Hi guys!
First time renovating our first home, so just to be more cautious, could any of you spend some time to take a look at our quote? Are tiling work and carpentry reasonable(eg item 6 and 10)?
Thank you!!
S/N
Work Description
Qty Units
LIVING AND DINING AREA
1
Supply Labour and Materials Laying of Homogeneous Tiles ($3.20 per sqf.)
255.0 sqf
2,601.00
2
Supply Labour and Materials to Install Baseboard or Skirting (Homogeneous Tiles)
47.5 ft
242.30
3
Settee
5.5 ft
748.00
4
- Settee with internal Color PVC
5.5 ft
140.30
5
- Settee with hydraulics hinge (pair)
3.0 lot
114.80
6
TV Console in Laminates
8.5 ft
1,192.20
7
- TV Console with internal Color PVC
8.5 ft
216.80
8
- TV Console comes w/ glass door <600mm width
2.0 lot
153.00
9
- Soft Closing Door Hinge (BLUM)
8.0 lot
54.40
10
TV FW Cab <8ft ht
8.0 ft
2,169.20
11
- TV FW Cab <8ft ht special design
8.0 ft
693.60
12
- Soft Closing Door Hinge (BLUM)
18.0 lot
122.40
13
- <8ft ht c/w Coloured Pvc
8.0 ft
442.00
14
Shoe Cab <8ft ht
4.0 ft
918.00
15
- Open Box in laminated finish
4.0 ft
306.00
16
- C/w Soft Closing Hinges (Blum)
8.0 lot
54.40
17
- <8ft ht C/w Coloured Pvc
4.0 ft
221.00
18
Sliding Window (Silver/Bronze) 4ft
11.5 ft
615.90
19
Casement Window 4ft (Silver / Bronze)
11.5 ft
664.70
KITCHEN
-
20
Supply Labour and Materials Laying of Homogeneous Tiles ($3.20 per sqf.)
180.5 sqf
1,841.10
21
- Overlay w/ Water Proofing Membrane
1.0 lot
306.00
22
Kitchen Bottom Cabinet <4ft ht
19.5 ft
2,734.90
23
- Kitchen Bottom Cabinet C/w Coloured PVC
19.5 ft
497.30
24
- Kitchen Bottom Cabinet c/w Cement Plinth
19.5 ft
497.30
25
- Kitchen Bottom Cabinet C/w Blum Soft Closers Drawer H560 30kg
4.0 lot
285.60
26
- Kitchen Bottom Cabinet c/w Blum Soft Closers
26.0 lot
176.80
27
Fabricate & install quartz (iQuartz - I series) <600mm
19.5 ft
2,138.20
28
Kitchen Cabinet Tall Unit (8ft High)
5.5 ft
2,173.90
29
- Kitchen Cabinet Tall Unit c/w Cementh Plinth
5.5 ft
163.70
30
- Kitchen Cabinet Tall Unit c/w Blum Soft Closer
14.0 lot
95.20
31
- C/w Colored PVC
5.5 ft
303.90
32
Supply labour to install kitchen sink
1.0 lot
137.70
33
Kitchen Top Hung Cabinet < 4ft ht
13.5 ft
1,893.40
34
- Soft Closing Door Hinge (BLUM)
14.0 lot
95.20
35
- C/w Coloured PVC
13.5 ft
344.30
36
- Blum HK Mechanism for Dish Rack Cover
1.0 lot
180.20
37
Glass Backing - Tempered 2.5 ft height
10.5 ft
553.40
38
- Cut-out access/ switch holes for glass
2.0 lot
103.70
39
Sliding Door Feature Wall
1.0 lot
833.00
40
Casement Window 4ft (Silver / Bronze)
4.5 ft
260.10
MASTERS BEDROOM
-
41
Supply Labour and Materials to Install Vinyl Only Flooring (Clip On)
109.3 sqf
826.50
42
Supply Labour and Materials to lay cement screed (w/o tiles)
109.3 sqf
835.80
43
Demolish existing wall (HDB)
3.0 ft
173.40
44
- Make good (Major) (HDB)
1.0 lot
382.50
45
Sliding Door Feature Wall
1.0 lot
833.00
46
Supply Labour and Materials to Install Baseboard or Skirting (MDF)
39.5 ft
201.50
47
Display Shelves in Laminates (<300mm Depth)
10.0 ft
510.00
48
Casement Window 4ft (Silver / Bronze)
8.0 ft
462.40
49
Sliding Grilles (Silver/Bronze) 4ft
8.0 ft
190.40
BEDROOM 2
-
50
Install CHB
11.0 ft
1,496.00
51
Demolish existing wall (HDB)
11.5 ft
664.70
52
- Make good (Major) (HDB)
3.0 lot
1,147.50
53
Supply Labour and Materials to lay cement screed (w/o tiles)
156.8 sqf
1,199.20
54
Supply Labour and Materials to Install Vinyl Only Flooring (Clip On)
170.0 sqf
1,286.10
55
Veneer Ply Casement Door (lever lock)
1.0 lot
387.60
56
- Solid Timber Door with Frame
1.0 lot
165.80
57
Casement Cabinet 8 ft ht
7.5 ft
1,823.30
58
Supply Labour and Materials to Install Baseboard or Skirting (MDF)
48.0 ft
244.80
59
Sliding Window (Silver/Bronze) 4ft
7.5 ft
401.70
60
Casement Window 4ft (Silver / Bronze)
8.0 ft
462.40
STUDY ROOM
-
61
Supply Labour and Materials to lay cement screed (w/o tiles)
109.3 sqf
835.80
62
Supply Labour and Materials to Install Vinyl Only Flooring (Clip On)
109.3 sqf
826.50
63
Veneer Ply Casement Door (lever lock)
1.0 lot
387.60
64
- Solid Timber Door with Frame
1.0 lot
165.80
65
Bathroom Bottom Vanity Cabinet <4 ft
4.0 ft
550.80
66
- Soft Closing Door Hinge (BLUM)
6.0 lot
40.80
67
- Bottom vanity cabinet C/w Coloured PVC
4.0 ft
102.00
68
Fabricate & install Solid Surface (Cresto) <600mm; min. 4ft charge
4.0 ft
329.80
69
Supply labour to install wash basin
1.0 lot
63.80
70
FW Cab <8ft ht
4.0 ft
1,084.60
71
- FW Cab <8ft ht special design
4.0 ft
346.80
72
- <8ft ht c/w Coloured Pvc
4.0 ft
221.00
73
PD Door Acrylic (A001 - 024 series )
1.0 lot
344.30
74
- PD G-Lock
1.0 lot
28.10
75
Install CHB
2.0 ft
272.00
76
Casement Cabinet 8 ft ht
13.0 ft
3,160.30
77
- In Special Design
5.5 ft
397.40
78
- C/w Coloured PVC <8ft ht
13.0 ft
663.00
79
Study Table (suspended)
6.5 ft
911.70
80
- Study table c/w Coloured PVC
6.5 ft
165.80
81
- Blum Soft Closers Drawer H560 30kg
4.0 lot
285.60
82
Top Hung Cabinet < 4ft ht
6.5 ft
928.20
83
- Top Hung Cabinet W/ Open Shelves
6.5 ft
359.20
84
- Soft Closing Door Hinge (BLUM)
10.0 lot
68.00
85
- C/w Coloured PVC
6.5 ft
165.80
86
Supply Labour and Materials to Install Baseboard or Skirting (MDF)
27.5 ft
140.30
87
Casement Window 4ft (Silver / Bronze)
4.5 ft
260.10
88
Sliding Grilles (Silver/Bronze) 4ft
4.0 ft
95.20
BATHROOM 1
-
89
Demolish existing wall (HDB)
2.5 ft
144.50
90
- Make good (Major) (HDB)
1.0 lot
382.50
91
PD Door Acrylic (A001 - 024 series )
2.0 lot
688.50
92
- PD G-Lock
2.0 lot
56.10
93
Supply labour and Materials Hom. Tiles (<80sqf) (HDB), max. $3.20 psf with 10% wastage
1.0 lot
833.00
94
- Comes with Laying of Water Proofing
1.0 lot
306.00
95
Ceramic Wall Tiles (8 ft), max. $3.20 psf with 10% wastage
13.5 ft
1,101.60
96
Supply & install top hung windows (powder coated with wire mesh) 2ft<
1.0 lot
221.00
BATHROOM 2
-
97
Supply labour and Materials Hom. Tiles (<80sqf) (HDB), max. $3.20 psf with 10% wastage
1.0 lot
833.00
98
- Comes with Laying of Water Proofing
1.0 lot
306.00
99
PD Door Acrylic (A001 - 024 series )
1.0 lot
344.30
100
- PD G-Lock
1.0 lot
28.10
101
Ceramic Wall Tiles (8 ft), max. $3.20 psf with 10% wastage
13.0 ft
1,060.80
102
Supply & install top hung windows (powder coated with wire mesh) 2ft<
1.0 lot
221.00
103
Supply labour to install wash basin
1.0 lot
63.80
UTILITY ROOM
-
104
Supply Labour and Materials Laying of Homogeneous Tiles ($3.20 per sqf.)
60.0 sqf
612.00
105
- Comes with Laying of Water Proofing
1.0 lot
306.00
106
Casement Grilles 4ft (Silver / Bronze)
6.0 ft
163.20
107
Veneer Ply Casement Door (lever lock)
1.0 lot
387.60
108
- Solid Timber Door with Frame
1.0 lot
165.80
MISCELLANEOUS
-
109
4Rm/<1000Sqf Paint w/h (exc doors) w/f selected Nippon Paint (max. 5 colours including ceiling in matex) with oil based sealant
1.0 ft
1,606.50
110
Hacking / Haulage / Floor Protection Works
1.0 lot
318.80
111
- Whole house general/chemical washing
1.0 lot
323.00
112
- Provide sand & haulage; 4 Rm HDB
1.0 lot
1,071.00
113
- Laying of Floor Protection
1.0 lot
187.00
114
- Hacking Door (With Frame)
4.0 lot
299.20
115
- Hack and Replace Garbage Chute
1.0 lot
297.50
116
- Clearing of debris
1.0 lot
178.50
117
- 4 Rm - Floor/Wall Tiles/ Sink& Stove (Kitchen, Bedrooms, Toilets)
1.0 lot
3,451.00
118
Plaster whole wall (major); Kitchen
1.0 lot
1,530.00
119
Plaster whole ceiling & walls (major); Whole house; exc. kitchen - 4 Rms
1.0 lot
3,060.00
120
Plumbing Works (Accessories/Pipings)
1.0 lot
59.50
121
- Supply labour to install storage heater
1.0 lot
114.80
122
- Supply labour to install spray rinser / spray bidet
1.0 lot
38.30
123
- Supply labour to install accessories (per toilet)
1.0 lot
59.50
124
- Supply & install whole unit stainless steel (cold); 3/ 4/ 5 Rm (joint bath)
1.0 lot
688.50
125
- Supply & install Hot S/S Pipe 1 Toilet - 2 point
1.0 lot
198.90
126
- Supply & install Cold Water Pipe S/S - Kitchen
1.0 lot
436.10
Total
76,320.60