  1. Ya, we added in some stuff and changed some of the things. That's why when the 2nd quotation came in, i was surprised how come so much. =X
  2. There's 2 contracts. The first one is the package + additional items 1 to 10. I have signed that already. The second one (the rest of the items) I havent signed yet because I want to negotiate with my ID.
  3. Hi all, thanks for your replies! The problem is, the ID has almost completed the renovation works and now we are pending for the touching up. He showed us this quotation and I was quite surprised at the amount. That's why I needed help because I do not know how this market works. And also, we are not really happy with the finishing with the painting (visible wrinkles on the walls). They promised to plaster and paint the ceilings and walls of the whole house but the storeroom is left untouched and many areas aren't smooth at all. We had alot of problems with this ID. So I assume the EW is around 2k? because the ID told us the electrician pulled alot of colourful long wires directly to the appliances, that's why we are paying this much for this quality of work. Additional item 13 and 14 is because initially we wanted to build one cabinet but in the end we decided to hack it off, that's why it is charged. He promised to hand over the keys to us at end of october. and because of alot of problems, it has been delayed for close to a month, causing us to rent a room to stay outside !!-.- Can anyone teach me how to "bargain"?
  4. Hi all, I need advice regarding the quotation given to me by my designer. I feel he's charging me at a high price. Can someone look through and let me know? *URGENT* Many thanks. PACKAGE PRICE $14688 1) supply & lay ceramic design tiles to kitchen wall 2) supply & lay non slip homogeneous tiles to kitchen floor 3) supply & lay design ceramic tiles to Master Bathroom wall 4) supply & lay design ceramic tiles to Common Bathroom wall 5) supply & lay non slip homogeneous tiles to Master Bathroom floor 6) supply & lay non slip homogeneous tiles to Common Bathroom floor 7) apply water proofing chemical to kitchen and both bathroom floors 8) supply & construct 50mm kitchen cabinet base 9) supply & construct 50mm refrigerator base 10) supply & construct 50mm washing machine base 11) supply & run copper piping to kitchen & both bathrooms (single way) 12) supply & install WC suite to both bathrooms 13) supply & install wash basin to both bathrooms 14) supply labour to install kitcehn sink 15) supply labour to install bathroom accessories to both bathrooms 16) supply & lay new outlet pipe for kitchen sink 17) supply & lay new outlet pipe for washing machine 18) supply labour to install instant heater x 2 (provided by owner) 19) supply labour to hack off kitchen wall & floor tiles 20) supply labour to hack off both bathroom wall and floor tiles 21) fabricate & install aluminium bilfolding door with colour acrylic for Master Bathroom 22) fabricate & install aluminium bilfolding door with colour acrylic for Common Bathroom including top hung fixed panel with aluminium frame & acrylic panel. 23) supply & lay protection covering to whole house floor finish 24) provide chemical washing to whole house flooring 25) supply & install classic door - 3 sets Change to solid nyatoh door - sets 26) To supply new doorframes for 2 bedrooms & 1 storeroom 27) To supply labor construct the doorframe 28) S/s rubbish chute at kitchen including labour to install ** PACKAGE SPECIAL to install 20ft top and bottom kitchen cabinet in solid ply laminate fin $1000 to install 10ft solid surface top with backsplash for kitchen worktop FOC -------------------------------------------END OF PACKAGE PRICING--------------------------------------------- ADDITIONAL ITEMS 1) supply labour to hack off Living & 2 bedrooms floor tiles $950.00 2) supply & lay 60x60 china granite with teakwood skirting to Living & 2 bedrooms $4,102.00 3) dismantle & dispose of existing kitchen cabinet $200.00 4a) supply & paint whole house wall & ceiling using ICI / Nippon emulsion paint $800.00 4b) supply & paint all doors, frame, piping & gate using gloss paint $100.00 5) supply & install solid nyatoh swing door with lockset for main entrance $600.00 6) to do smooth plastering to ceiling and wall for whole house $1,400.00 7) supply & install aluminium main gate with bronze materials $420.00 8) to apply sealer paint to all wall and ceiling - whole house $100.00 9a) to supply & install design light holder **** $580.00 9b) to construct false ceiling at passageway to kitchen $150.00 10) To construct low wall with tiles finish at kitchen washing machine area $380.00 11) To construct 3ft(L) kitchen cabinet base for full height cabinet $50.00 12) To hack off kitchen cabinet base $80.00 13) hack off existing floor tiles 3pc & 5pc of wall tiles & supply new floor & wall tiles at kitchen $150.00 14) Supply tiles & materials to lay back floor & wall tiles(including transport fee) $30.00 15) To construct arch at bedroom corridor & kitchen entrance(4nos) $60 16) To supply & install new doorframe at main entrance $130.00 17) supply & install aluminum sliding window at kitchen & master bedroom only(43sqft) $620.00 18) Supply & install louver window at two toilets $300.00 19) To supply & install aluminum sliding window griller for whole house(96sqft) $620.00 20) Supply & install aluminum cloth hanging at kitchen ceiling(1set) $40.00 2.1) supply 1box(20sqft) of living hall floor til,1box of kitchen wall tile(20sqft) & floor tiles(12sqft) including delivery fee FOC 22) Supply & lay floor tiles at staircase low wall & pebbles crystal stone at 2step staircase at main entrance. FOC 23) To apply one coating sealer & painting partition at two bedrooms $60 24) Fabricate & install top hung cabinet in laminate finish & "ABS" trimming for all door(Add 5.5ft-L) $550 25) Fabricate & install bottom cabinet in laminate finish & "ABS" trimming for all door(Add 4ft-L) $440 26) Fabricate & install full height cabinet in laminate finish & "ABS" trimming for al door to cover drainage pipe at kitchen(1.5ft-L) $330 27) Supply & install solid work top for bottom kitchen cabinet.(Add 4.5ft-L) $360 28) Supply labor to install hood at kitchen $60 29) Fabricate & install wooden shelve at store room wall 2pc $60 TOTAL AMOUNT = $15369.60 TOTAL COST AFTER DISCOUNT= $13392 -----------------------------END OF ADDITIONAL ITEMS COST------------------------------------------------------- ELECTRICAL SERVICES 15 lighting points $570 3 telephone points $180 2 heater points $180 1 doorbell point FOC 3 SCV points $330 1 SCV splitter $90 5 13amp power socket single $250 11 13amp power socket double $715 1 15amp power socket $100 1 new DB c/w ELCB&MCB $280 1 earth bonding $60 15 installation of light $120 1 installation of doorbell FOC 1 3 core cable to hob/hood $45 1 reposition of extg. power point (L/sum) $80 TOTAL AMOUNT = $3000 TOTAL AMOUNT DISCOUNT = $2550 TOTAL AMOUNT FOR RENOVATION FOR A 3 RM FLAT = $31,010.00
  5. Hi, My contractor quote me: Lighting point - $38 Telephone point - $60 Heater point - $90 Doorbell point - FOC SCV point - $110 SCV splitter - $90 13amp single - $50 13amp double - $60 15amp - $100 new db c/w ELCB & MCB - $280 earth bonding - $60 Installation ofl ight - $8 Installation of doorbell - FOC 3 core cable to hob/Hood - $45 Reposition of extg. power oint (l/sum) - $80 Is this expensive? It costs me 3k for a 3 room flat..
×