

kbp026
Members-
Content Count
59 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by kbp026
-
Happy, your toilet bowl really give you alot of headache... and that karin is another headache... Cool down man... kbp
-
I just cant stand the vehicle noise at night. Very noisy...
-
Hi Ms bean, you can complain directly to HDB ? Or write a complain letter and attention to their HOD/CEO ? The conceal waterpipe are installed by the HDB meh, so they should hold partial or full responsiblity for the poor quality of work that cause the water pipe to leak .... kbp
-
Happy, you are right! That is their favourite sentence ! But who will know that the flat has so many defect before we stay in it ... For example: the toilet bowl choked, water pipe leaking and metal gate lock faulty and more... All these problems will only surface when we use them. I heard that the Service Center are moving out in september. We better report all defects before they shift, or else have to go down to the Bukit Merah HDB branch and quene for hours there. kbp
-
Hi happy. You are right, she is fatter now ! One more thing to add - she does not answer phone call, just let it ring till the line cut off. Hi nemofc, The bsc lady’s job is to provide us the necessary information/helps when we encounter problem with the flat right (Regardless whether it is before renovation or after renovation)? At least she can give me the main contractor number but she did not, just ask me to find my contractor. She is just not helpful . Also, the hdb got problem with their QC, never check the flat properly before hand over to us. We paid $$$$ to buy the house, it is not a FOC flat from the government... After hearing so many stories/complaints from the neighbours, I feel that there are many defects all over the house, just waiting for us to spot them one by one. So scary…
-
Hi Happy, feel sorry to hear your story... I went to the BSC to report defect a few times in the past, personally I felt that the service center lady was not helpful at all. In fact, I was really disappointed with her service... Everything she will say not her work or not hdb jobs and push all blame to the owner . I really sad and angry! Then in the end, I got to spend $$ and find own contractor to solve the problem... I was really happy to get my Jalan Membina flat but very very disappointed with the after sale service provided by hdb ... I havn't move in already spot so many defects, dont know how many more problems will arise when I really stay in the house. kbp
-
Hmmm, still waiting for my bedhead, TV console and bathroom accessories to be installed and also the Electrician to put back the power socket covers. All the wires are still exposed, very dangerous... I think need another 2 more weeks for all work to be completed. Doing renovation is so tiring, so much thing to coordinate...I just hope that the final result is satifactory.
-
Hihi, curtain and mirrors installed last weeks. Many thanks to my designer, Jason for choosing the curtain's fabric and color to match our house. He had done a great job choosing the curtains ! Here are some pictures to share ! 1. Kitchen 2. Living room mirror and curtain 3. mbr curtain 4. study room
-
Nope, not the energy saving type. We use the normal halogen light. The spotlight is very bright, I only need to turn on 3 of them(above the kitchen cabinet) to light up the whole kitchen. The remaining 4 spotlights on the other side are for display only... My designer's idea ... Hehe
-
I see. I am going to the HDB service center tmomorrow to ask the staff there. Thanks for your reply.
-
Hi crazycar, I am confused. I thought that small hole is for the dirty water from the washing machine to flow out? If not, where does the washing machine water flow to ? Please advise Thanks kbp026
-
I only realise that we have same heading after I had set up the blog. Can you tell me how to change the subject heading? Thanks for teaching me to upload the photo. Picoodle is very easy to use and fast in uploading the image.
-
Hahaha, Total 7 spotlights in the kitchen. The orginal 2 lighting points (provided by HDB) will be terminated. The kitchen is very hot when I turn on the 7 spotlights together because the halogen light emit alot of heat. I regret to install so many spotlight now
-
thank u. My house still long way to go. I just hope the full height mirror can be installed asap... also I want to redo the living room painting - too dark liao. Your kids draw on wall??? Maybe they are our future artists... I saw ur blog, your house painting is very nice... How do u wash away the drawing lines on the wall ?
-
Hi, All Magazine sold except the Squareroom May-June 2008. Thanks for your interest !
-
Yes. The final result will look something like this for my study room and Master bedroom should look like this
-
More picture to share. 1) Living room with the lights on 2) Display cabinet 3) Kitchen spotlight 4) Kitchen cabinet doors (50% done) 5) Technogas hob
-
Hi sgpeace. I had replied u.
-
Hi Yang Guo, Thanks for your compliment. I bought the hanging light from Prima Lighting house, cost about $400 plus. The "shadow effect" on the wall and ceiling is very nice when I turn on the light at night.
-
More Magazines. 3) Home Concept April 2008 ($1.50) May 2008 ($1.50) 4) FORM ( featuring the projects from top design firms) Vol 5 ($1.50) Vol 4 ($1.50) I am willing to sell at $15 if you buy all together because I need to clear all of them before I moved to my new house. Thanks
-
Hi all, I have many magazine to sell away . Interested parties please PM me . Thanks 1) Squareroom May-Jun 2008 ($3.00) Mar- Apr 2008 ($1.00 Jan-Feb 2008 ($1.00) Special Edition( Key to your Home) $ 1.00 Jul-Aug 2007 ($0.50) Sept-Oct 2007 ($0.50) Nov-Dec 2007 ($0.50) 2) Home & Decor Feb 2008 ($1.00) Nov 2007 ($0.50) Oct 2007 ($0.50) Sept 2007 ($0.50) Aug 2007 ($0.50) July 2007 ($0.50)
-
Part 3 (Renovation in Progrss) 1) Living room (living room color is too dark, going to repaint one side of the wall with a brighter colour) 2) Foyer 3) Passageway 4) Kitchen 5) Common toilet (shower screen not yet install) 6) mbr (pastal colour) Bedhead Bedhead half done. Still waiting for the fabrication of the fabric. I have conceal one of the window in the mbr but the room is still very bright in the morning 7) mbr toilet 8) Room 2 9) room 3 Hanging light in the bedroom 3. That's all for today. I am going to Jalan Membina now to take more pictures... My ID told me that they are installing the mirrorsand shower screens this week. Hope everythings complete asap because I wanted to move in by July. There will be a full height mirror at the dinning area, next to my TV feature wall. I am so excited to see the final effect of the mirror... hope the mirror can really make my small living room look bigger. See you tmr . Bye....
-
Sorry, Washer and the hood picutures were not upload correctly. Now is the correct one.... 4) Technogas Hood 6) Bosch Washer 7Kg
-
9) Carpet ($250) 10) Kitchen sink and tap 11) Mbr toilet accessory 12) Serta bed (Design as below, fabric change to ivory leather) ($2999) 13) Aircon : Mitsubishi Starmax sys 3 (inverter) ($2800 plus) Next, I shall upload pictures of my house renovation in progress ...