Everything posted by HappyAng
-
Renovation Journey For Our Em @ B.batok
Fengshui tips on kitchen: Read from some books and also 高人指点.. Just to share., for your reference only. 1) Stove should not face kitchen entrance or main door as this represents loss of wealth and unstable luck. 2) Stove should not be facing the fridge or toilet door as this represent difficult to accumulating wealth, poor health and argument. 3) The flooring of the kitchen should be lower than the living room. From the kitchen to the living room, the steps must be higher as it symbolise 步步高升. 4) Shelving below stove (represent 火); (upper level) must be porcelain (represent 土); (lower level) follow by metal ware, represent 金
-
Renovation Journey For Our Em @ B.batok
After 9 days of renovation... Hole for ventilation (level one toilet) * Ignore the old bamboo hanger Entrance to our kitchen. Will be doing sliding door. Reconstruct back the utility room
-
Renovation Journey For Our Em @ B.batok
Called opennet today, realise that my place will only schedule to install around Apr to Jul 2013. The help desk staff advice me to lay the trunking and inform contractor to put a cable inside. So when the technician come install, they can make use of the cable to guide the fibre cable from entrance to our desire point w/o having extra trunking install. Just to share, hope it helps..
-
Renovation Journey For Our Em @ B.batok
Yes. Hanging poles parallel to the window outside level one toilet during raining day. Will post more photo when tiles are up..
-
Renovation Journey For Our Em @ B.batok
Think many EM level one toilet has no ventilation window.. Since we have a toilet bowl and shower point inside the toilet, ventilation is very important. When shower, hot steam cannot go out, or when doing big business, Wah... Power ah if without ventilation. But, we never do any window panel for the hole. Firstly, if u realise, the length (long the window) for hanging the bamboo pole for the laundry (if you dry indoor), is quite short. So the hole for ventilation also act as the access for the bamboo pole. Secondly, the opening is not too big, so no point do a window panel.
-
Renovation Journey For Our Em @ B.batok
After four days of hacking... We request to hack a hole for ventilation at level one toilet. View from master toilet. The two holes (think the worker hack abit too big liao) are to build shelving for toiletries. Have also demolished the wall between master and common (on the right side of the photo) to extend the area for our vanity. View from common toilet
-
Renovation Journey For Our Em @ B.batok
Bro KenLui,nice info. Thanx for sharing.
-
My First Reno Journey
Nice 3D drawing! Btw, do u have any door separate living room and balcony?
-
My First Reno Journey
U got a big vanity too.. Btw, what is the rectangular thing near the WIW? Target when can complete your renovation?
-
The Experience: Our First Home
Wow! That's fast! Gd!
-
A Single Mother's Dream Home
Wow! FatFatFamily, u manage to keep the existing marble flooring? U are very lucky.. Yes, please.. Wait for your nice photo of your living and balcony.
-
My First Reno Journey
Wow! Super big master bedroom! Do share more photos, ok? Thanx
-
The Experience: Our First Home
Nice subway tiles for the kitchen. So by end of this month can complete your renovation?
-
Renovation Journey For Our Em @ B.batok
Wow! Nice floor trap. Thanx bro! Will check it out if pass by there.. Enjoy your Sunday too.
-
Renovation Journey For Our Em @ B.batok
Sure. Will try to share good lobang here.
-
Renovation Journey For Our Em @ B.batok
Thanx bro in advance for the photo. Heritage @ Geylang Lor 44?
-
Renovation Journey For Our Em @ B.batok
Bro, any lobang for nice and cheap floor trap? I saw one can match with existing floor tiles, but quite ex. If your toilet using nice floor trap, can take photo to share and the cost too? Thanx
-
Renovation Journey For Our Em @ B.batok
Today went Poo Joo (389 / 391 Jalan Besar) with wifey to buy toilet sanitary ware and kitchen sink, hook and hob. Just to share with all bro and sis here. Sorry, forget to take photo of the items that we have purchased. 1) one piece toilet bowl (arino caprio) x 2 sets 2) one piece toilet bowl x 1 set for level one toilet (Special discount @ $198 nett) 3) hand spray with valves x 3 sets 4) basin with pop-up waste (all different design) x 3pcs (average about $120/pc) 5) mixer tap (all different design) x 3pcs (average about $88/pc) 6) Joven 35 litre storage heater x 1pc 7) Elmark instant heater x 1pc 8) Elkay sink (650 x 450 x height approx 220mm) @ $280 (Heard that Elkay is market leader for stainless steel sink) 9) tap for kitchen sink x 1pc 10) two way tap for level one toilet x 1pc 11) HOBZ (a local brand) hood and hob @ $590 with two years warranty. 12) Grohe rain shower x 1pc @ $380 Total damage: $3,575 * I have also purchased another two sets of Grohe shower set and mixer tap @ interior affairs. Total: $485.
-
A Single Mother's Dream Home
Hi FatFatFamily, very nice house and your nice water feature too. Btw, how big is your water feature and what is the damage? Looking at the photo, seems like you have having marble flooring? Can post some photo of your living and balcony? Thanx in advance..
-
Help! Em Reno
We just bought our hood and hob (local brand: HOBZ) from Poh Joo (389/391 Jalan Besar) @ $590 with two years warranty. U may want to check it out there.
-
Newly Bought Em
Hi jetlee724, congrats to your purchase of your EM & wish u a smooth renovation journey.
-
Before & After Em Hougang (Reno In Final Stages)
Bro, nice reno. Btw, can check with u, how high is your toilet after the false ceiling installed? Your piping is all conceal inside the false ceiling? Thanx in advance..
-
Renovation Journey For Our Em @ B.batok
Wah.. Valuation report increase price huh? 1 and 2 room, valuation fee $115 + gst $8.05 + admin fee $10. Total: $133.05 for soft copy 3 room and bigger, valuation fee $170 + gst $11.90 + admin fee $10. Total: $191.90 for soft copy Few months back, when I did my valuation report (soft copy) only $170.50 wor..about 12.5% increase??
-
Renovation Journey For Our Em @ B.batok
Yes! ID just SMS me, HDB has approved my demolition of wall. Thanx summersann. For my case, HDB approved all my permits within 1 week. Thanx Dorawang.
-
Renovation Journey For Our Em @ B.batok
We collect the keys on 03/01/13 and ID apply permit on the same day. Hacking of floor and wall tile approved on 07/01/13, now only pending on demolition of wall. HDB officer say will follow up with the engineer and hope to approve by Fri. If your completion on 05/02/13, think normal hacking should not take too long to approve. Unless u are doing some renovation which engineer needs more time to consider the safety or waterproofing issue.