![](https://www.renotalk.com/forum/uploads/set_resources_4/84c1e40ea0e759e3f1505eb1788ddf3c_pattern.png)
![](https://www.renotalk.com/forum/uploads/set_resources_4/84c1e40ea0e759e3f1505eb1788ddf3c_default_photo.png)
jimmya
-
Content Count
215 -
Joined
-
Last visited
-
Days Won
1
Posts posted by jimmya
-
-
hi zel,
tried to pm u but cant.
-
hi zel,
tried to pm u but cannot think ur mailbox is full..
-
hi warthog n jasyt,
pm u already.
all d best for ur reno searching!
-
living,kitchen n berdrrom.
finally uploaded my house haha.......
-
hi finally, got my drawings.....
very simple - living room
-
hi pDark,
thanks for ur directions!
finally know how to upload photos...
thanks
-
hi desmond,
thanks for asking. But i feel comfortable with my contractor and have proceeded with him.
thanks
-
hi,
anyone knows how to post pictures here, i cant seem to post?
i just got my 3d drawings yesterday..
hope for some feedback.
thanks
-
hi,
pm to minonzee, diyajak.
all d best
-
hi danielvkim, lidyan, nasus19,
pm u already. no need to mention my name coz we are all sharing contacts, we dont give
anything. we all just want the best for our house.
all d best!
-
hi hk123,
pm u already.
cheers. -
Hi ,
Pm u already little pig, sea hew , purple earth.
Take care
All d best !
-
1
-
-
hi ,
think d price ok, plus minus 1-2k...at least not those people 29k,32k....
but kitchen top 24ft so long? use quartz its better....scratch n heatproof...wardrobe can go for sliding too.....
kitchen cabinet better to use blum hinges, my friends one, already spoil after 1 year.
any free gifts haha? my contractor comes with hood, hob, toilet accessoiries total to $5k.
check with him la. as long as u are comfortable n happy, ok liao.
take care....
-
hi,
pm u allienate, philippian.
all d best!
-
hi tazan, sgx
pm already.
take care
have a good time
-
hi forkel, joanna, honda, cyanfy, eric
have pm u.
take care
-
hi warrgogo,
yeah my id is giving me quartz below market price. market should be around $130-$160.
i have checked with him already.solid surface is $80. granite is $100.
everything is in black n white and i have been to their office twice and always a lot of
customers and spacious therefore i feel confidence. 15yrs company.
workmanship quite good and 5 years warranty unlike others who are giving 1 ,2 yrs ony.
thanks for ur advice too.
luckily for all members in forum who also help me know the market rate.
thanks ya.
-
hi tarzanboy,
i tried to pm u the contacts but it cannot go through.
it says u cant receive any more messages.
fyi.
cheers
-
hi pdark,
thanks for ur advice. so far workmanship quite good. they have their own carpenters
thats y prices a bit cheaper i guess.. n they give 5 years warranty.which a lot of id only give 1 or 2 years only.
thanks anyway
-
Hi vicki,
Pm u already cheers
-
hi pdark,
thanks for ur advice. so far i have check its still ok.
their coy is hdb registered reno contractor unlike alot of id firms who are not. they just sub out to ppl.
they have their own carpenters as well. maybe thats bcoz their price is on low side. i think coy is
around 15yrs so i think harder to run away or do a bad job for me.
the person is friendly n truthful to me on the things that i want. in fact he ask me to save costs rather than
other ids who says do this do that. so far i feel quite comfortable with him.
thanks man!
-
Hi all,
I received this from my ID, is it reasonable? So far this is the lowest that i had got from 5 IDs.
Do advice.
Thanks
Construct 50mm kitchen base 11.5ft - $420Construct fridge base - $150
Construct washing machine base - $150
Supply cement, material n labour to lay 600x600 Homogeneous tiles for living room - $3360
Supply cement, material n labour to lay 600x600 Homogeneous tiles for master bedroom room - $1800
Supply cement, material n labour to lay 600x600 Homogeneous tiles for bedroom 2 - $1180
Supply cement, material n labour to lay 600x600 Homogeneous tiles for bedroom 3 - $1100
Supply labour to install 1 gallon heater - $120
Supply labour to install kitchen sink & tap on existing point - $100
Supply labour & material to lay 2” conceal drainage PVC for kitchen sink and washing - F.O.C.
Design, Fabricate & Install est(11.5ft) Kitchen top cabinet in solid-ply finish with high grade EDL/LAMITAK laminate - $1495
Design, Fabricate & Install est(11.5ft) Kitchen top cabinet in solid-ply finish with high grade EDL/LAMITAK laminate - $1495
c/w Blum Hinges
c/w Color polygon
- all doors in ABS Trimming
- 1 set of hydraulic hinge gas spring
- 1 set of sand blast glass panel
- 1 set of cultery tray
- 1 nos.of 2 tier dish drainer
- labour to install cooker hood & hob - F.O.C
Design, Fabricate & Install 8ft tv console - $1040
Design, Fabricate & Install 8ft Feature wall - $1600
Design, Fabricate & Install Full Height Shoe Cabinet - $850Design, Fabricate & Install Full Height Sliding Wardrobe est 6ft - $1560
Supply Labor & Materials to construct LBOX **** area - $1120
Custom made & install 11.5ft Quartz - $1265
Fabricate & install Glass Casement door at kitchen Entrance - $550
Fabricate & Install Shower Screen casement door at master bathroom - $500
Fabricate & Install Shower Screen sliding door at common bathroom - $550
Painting of whole unit using Nippon Original Paint using 5 nos. Colors - $1250
- all internal wall with Nippon Vinilex 5000 paint
- ceiling using Nippon Maxtex white color paint
Corrugate Paper for Protecting Existing Flooring - $180
Whole house general cleaning - $200
Chemical Washing - $200
Total $22235.
Do advice and help me out.
thanks-
1
-
Is This Quote Cheap And Reasonable?
in Renovation Packages
Posted
Hi ericgan10,
Yes my is bto at punggol opal.
Err.. I dunno know big enough or not but most
Bto master should be able to even though if it's squeezy.. U check with him.