before-see under the window, like a big hole After patching , think they have done a good job
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
Another little walkway Bedroom 2 for 2nd princess Bedroom 3 for 1st princess
-
Dream Home-5 Bedrooms Ea At Kk(Tpe)
MBR Entrance Feature wall on the left end. WIW Bathroom Air con drainage for 3 air cons(to be box up later)