Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

ryvian

Members
  • Content Count

    98
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by ryvian

  1. Hello all! All PM sent!
  2. Hello everyone, sorry for the delay in the PMs. Just sent PM to everyone who requested. Just had my housewarming yesterday!
  3. So far, this fridge serve us very well! We love it due to the compartment in the freezing compartment. In fact, I went to my neighbours house. Most of them also using this model!
  4. Hi Cokie, The lights are provided by my contractor, Steven. It's inclusive in the 25k package as well! Hehe.
  5. Hello! I just PM you!
  6. Hello everyone, Sorry for the late reply. Haven't been checking out here lately! I've PM everyone on the contact details! Let me know if I miss you out. Just take note: My contractor, Steven, did mentioned to me that he's cutting down on project due to upcoming Chinese New Year. Good luck everyone! XD
  7. All PM sent! Sorry was busy recently, I will try to repost the photos once I'm free!
  8. Hi highandlow & AhChee, The shop name is: Proelect Electric Sdn Bhd Address: No. 65 & 67, Jalan Rosmerah 2/2, Taman Johor Jaya, 81100 Johor Bahru Tel: +60 7-358 2318
  9. Hi, I had PM you already.
  10. Hi, We bought it at RMB1,299 before GST and shipping. This deebot's suction is strong however it's a little noisy. If you don't mind the noise, this is a good buy! We set it on timer when both of us are out at work! There's a promotion for 11/11 promotion for rmb999. This is a very good chance to buy!
  11. For those that took my contractor, Steven's contacts. Just to let you guys know that he had returned from his oversea trip. You can contact him already.
  12. Taobao Loots Part 2 Microwave Rack Dustbin Chair Standing Fan Router Dustbin Tissue Box Mirror Seatee Toilet Roll Holder Blue Bubble Toilet Bowl Brush Hanger Stand Laundry Basket
  13. Taobao Loots Part 1 We did quite abit of Taobao shopping. As my Mandarin is very bad. My wife is the one whom do the liaising with the seller, while I just add them to cart. Digital Peep Hole Camera + Door Bell Wording Figurine Carpet Cushion Cover Deebot Hanging Light Coaster Big Clock Tissue Box Magnets Multi Holder Cloth Water Holder Tray Automatic Dustbin Chopping Board Plastic Board
  14. Hi Alvisliew & lyn2015, I had PM both of you already.
  15. HI khairul, there's error in sending you a PM. Maybe you want to PM me first so I can reply you?
  16. I had not on the air-con to try that out yet. But the wall fan was installed there for a purpose. My wife is afraid that her make-up melt before she's ready. The wall fan is to keep her cool.
  17. The aircon is actually at the other side. I had the trunking link to my Bedroom 2 which then link to the toilet. Quite well hidden suggested by the aircon guy!
  18. Living room (Final) My living room is now equip with furnitures and curtain! Check it out!
  19. Master Bedroom Supply and install 1 set 2 side exposed sliding door wardrobe (aluminium frame) internal white PVC exterior laminate finishSupply and install 1 set full height dresser with top storage centre mirror and drawer set and 1 unit pull out storage (3 tiler) at bottom 1 side with internal white PVC exterior laminate finish and 1 side open shelves (3 ft)Supply and install false ceiling at wardrobe areaSupply and install L-shaped L-box (15 ft)Supply labour and material to box up recess area and reinstate skirting False Ceiling Box-up done. Lights, fan and ceiling up! This fan is specially for my wife when she's doing her make-up! Start of carpentry work! All done!
  20. Bedroom 3 (Guest Room) Supply and install 1 set sliding wardrobe (aluminium frame) internal white PVC exterior laminate finishFor this room, we did not do much except for venetian blinds and one wardrobe. Thus, I will make it short and sweet! Before anything is done! After paintwork and light. Finally
  21. Bedroom 2 (Study Room) Supply and install 1 set study table internal white PVC exterior laminate finish cum with soft close drawer track, hinges and door abs edging (13 ft) (table top width not more than 600mm) with tabletop wire management compartmentSupply and install top hung cabinet above study table in laminate finish (8.5 ft)Supply and install spray paint glass for in between study table (20 sq) - PURE WHITET5 lights x2 This is how it look like when we first step into the house. Lighting and paintwork done! Carpenter at work! Carpentry is up! Except for the wire management. Pure white back glass! We specially requested for pure white back glass than normal back glass. And finally, with our venetian blinds!
  22. Living Room Part 2 Our shoerack with storage seatee under construction. Our shoerack is done! Very happy with the end product! Next will be our featured wall with console! We felt that the mirror look too plain thus we decided to get Steven to add a frame around the mirror. I really like the mirror with the black frame! This DIY clock is bought from Taobao! No drilling required! More photos! End product with my 65" television!
  23. Living Room Part 1 Wiring work in progress. False Ceiling in progress. I got Steven to to construct curtain pelmet. So that I can hide my curtain pole. We had install this 6x4ft mirror at our dinning area And very soon, the lights are up and first coat of paint is done! The downlights are provided by Steven. We don't have to go around to hunt for downlights. This is how it looked like at night! Our ceiling fan that we bought from JB is installed! I simply love it! As for the dining lights, We got it from Taobao. The dining lights cost me about S$60+.
×