Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Hanna

Members
  • Content Count

    115
  • Joined

  • Last visited

Everything posted by Hanna

  1. Those who dm me asking for my blinds cost (I’ve no idea how to attach photo through dm). Here you go: Price quoted for half height windows. Installation looking at 27th-28th march.
  2. Hi KFC1189, Only the common rooms and study will have built in shelves for my kids books/ plush toys. I dont intend to do for living as my current house do have one but I don’t keep anything inside, so it’s not practical. Will just dump suitcases in the storeroom, 2tier shelves.
  3. Hi michmichtooo, yes its cheaper there esp fans. 1st trip, i bought: 25 LED downlights. 1 x Elmark fan with light (study room). Saw this in sg for $300plus. Got in jb 300plus too but in RM. 1 x ceiling light with 4colour light (kitchen) 3 x ceiling light (bedrooms) 3 x small ceiling light (toilet and store room) total cost about RM1200 2nd trip: grey Elmark 52” ceiling fan with 4blades, 3colours light RM999 (living room). Saw a shop in balestier selling for about $800. 16ft T5s 2small LED downlights
  4. Kichen wall: Today I got my windows measured for: venetian blinds - living and study. combi blinds - 3bedrooms.
  5. Hi javier, You mean how i bought those tiles? My contractor has an account with them. So we walked in and looked for the salesperson he recommended to assist us. I think contractor/ id have special discount from them.
  6. We’ve decided to keep the doors, have it paint in white and change to lever handle. living room: false wall to hide the wiring for tv area study room, we’ll put up 4panels sliding door
  7. Kitchen update: Not much work was done since friday kitchen floor - Matt grey. Great for someone who cooks everyday I keep reminding the contractor whatever delay (hopefully no hiccup along the way) there is, the bedrooms and living must be ready on time, so I’ll have space to store my stuff/ furnitures from current house.
  8. March 11th: Common room 1 - 6ft wardrobe Master room - 10ft wardrobe Common room 2 - 6ft wardrobe
  9. We came back again today at 630pm to check on the progress but unable to snap clearer photo as electricity were turn off. Both toilets tiling work complete ✔️ Kitchen floor complete ✔️ One side of the kitchen cabinet base has been constructed. Did a quick measurement and all are according to drawing’s. Am using homogenous tiles.
  10. Master toilet: This was taken last night. We requested to box up the piping and construct one concrete shelf
  11. Master toilet homogeneous tiles will be up tomorrow From this: ..to this- last minute changes:
  12. Sliding door bedroom wardrobe (2x6ft, 1x10ft) and Kitchen. No 3d drawing
  13. All ID exceeded our budget. 3contractors shortlisted. Arranged for meet up at my house. Why I picked contractors over IDs? Significant savings. All 3contractors quoted me about the same price. ...After adding in items last minute (boxing up pipes/ walls, etc), I raised my budget up alittle bit... .. And alot of touching up as this house was covered with wallpapers. Never buy a house with wallpapers, you might never know what they’re hiding behind it. Holes! Cracks!
  14. Electrical works done ✔️ Hacking all done ✔️ Cement screed/ plaster wall done ✔️ Box up toilet piping and hollow walls done ✔️
  15. Photos of last week hacking works in progression. Took just 3days to complete.
  16. Tampoi Lighting Centre: Bought —> 25 LED downlights 1 x fan with light (study room) 1 x ceiling light with 4 colour light (kitchen) 3 x ceiling light (bedrooms) 3 x small ceiling light (toilet and store room) will be going again to grab this grey Elmark 52” ceiling light for living room and T5s.
  17. I have actually started with my renovation works. Should be ready (MUST BE READY) by 27th march or I will have nowhere to stay! I need to hand over keys to new owner of my current house by 28march. Yes, we requested for extention of stay since we were the contra party.
×